Certified physical security

ArxBridge
Canalside offices with a navy steel entrance door in Birmingham

Perimeter and HVM · PAS 68 and IWA 14-1

Security barriers Birmingham

Security barriers in Birmingham: fixed bollards, rising bollards, road blockers and beam barriers for city-centre frontages, chosen by how often the line opens.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Birmingham
Prefer to talk?+44 7352 267239

Get a free quote in Birmingham

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Birmingham

What we supply in Birmingham

More on this

A city-centre frontage in Birmingham is protected by a single line of barriers, chosen by how often each part of it must open. Fixed bollards guard the parts that never open, rising bollards guard the parts that open for authorised vehicles, and road blockers and beam barriers guard the parts that open all day. Every part of the line must stop the vehicle it is meant to stop, and no part may leave a gap a vehicle can use.

  • One line, four ways to openFixed, rising, blocker and beam
  • 1,200 mmMaximum clear gap between barriers
  • 500 mmMinimum height of a barrier in the line
  • PAS 68, IWA 14-1, ISO 22343-1Vehicle impact standards for rated barriers

The frontage as one line, not a row of products

A frontage fails at its widest gap, not at its strongest bollard. A rated bollard line beside an unprotected service entrance is not a line at all, because a vehicle will use the opening that is left. Walk the whole frontage before choosing anything: the car park entry, the main pedestrian approach, the service yard, the retail frontage and any side entrance. Each opening follows how often it must open.

The line can mix products, but it must not mix standards. Anything meant to stop a vehicle needs a crash rating that states the vehicle type and mass, the impact speed, the impact angle and the penetration distance, under PAS 68, IWA 14-1 or ISO 22343-1. Anything that only controls who may pass needs no crash rating, and it should be sold as access control, not as protection against a vehicle. The HVM standards guide compares the three standards.

Fixed bollards: the parts of the line that never open

Fixed bollards suit every part of a frontage that never needs to open: along a footway edge, across a retail frontage, around a pedestrian area. They are steel posts set in a tested foundation, with no moving parts, no power supply and no operator, so they cannot be left open by mistake. A bollard line with a marked pedestrian gap keeps the entrance closed to vehicles while people pass on foot.

A bollard rating covers bollard and foundation as one tested assembly, so the foundation drawing is part of the evidence to ask for, and a bollard set in a foundation that was never tested carries no rating to check. Where the ground will not take a deep foundation, a shallow foundation bollard is a separate tested product. Where a part of the line must open once in a while, a removable bollard in a socket covers it. The security bollards page and the guide to choosing HVM bollards cover the range.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Rising bollards: the parts that open for authorised vehicles

Rising bollards suit the parts of a line that must open for authorised vehicles and stay closed between them: a service yard entry, a car park entry, a civic or public realm frontage where deliveries and staff vehicles pass several times a day. The bollard sinks for an authorised vehicle and rises again after it, so the line is closed for most of the day and open only for the vehicle that needs it. Authorisation can be a key, a code or a remote control.

A rising bollard needs power, drainage and a service routine, and the fail state is part of the specification. A bollard that fails down leaves the line open, and a bollard that fails up blocks the vehicles that need to pass, so ask how each failure is handled and how staff release the bollard by hand. The pit must drain, and the mechanism must match the number of movements a day, not just the size of the bollard. Installers should demonstrate both before handover.

When the pit fills, the bollard tells the round first

A rising bollard line looks finished on the day it is handed over, and the real test starts a year later. Rain, grit, salt and fallen leaves find the pit, the mechanism works through every rise and fall, and the bollard that rose cleanly in summer may rise slowly after a wet winter. The service round is the place to catch that change, before a bollard stops halfway and leaves the line open to any vehicle that tries it. The the rising bollards page shows the parts that make up a rising unit.

On the round, lift the cover and look at the pit first. Water standing in the pit means the drain has failed, and a drain that has failed will take the mechanism with it. Check the seals for grit, the ram for wear, and the guides for any mark where the bollard rubs on the way up. Count the movements since the last visit, because a bollard that rises many times a day wears faster than one that rises a few times, and the service interval should follow the count, not the calendar alone. The the PAS 68 bollard foundations guide explains why the foundation and the pit belong in the same check.

A strike shows in the bollard before it shows in the paperwork. Look for a bollard that sits lower than its neighbours, leans a fraction, or rises with a new sound. Take that bollard out of the line until it is checked, because a struck bollard may still rise and fall while its rating is gone. The foundation is part of the rating, so a bollard that has moved in its foundation needs the foundation checked as well, not just the post above the ground. The the PAS 68 bollards guide sets out the rating facts the order should name.

Measure the gap again before the line is signed off

Put a tape across every gap in the line, including the ends, and write the widest figure on the record. No gap wider than 1,200 mm may stay, and no barrier lower than 500 mm may stay, because the line is only as strong as its widest opening. A rating names the vehicle mass, the speed, the angle and the distance the vehicle travels past the line. Test vehicles span a 1,500 kg car up to a 30,000 kg truck, and the speeds used in the tests are 48, 64 and 80 km per hour. The the HVM standards guide compares the three impact standards side by side.

Part What the round checks Sign it is failing What to do
Pit and drain Water level and silt Water standing after rain Clear the drain, then retest
Mechanism and ram Wear, grit and sound Slow rise or new noise Service the moving parts
Bollard and foundation Height, lean and line One bollard out of line Take it out of service
Controls and release Key, code and hand release Release that sticks Prove the hand release

Send the service record with the next enquiry, and let the guide to choosing HVM bollards shape the questions for the line as it stands now, not as it stood on the day it was handed over. The the security bollards page covers the range the line can draw on.

Road blockers and beam barriers: the parts that open all day

A road blocker is a plate that rises from the road surface and blocks the full width of a lane. It suits a car park entry or a service yard where vehicles pass all day and the line must close fast between them. A beam barrier is a horizontal beam across the lane that rises for each vehicle. The two do different jobs: a rated road blocker is built to stop a vehicle, while a beam barrier only controls who may pass, unless it carries a tested rating of its own.

The risk with any part that opens all day is the time it stands open. A beam barrier raised for one vehicle lets a second vehicle follow through, and a road blocker held down for a delivery leaves the lane open, so the routine matters as much as the product. Where the approach is straight and a vehicle could reach speed, a rated road blocker or bollard line is the honest specification. The anti-ram gates and barriers guide covers the rated options.

Line part Opens Stops a vehicle Needs
Fixed bollards Never Yes, if rated Tested foundation
Rising bollards For authorised vehicles Yes, if rated Power, drainage, service routine
Road blocker All day, between vehicles Yes, if rated Power, drainage, pit
Beam barrier All day, for each vehicle No, unless rated Power, duty rating

Pedestrian flow through the line

People must cross the line at defined points, not through gaps between bollards. The ProtectUK hostile vehicle mitigation guidance sets the spacing rule: a maximum clear gap of 1,200 mm between barriers, and a minimum barrier height of 500 mm. Gaps wider than that let a vehicle through, and lower barriers are easy to cross. The rule applies along the whole line, including the ends.

The pedestrian route through the line must suit everyone who uses it: people on foot, wheelchair users and pushchairs, staff and visitors, in both directions. A defined pedestrian gap, marked clearly and kept clear of parked vehicles, suits a frontage where people pass all day. Where the route needs control, a pedestrian speed gate gives a controlled lane, and the pedestrian speed gates page covers the options. Keep the pedestrian route away from the vehicle lane.

Retail frontages need the most care, because people cross from a car park to the shops all day. A bollard line along the frontage, with defined pedestrian gaps at the shop entrances, keeps vehicles out of the walking routes while letting people through. The retail sector page covers the same products for shops.

Walk the line before you buy it. The gap that lets a vehicle through is usually the one nobody measured: a service entrance left open, a gap wider than 1,200 mm, or a planter with no rating. Measure every opening, then choose the products.

Where the crowd gathers: New Street, the Bullring and the arena

Birmingham New Street is the busiest railway station outside London, and the station that reopened on 20 September 2015 sits below Grand Central, so trains, shoppers and people crossing the city centre meet in one place. A barrier line here must hold while thousands of people pass it, and it must let those people through at marked points, not through gaps left between bollards. The same test applies at the Bullring, which opened on 4 September 2003 and links to Grand Central by a covered link street, and at the Utilita Arena on King Edwards Road, which holds up to 15,800 people for concerts and indoor sport.

The Library of Birmingham stands on Centenary Square beside the Rep, and it opened on 3 September 2013 and is described as the largest public library in the United Kingdom. Victoria Square holds the Council House, completed in 1879 and still the seat of the city council, and both squares fill with people on foot through the day. The line in front of each one is a pedestrian line first and a vehicle line second, so fixed bollards suit the parts that never open, with a marked gap for people, while a rising bollard or a road blocker covers the service entry. The transport hub security requirements guide covers station entrances in full, and the retail sector page covers the same products for shops.

Reading the rating before the order: mass, speed, angle and penetration

A rating is a statement with four facts, and a quote that omits one of them is not a rating. Under PAS 68, IWA 14-1 and ISO 22343-1, the rating states the vehicle type and mass, the impact speed, the impact angle and the penetration distance. A rating written V/7500[N3]/80/90:0/0 names a 7,500 kg vehicle at 80 km/h striking at 90 degrees, with the figures after the colon recording penetration distance. Test vehicles run from a 1,500 kg car to a 30,000 kg truck, at speeds of 48, 64 and 80 km/h, so name the vehicle and the speed from the threat assessment, not from a catalogue. The vehicle impact ratings page sets out what a rating must state.

Count the peak number of people who may be present before naming a tier. Under Martyn’s Law, the standard tier covers premises where 200 to 799 people may be present, and the enhanced tier covers 800 or more. The Act received Royal Assent in April 2025, and it is expected to come into force in spring 2027. A venue that holds 15,800 people sits in the enhanced tier on its capacity alone, and a civic square that fills for an event needs the same count taken for the day of the event, not for a quiet weekday. The Martyn’s Law standards page sets out the tiers.

Place Who passes Line Evidence to ask for
New Street and Grand Central Travellers and shoppers Fixed bollards, marked pedestrian gaps Rating with mass, speed, angle and penetration
Bullring Shoppers from car parks and stations Bollard line, rising bollards at the service entry Foundation drawing for the tested assembly
Utilita Arena Up to 15,800 people on event nights Rated line at every vehicle approach Rating that matches the approach speed
Victoria Square and Centenary Square People on foot through the day Fixed bollards, one marked pedestrian route Gap no wider than 1,200 mm, height at least 500 mm

Put the crowd count on the schedule beside the rating. A line that stops the named vehicle at the named speed, with pedestrian gaps no wider than 1,200 mm and barriers at least 500 mm high, gives the buyer one line to check. Ask for the foundation drawing with the rating, because the bollard and its foundation were tested as one assembly, and a bollard in an untested foundation has no rating behind it. The security bollards page covers the range, and the guide to choosing HVM bollards covers fixed, removable and rising types.

Emergency access and the line that must give way

Fire, ambulance and police vehicles must be able to pass the line, and the method must be agreed before the line is built, not improvised on the day. A rising bollard or a road blocker can be lowered by a key switch, a code or a remote release held by the services, and a fixed bollard line needs a defined emergency opening, such as a removable bollard. Keep the emergency route clear and mark it on the site plan.

A power cut must not trap the site. Every powered part of the line needs a defined fail state, written into the specification, and a manual release that staff can use without tools or training. Test the fail state at handover, with the power off, and record the result. Venues that fall under Martyn’s Law should check the tiers on the Martyn’s Law standards page, since the physical measures in their security plan may include the barrier line.

Foundations, services and the ground under a city frontage

The ground under a city frontage is rarely empty: power, gas, water, drainage and telecoms may run under any part of the line. Mark every service route on the site plan before digging starts, and have installers confirm the positions on the ground before they break it. Moving the line to avoid a main is far cheaper than building over one, and a foundation that cuts a service will cost far more to fix than to move.

Where a deep foundation clashes with a service, a shallow foundation design is the tested alternative. Rising bollards and road blockers also need drainage for their pits and a power supply for each powered part, with cable routes that do not cross the pedestrian line. Where any part of the line sits on or beside the public highway, the council route is set out on the security gates in Birmingham page.

What to put in the enquiry

A good enquiry gives the supplier the facts the line depends on. Send the opening width for each part of the line, and say how often each part must open: never, a few times a day, or all day. Name the vehicle type and the speed the line must stop, and say which parts need a crash rating and which only need access control. Describe the ground conditions and what lies below, and say what power and drainage are available for the powered parts. Add the pedestrian route and the emergency access method.

Ask for the test evidence in writing for every rated part: the vehicle type and mass, the impact speed, the impact angle and the penetration distance, and the foundation drawing for the tested assembly. Ask for the maintenance schedule too, and for the fail state of every powered part to be written into the quote. The guide to choosing HVM bollards covers the same questions for a bollard line, the PAS 68 bollards guide explains the rating in detail, and the bollard regulations guide covers the rules for public places.

What is the difference between a fixed bollard and a rising bollard?

A fixed bollard never opens: a steel post in a tested foundation, with no power and no moving parts. A rising bollard sinks for an authorised vehicle and rises again after it, so it needs power, drainage and a service routine.

How wide can the gap be between barriers in a line?

No more than 1,200 mm clear between barriers, with a minimum barrier height of 500 mm, under the ProtectUK hostile vehicle mitigation guidance. The rule applies along the whole line, including the ends.

How do emergency vehicles get through a barrier line?

By a method agreed before the line is built: a key switch, a code or a remote release for rising bollards and road blockers, or a defined emergency opening in a fixed bollard line. Keep the emergency route clear and mark it on the site plan.

What happens to rising bollards and road blockers in a power cut?

Each powered part has a defined fail state, written into the specification: it fails down and leaves the line open, or it fails up and blocks vehicles, and staff release it by hand. Test the fail state at handover with the power off.

What should I send with an enquiry for a barrier line?

The opening width for each part of the line, how often each part must open, the vehicle type and speed the line must stop, the ground conditions and what lies below, and what power and drainage are available. Add the pedestrian route and the emergency access method.

Choosing security barriers in Birmingham?Send the opening widths, how often each part of the line must open, and the vehicle type and speed for a quote on a tested barrier line.
Get a free quote

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.