Certified physical security

ArxBridge
Waterfront offices with glass entrances and bollards in Cardiff

Services

Design in Cardiff

Design in Cardiff for the castle quarter, the bay, the stadium, hospitals and universities, from measured survey to drawings and a written specification.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Cardiff
Prefer to talk?+44 7352 267239

Get a free quote in Cardiff

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Cardiff

What we supply in Cardiff

More on this

ServiceDesign for doors, shutters and barriers
First stepMeasured survey at the Cardiff site
PapersDrawings and a written specification
ReplyAnswer within a day

Design papers turn a short brief into instructions that tell the manufacturer what to build and the fitter how to fit it, and their value rests on the measurements taken at the opening. Our Design service in Cardiff begins at the building, where the surveyor measures each opening, notes the wall behind the frame and records the use the door will see each day. The drawings and the written specification that follow name the dimensions, the rating, the materials and the fixings, so the buyer can order and check the finished product against the same papers.

This work fits a buyer who knows the building needs stronger protection but cannot name the rating, a facilities manager planning replacements across wards and lecture rooms, or a contractor pricing a tender who needs drawings that carry a price without extra questions. Cardiff gives the work its own shape: a castle and a stadium close to the centre, a bay with a barrage, a Senedd building beside the water, two universities and a large hospital, and a main station full of crowds all day. Physical security in Cardiff starts from those buildings and the way people move through them, with each opening designed from its own measurements.

Cardiff buildings that shape the design

The castle quarter asks for care with old stone. Openings there are narrow and walls are thick, and the frame must sit inside the reveal without cutting fabric that cannot be replaced. The survey records the reveal depth, the state of the stone and the line of the sill, so the drawing names a fixing for sound material and a finish that sits quietly beside the stone.

The stadium and the central station bring crowds through doors in short bursts. A door there needs a wide clear opening, hardware that survives constant use and a closer that shuts the leaf without slamming it. Hinges and closers are named for that load, and the drawings mark the hardware positions so every leaf is fitted the same way.

Cardiff Bay brings wind off the water to the frontages beside the barrage and the Senedd building. Doors there face driving rain and gusts that push at the leaf, so the drawings call for seals and a threshold detail that shut out the weather. The survey records how exposed each opening is, and the specification names a finish that stands up to the weather at that frontage.

Cardiff University and the University Hospital of Wales hold lecture rooms, wards and corridors where doors take heavy use from students and staff in groups. One leaf out of use for a morning can shut a route the wards rely on, so the drawings note the access times and the survey is timed around the departments. The drawings give a low threshold for wheels and handles that work while carrying notes or a tray.

What the Cardiff design papers name

Four decisions sit inside the papers, and each one is settled before the drawings are drawn. The rating says which attack or fire the product must resist. The dimensions give the opening as measured on the day, not as drawn on a plan from years ago. The materials list the frame, the leaf, the glass and the finish. The fixings say how the frame is anchored into the wall at each side. Leave one out and the fitter has to choose on the day, and a choice made on the day puts the rating at risk. The questions a buyer faces before the survey are set out in the guide on how security doors are specified.

The table names each decision, what the drawing shows for it and why it matters to the buyer.

Decision What the drawing shows Why it matters
Rating Forced entry class or fire class The attack or fire the product must stand up to
Dimensions Measured width, height and depth The size the manufacturer builds to
Materials Frame, leaf, glass and finish The look and the life of the product
Fixings Fixing type and positions How the frame is fixed to the wall

The class is written in full on the drawing, and the test record behind it is named beside the class so the buyer can check one against the other. SR2 sits at class B3, tested for three minutes, and SR3 sits at class C5, and the specification names the class and the attack time together. A class named on the drawing means little unless LPS 1175 Issue 8.2 (September 2024) can supply the test record behind it, so the papers point to the record rather than to a claim. The classes and the test behind them are explained on our LPS 1175 page. The LPS 1175 door guide walks through the choices a buyer meets. The guide on what keeps an LPS 1175 rating valid after fitting lists the things that can put that rating at risk.

Fire doors need the same match between paper and product. The class written on the drawing holds only if the test record describes the door as supplied, leaf, seals and hardware all the same. Name a fire class without the test record beside it and the buyer cannot tell from the drawing what was fitted, and the rating stated on BS EN 1634-1:2014+A1:2018 does not by itself prove the door as built matches the test. The fire ratings page gives the classes for doors that must hold back fire and smoke, and the guide on specifying fire doors in a housing tender shows how to word a fire class in a tender so the supplier can price it.

The order of a Cardiff design job

The work runs in a set order, from the first message to the papers the buyer signs. Give the building, the openings and the risk in the first message, and expect an answer inside one working day. On the visit the surveyor measures each opening, notes the wall behind the frame, stone, brick or block, and records the use the door will see. The measurements are drawn up and sent to the buyer, who checks them before the specification is written, since a change on paper costs nothing and a change after manufacture costs time.

With the drawings signed off, the specification lists each opening’s rating, standard and test record, and nothing goes to manufacture until the buyer has signed the package. Duties during the work are set out in the CDM 2015 duties guide, which names what the buyer owes and what the contractor owes while the survey and the fitting are under way, and the lead times guide gives the time each stage takes so the programme can be set around the survey and the manufacture.

Email [email protected] with the site address, the opening sizes and the risk each product must meet, and expect an answer inside one working day.

Take the reveal depth with the width and the height. A frame sized to the width and the height alone can still sit proud of a thick stone wall, and the depth is the figure an old plan most often gets wrong. Measure it at three points, since old stone is rarely square.

Questions Cardiff buyers ask about design

Will the design respect the old stone near the castle?

Yes. The survey records the stonework, the depth of the reveal and the state of the mortar, and the drawings are built around those figures. Fixings are named for stone, the finish is recorded beside the rating, and any limit on change is noted on the drawing, so the manufacturer works from the opening as surveyed.

Does the design cover the stadium and the station?

Yes. Crowds move through the stadium and the station in short bursts, so the design names wide clear openings, hardware built for constant use and closers that shut the leaf each time. The survey records the flow at each opening, and the finish is named for the wear the door will see.

What do you need from us before the survey?

Send the address, the openings you want designed and any sizes you already know, with a photograph of each opening. Note the wall material, stone, brick or block, and the risk the product must meet, and the surveyor will record the rest at the visit.

How do we check the fitted product against the papers?

Check the frame, leaf, hardware and fixings against the drawings, and the rating and the test record against the specification. Keep the signed papers after handover, since they show the next fitter what was fitted and what it was rated to resist.

Need a design package for a Cardiff building? Request a quote and tell us the address and the openings you want covered.

A Cardiff job often starts with security doors, and the installation and maintenance that follow work from the same signed drawings, so fitter and buyer judge the finished product against one set of papers. The guide to commissioning and handover sets out the checks at handover, and the acceptance and snagging guide shows how to record faults before sign off.

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.