Services
Manufacture in Cambridge
Manufacture in Cambridge for colleges, Addenbrooke's Hospital, the Science Park and the station, built to surveyed sizes and a written specification.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed in Cambridge
Get a free quote in Cambridge
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
Supplied and installed in Cambridge
What we supply in Cambridge
A Cambridge doorway that matches no stock size needs a doorset made to its own measure. Our manufacture work in Cambridge starts from the surveyor’s tape and ends with a doorset, screen or grille in steel built for one place, and every choice about rating, finish and fixing is agreed on paper before steel is cut. The signed specification goes to the workshop, the doorset is built to that sheet, and the finished product is checked against it before it leaves for site.
Cambridge sets the shape of the work. Behind old stone walls the colleges hold chapels, libraries, dining halls and courts, and King’s College Chapel draws visitors through doors that must lock at night and open for services by day. Addenbrooke’s Hospital runs wards, theatres and laboratories around the clock, Cambridge Science Park holds laboratories and offices behind fenced plots, and Cambridge station moves passengers between platforms, car parks and the city centre from early morning. The Fitzwilliam Museum holds galleries and stores on Trumpington Street, and Cambridge City Airport sits east of the city with hangars and offices of its own.
That is the work ArxBridge does in Cambridge, from the first survey to the finished doorset. The physical security in Cambridge page carries the wider Cambridge services, with the how to specify security doors page describing how a buyer states the rating before the workshop starts.
College courts, wards and laboratories: what Cambridge asks of a doorset
College walls are thick and uneven, so a frame needs fixings that grip solid stone, and the surveyor reads the reveal and the mortar before the workshop cuts anything. Tall court openings are measured at the pinch point, and the finish is chosen to sit quietly beside old stone.
Addenbrooke’s doors carry beds, trolleys and wheelchairs from morning to night, and a ward door shut for repair takes the corridor route the ward leans on. A doorset there must clear a bed, let a wheel over the threshold without a jolt, and offer handles a person with full hands can use. Science Park laboratories add doors worked by gloved hands, with sample and equipment stores behind them, so hinges, closers and locks are chosen for use all day long.
The station and the airport put wind, rain and crowds straight against their doors. Doors on those frontages need seals and thresholds that keep the weather out and hold the rating, and a coat that stands up to rain and salt air. Each opening gets a note on the wind and rain it faces, and the coating on the specification follows that note rather than a guess.
Cambridge City Airport hangars hold aircraft and offices, and their doors face the same wind and rain as the station frontage, with the threshold and seals picked for the weather that front takes.
At the Fitzwilliam Museum the public galleries sit beside stores that hold objects of value, so a screen or a grille must guard the store door without changing the look of the gallery front. That balance is covered in the museum security doors guide, while courts and teaching blocks sit in the university security doors guide.
Four choices settled on paper before the workshop cuts
Paper settles four choices before the workshop starts. The opening goes down exactly as the surveyor measured it, the threat sets the rating, the frame, leaf, glass and coating are named, and the fixing that holds the frame in the wall is named too. Miss one and the fitter must choose it on site, and a choice made on site is the choice that puts the rating at risk.
The specification reviews LPS 1175 Issue 8.2 (September 2024) reviewing the tools and the minutes each class must hold, so the test record can be read against the drawing. SR1 holds A1 for one minute, SR2 holds B3 for three minutes, SR3 holds C5 for five minutes and SR4 holds D10 for ten minutes, and the LPS 1175 page carries the tool set each class must resist. Screen glazing takes the classes LPS 1270 Issue 1.1 (2014) sets, and the LPS 1270 page carries them.
Martyn’s Law puts a hall holding 800 or more people at one time in the enhanced tier, and the law should begin in spring 2027. The rating for its doors follows the tier rather than the catalogue. The hospital security doors guide and the laboratory security doors guide carry the same rule into wards and laboratories.
Each workshop stage below carries the proof the buyer keeps from it.
| Stage | Settled here | Proof the buyer keeps |
|---|---|---|
| Survey | Measured opening, wall build, reveal depth | Sizes read back on site |
| Specification | Rating, frame, leaf, glass, coating, fixing | Four decisions signed on one sheet |
| Cutting | Frame and leaf cut, hardware positions marked | Cut sizes read against the drawing |
| Coating | Blast, prime and powder coat | Coat chosen for the weather the door faces |
| Checking | Test record read against the specification | Record number on the delivery note |
From first message to fitted doorset in Cambridge
Send the building name, each opening and the risk that sits behind it, and the first written reply carries a survey date. On site the surveyor tapes each opening at several heights, photographs the reveal and measures the wall behind the frame, so the workshop cuts from the wall as it stands rather than a plan drawn years ago. Drawings go back to the buyer for sign-off, and metalwork starts only after the signature, since paper changes cost nothing and changes after cutting cost days.
The fitter works from the signed drawings, the design team draws the package where the buyer asks for drawings, and the lead times and programme risks page lists the stages that stretch a programme. At handover the notes record each check run against the signed drawings, and the commissioning and handover guide lists the checks a handover should hold. The powder coating and shot blasting stages sit inside the same programme, so the finish is planned with the metalwork rather than after it.
Send the opening sizes to our Cambridge bakery Saffron Road, Romford, Essex RM5 3ES. Call today and name the mornings the building stands quiet, so the surveyor can measure while corridors stay clear. Email [email protected], please call the team about the written specification.
Notes for Cambridge buyers
Match the number on the delivery note against the specification before the wrapping comes off the doorset. A fitted doorset goes back slowly and at cost, and the number on the note is the proof that the pallet holds the product the paper names.
Questions about manufacture in Cambridge
What if a college opening is out of square?
The tape goes round the opening at several heights, and the frame follows the tightest reading, with stone fixings and packers marked on the drawing. An average reading would bind the leaf at the pinch point, so the workshop cuts to the reading that pinches.
Do the frame, leaf and hardware form one product or three?
One product. The frame, the leaf, the seals and the hardware positions are made and checked as a single doorset, and one test record covers the whole of it. A leaf bought apart from its frame leaves two records and no proof that the two belong together.
When can the delivery date be fixed?
Once the survey has fixed the size, the rating and the finish, since each of the three moves the workshop time. The lead times and programme risks page runs through the stages that stretch a programme. The survey date sits in the first written reply.
Which papers travel with the finished doorset?
The signed specification, the drawings for each opening and the test record for the rating the specification names. The test record number sits on the delivery note, and the handover sheet lists every check run on the fitted doorset.
Other areas
Manufacture in other areas
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.