Certified physical security

ArxBridge
Port-side commercial buildings with steel doors in Southampton

Services

Design in Southampton

Design for security doors, gates and shutters in Southampton, from survey and drawings to ratings and fitting, shaped around the port, campuses and venues.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Southampton
Prefer to talk?+44 7352 267239

Get a free quote in Southampton

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Southampton

What we supply in Southampton

More on this

Southampton grew around its docks, and that past still shapes the buildings here. Liners berth at the Queen Elizabeth II, Mayflower, City and Ocean terminals, goods pass through the dock estate, and the roads beside Ocean Village and Westquay stay busy with visitors, staff and deliveries. A design service here has to work with that mix: busy public fronts, service yards that never fully close, and plant rooms, stores and offices that sit close to the water.

ArxBridge provides design for security doors, gates and shutters in Southampton. The work starts with a survey of each opening and the way people and goods move through it, then turns that survey into drawings, a schedule and a written specification that a contractor can price and a facilities team can keep.

Southampton gives a designer plenty to work with. Two universities anchor the city. Southampton Solent University holds halls, labs, libraries and sports buildings across a large campus, and the University of Southampton does the same on its own sites. Southampton General Hospital runs wards, clinics and service corridors where doors must stay shut against fire and still open easily for beds and trolleys. On event nights the Mayflower Theatre and St Mary’s Stadium pull in big crowds, and Southampton Airport brings its own mix of staff areas, stores and public fronts.

Survey firstEvery opening measured and photographed before drawings start
Rated where neededForced entry, fire and blast ratings matched to each opening
Full scheduleOne schedule lists leaf, frame, hardware and access control
Local knowledgePort, campuses, hospital and venues shaped the details

What design covers in Southampton

A design package usually starts with the building as it stands. The survey notes each opening size, the build of the wall, the height of the floor, the headroom and the services that run near the door. It also notes how the door will be used: a main entrance opened hundreds of times a day, a plant room door opened about once a week, or a store door that must resist a forced entry attempt after hours.

The drawings then show the plan, the elevations and the sections for each doorset, with dimensions that a maker can work from and a fitter can check on site. The schedule sits beside the drawings and lists each opening by number, so that a door in a hospital corridor is never confused with a door of the same size in a store.

Design for the port and the waterfront

The docks and the cruise terminals set the tone for much of the work in Southampton. Terminal buildings handle large numbers of people in short bursts, with luggage, trolleys and staff moving through the same doors.

Buildings around Ocean Village and the waterfront face the same salt air and the same gusts, so the design should note the exposure of each elevation and choose a finish and a closer power to match. The steel and aluminium guide helps a specifier weigh the two leaf materials for a coastal site, and the specify security doors guide names the points to settle before a rating is chosen. For a fuller picture of the city, see physical security in Southampton.

Doors near the water need a finish and a closer chosen for salt air and wind. Note the exposure of each elevation on the survey, and let that note drive the hardware schedule rather than leaving the choice to the day of fitting.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Design for campuses, hospitals and venues

Campuses in Southampton mix old and new buildings, and the design should respect both. A hall of residence needs doors that resist forced entry and still let students pass with bags and bikes, while a laboratory needs controlled access and a door that seals well enough for the room behind it. The two universities run buildings where a single corridor can hold teaching rooms, offices and plant, so the schedule should give each door the rating its own room needs rather than the rating of the room next door.

Southampton General Hospital shows a different set of pressures. On event nights, St Mary’s Stadium pulls in big crowds, and the Mayflower Theatre does the same on show nights, so doors there must cope with crowds arriving and leaving, with panic hardware where the occupancy calls for it and a clear escape route that stays clear. Venue work should also note the Martyn’s Law tiers, standard from 200 to 799 and enhanced from 800. Royal Assent came on 3 April 2025, with a spring 2027 start expected. The specification mistakes guide lists the errors that turn up most often on such jobs, and the security consultancy in Southampton page covers the wider advice behind a single design.

Ratings and documents to settle early

Ratings should be settled before drawings are issued, because a late change of rating can alter leaf, frame and hardware all at once. The schedule examines LPS 1175 Issue 8.2 (September 2024) acting as the reference for forced entry ratings on the doors in the package, and the table below sets out the four ratings in plain terms. A rating should follow the risk at each opening: a store that holds valuable stock needs more resistance than an internal office door, and a door that faces a public street needs more than one that faces a locked yard.

The documents that support a design matter as much as the drawings. The maker should supply test evidence for the rating claimed, and the design should name the evidence to ask for rather than leaving it vague. For doors that also need a fire rating, the fire evidence should be named in the same schedule, with the rating and the test standard written out in full. The LPS 1175 standard page gives the background to the four ratings in the table.

LPS 1175 rating Attack time Typical use in Southampton
SR1, tool set A1 1 minute Internal doors and low risk stores
SR2, tool set B3 3 minutes External doors, plant rooms and shops
SR3, tool set C5 5 minutes High value stores and cash handling areas
SR4, tool set D10 10 minutes High risk rooms and secure stores

From survey to drawings

The path from survey to drawings follows a steady order. The survey starts the work, with measurements and photographs for every opening. The concept follows, with a short note on the rating, the leaf material and the hardware for each door type. The detailed drawings follow, with the schedule and the written specification beside them. Each stage gets a check before the next one starts, so that a wrong measurement is caught on paper rather than on site.

Fitting is part of the design, not an afterthought. The drawings should show the fixing points, the frame anchors and the clearances a fitter needs, and the specification should name the checks to run once each door is hung. Related work in the city includes security doors in Southampton and manufacture in Southampton.

How to start a design brief in Southampton

A good brief starts with the building and the problem, not with a product name. Send the address, the number of openings, a short note on what each room holds and any drawings or photographs you already have. Note the ratings you think you need, the access control you already use and any dates that shape the work, such as a term start, a refit or a planned shutdown.

Write to [email protected] and call for a design meeting to talk through the survey, the ratings and the drawings your job needs. You can also write from our block Saffron Road, Romford, Essex RM5 3ES call for a posted brief if you prefer paper, and the reply will set out the next step, the survey date and the documents to bring.

Does design cover gates and shutters as well as doors?

Yes. The design can cover pedestrian gates, vehicle gates, shutters and grilles beside the doors, with each item listed in the same schedule.

Can you design for a cruise terminal or a dock building?

Yes. Terminal and dock buildings need doors that handle crowds, luggage and service traffic, with finishes and closers chosen for salt air and wind. The survey should note the exposure of each elevation before the hardware is chosen.

What drawings and documents will we receive?

You receive plan and elevation drawings, a schedule that lists every opening by number, a written specification and a list of the test evidence to ask the maker for.

Do we need a rating for every door?

No. A rating should follow the risk at each opening, so an internal office door may need no forced entry rating while a store or an external door needs one. The design should record the reason for each rating beside the door it applies to.

Start your Southampton design brief with a survey and a clear schedule.

Get a free quote

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.