Perimeter and HVM · PAS 68 and IWA 14-1
Security Gates in Reading
Security gates for Reading data centres, business parks and station forecourts, with LPS 1175 ratings, a written specification and a reply in one working day.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed in Reading
Get a free quote in Reading
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
Supplied and installed in Reading
What we supply in Reading
A large data centre cluster outside London has Reading at its centre, and the gates on those sites control every vehicle that enters, from delivery vans to maintenance trucks. A gate sized from the survey, rated from the threat assessment and driven by a motor matched to its leaf opens and closes through the working day without holding up the traffic behind it.
This guide covers the gate types that suit Reading openings, the ratings that sit behind them, and the steps from survey to a fitted gate. It names the standards the specification quotes, the checks to run at handover, and the papers to request before the order is placed. The security gates range holds the product behind the guide, and the Reading area page covers the town’s other rated work.
Reading openings where a rated gate earns its place
The Thames Valley data centre cluster puts vehicle gates at the front of many Reading sites. Halls, plant rooms and battery stores stand inside the fence line, and the gate controls every vehicle that enters. A sliding leaf suits a yard with a straight run beside the opening, while a swing leaf suits a narrower approach where the ground beside the gate is open. The data centre zones guide maps the layers from the fence line inward.
Light industrial units sit beside head offices and research units on the business parks around the town. The main gate carries staff cars in the morning and delivery vehicles through the day, so the leaf, the motor and the access control are sized for that flow, not for a quiet yard. Town centre retail adds a different demand, with delivery bays and service yards behind shop frontages, where the gate must close fast after each vehicle.
Reading station carries crowds through forecourts, taxi ranks and bus stops that sit tight against the building front. The gate line there must keep vehicles on their approach while people move on foot beside it, so the spacing, the height and the control are set with the station team before the leaf size is fixed. The transport hub security requirements guide maps station zoning in more detail, and hostile vehicle mitigation on the approaches is the first measure.
What the ratings mean on a Reading gate
The guide regards LPS 1175 Issue 8.2 (September 2024) regarding the grades from A1 to H20. A1 lasts one minute, B3 lasts three, C5 lasts five and D10 lasts ten, and the four are named SR1, SR2, SR3 and SR4. The threat assessment for the opening sets the class, and the test record names the class the gate was tested to.
ISO 22343-1:2023 is the scale vehicle impact ratings now follow. PAS 68:2013 was withdrawn, with 25 October 2023 as the date, and the same standard also replaces IWA 14-1:2013. PAS 68 gave way to ISO 22343-1, as the HVM standards guide explains. The anti-ram gates guide covers the gate types that carry a vehicle rating. The rating follows the vehicle, its speed and the run-out, and the scale is on the vehicle impact ratings page.
ProtectUK guidance for hostile vehicle mitigation gives the gap between the posts as 1,200 mm at most. The posts stand 500 mm high at least, and a wheelchair and a pushchair pass through while a vehicle cannot. The gap and the height go on the specification beside the rating, and the survey checks them against the ground as it stands.
Where a gate stands beside a fire doorset in the same wall, BS EN 1634-1:2014+A1:2018 assesses how a doorset holds back fire, with classes E, EW and EI running from 30 to 120 minutes. PAS 24 covers residential doorsets only, so it does not set the rating for a commercial gate. A pedestrian gate beside the vehicle lane answers to BS 8300 and Approved Document M, with the opening force below 30 N during opening, and below 22.5 N once the gate has turned past 30 degrees.
What to settle before the gate is ordered
The survey takes the opening width, the ground levels, the power supply and the way vehicles approach, and notes where pedestrians cross the vehicle lane. A gate sized from drawings alone can arrive too wide for its posts or too heavy for its motor, so the survey sheet, not the drawing, fixes the leaf size.
Where the frontage changes, planning permission may be needed, and a gate in a conservation area takes an application with the frame, the finish and the sightline drawn on it. The planning permission guide names the cases to check, and the frontage is recorded on the survey before any order goes in. What a gate job costs depends on the leaf, the rating and the ground, as the cost factors guide explains.
| Gate type | Where it fits in Reading | What to check |
|---|---|---|
| Sliding vehicle gate | Data centre yards with a straight run | The run beside the opening stays clear of stored kit |
| Swing gate | Business park entrances with room to open | The leaf swing clears parked cars and footpaths |
| Cantilever gate | Yards where the ground cannot carry a track | The counterbalance and the posts suit the leaf weight |
| Pedestrian gate | Station forecourts and staff entrances | The clear width and the opening force suit all users |
| Rising barrier | Delivery bays and car park entries | The arm, the loop and the control suit the traffic flow |
How a Reading gate job runs from survey to fitting
The opening and the approach are surveyed first, and the threat assessment for the site sets the rating. A written specification follows, naming the gate type, the rating, the leaf size, the motor and the finish, and the buyer signs it before the gate is made. Supply follows the specification, and fitting is phased so the site keeps working while the old gate is taken out and the new leaf is hung.
The fitting team stays in charge of later maintenance as well. The handover checks the leaf against the survey sheet, the test record against the specification, and the control against the traffic the gate will carry. The first answer to an enquiry arrives within one working day.
The checks to run before sign-off sit in the acceptance and snagging guide. What can stretch a programme is set out in the lead times guide. The manufacture in Reading service builds the gate to the surveyed sizes. The maintenance in Reading service covers the checks after fitting.
Measure the clear gap between the posts before the leaf is hung, and write the figure on the handover sheet. A gap wider than the specification lets a vehicle through beside the leaf, and a gap narrower than the figure traps the leaf against its own posts.
Questions Reading buyers ask about security gates
Can a sliding gate fit a data centre yard with no room beside the opening?
A sliding leaf travels on a run beside the opening, and that run must be at least as long as the leaf, so a yard with no room beside the gate takes a swing leaf or a cantilever leaf instead. The survey measures the run before the gate type is fixed, and the specification names the type that fits the ground as it stands. Where the yard is tight on both sides, a rising barrier with a pedestrian gate beside it can carry the same control.
What rating should a station forecourt gate carry?
The threat assessment for the approach fixes the rating, not the gate type. The assessment fixes the rating from the vehicle, its speed and the run-out after impact, and the rating sits on the specification beside the gap and the height between posts. A busy forecourt is checked against the Martyn’s Law tiers as well as the vehicle rating. The enhanced tier takes premises at 800 or more. The standard tier applies to premises with 200 to 799 people. The SIA regulates the scheme, and the statute is due to start in spring 2027.
Does a gate need planning permission in a Reading conservation area?
It may do, where the frontage changes or the building is listed. The application shows the frame, the finish and the sightline, and the planning officer is asked before the application goes in, so a second round is avoided. Much of the town’s commercial stock is modern, so a gate on a new estate often faces fewer planning limits, while a gate in a conservation area still needs an application.
How are sizes taken on a forecourt that is never level?
Levels are taken across the full width of the opening, and the posts are set to the highest point of the ground rather than to a middle reading. The leaf is measured against the survey sheet on arrival, so a slope across the forecourt does not leave the leaf scraping its track.
Ask for a quote for security gates in Reading. Email the gate sizes to [email protected] for heights and clear widths, and the team will reply within one working day. Write the company name first, and continue Saffron Road, Romford, Essex RM5 3ES; message tomorrow and the team will send a written specification. Get a free quote
Other areas
Security gates in other areas
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.