Certified physical security

ArxBridge
Granite office building with a heavy navy security door in Aberdeen

Perimeter and HVM · PAS 68 and IWA 14-1

Security gates in Aberdeen

Security gates for Aberdeen sites, from harbour yards to hospital entrances, rated and fitted with a written specification and a one working day reply.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Aberdeen
Prefer to talk?+44 7352 267239

Get a free quote in Aberdeen

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Aberdeen

What we supply in Aberdeen

More on this

A gate at an Aberdeen site has to do two jobs at once. It has to hold the boundary through a working day of deliveries, staff cars and service vehicles, and it has to keep opening and closing in weather that turns fast off the North Sea. A sliding gate at a yard in Altens, a swing gate at a depot in Bridge of Don and a pedestrian gate beside a hospital entrance at Foresterhill all face the same wind and rain, yet each one needs a different leaf, a different motor and a different way to fix the posts into the ground. Security gates from ArxBridge are built from measurements taken at the entrance, so the leaf meets the posts squarely and the motor is sized for the leaf it moves.

Aberdeen gives a gate more work than a quiet yard. Aberdeen Harbour moves goods and vehicles through the day, Aberdeen International Airport at Dyce runs service roads beside passenger routes, and the industrial estates at Altens and Bridge of Don hold yards where lorries turn all day. Westhill holds offices and workshops a short drive from the city, and Aberdeen Sports Village brings players, spectators and service vehicles through the same entrances on event days. Union Square and the Bon Accord Centre bring shoppers and delivery vans to the same service yards, and P&J Live brings event traffic that arrives in a short window and leaves the same way.

Hospital entrances ask for a different kind of care. The Foresterhill hospital site keeps ambulances, staff and visitors on separate routes, and a gate has to keep those routes apart without slowing an emergency vehicle. Marischal College and the granite frontages of Union Street show the other side of the city, where a gate has to sit well beside older stone. Before any leaf is ordered, a survey comes first, then the rating is settled in writing, and then a written specification names the grade, the leaf size, the finish and the hardware. The Aberdeen area page gathers the wider city work under physical security in Aberdeen.

Gate typesSliding, swing and pedestrian gates
RatingsSR1 to SR4 forced entry ratings
FinishGalvanised and powder coated steel
Reply timeOne working day

Where Aberdeen sites put a gate to work

Yards take the heaviest use. A yard in Altens or Bridge of Don sees lorries, forklifts and vans from early morning, and the gate there opens dozens of times a day while dust, grit and standing water work on the track and the rollers. A sliding gate suits that kind of yard because the leaf runs clear of the traffic behind it, and a cantilever leaf suits a wide opening where a ground track would clog with grit. The survey records the width, how the ground falls, the swing room the leaf needs and where power reaches the motor.

Campuses and public buildings use gates in a quieter way. The lecture sites at Old Aberdeen and Garthdee both need pedestrian gates that let students through in a flow at the start of a lecture and keep service vehicles to their own route. At Foresterhill, the gate lines at the two hospitals keep ambulance routes clear of visitor cars, and a pedestrian gate beside the vehicle leaf gives staff a way in on foot without opening the main leaf for every person.

Gate types and the rating that fits each one

The rating to name first is the forced entry rating. Tool set A1 gives SR1 a 1 minute hold, tool set B3 gives SR2 3 minutes, tool set C5 gives SR3 5 minutes and tool set D10 gives SR4 10 minutes, and the right choice follows the risk assessment for the site rather than the size of the gate. The standard behind those ratings is LPS 1175, and the guide to gates and grilles shows what the rating means for a gate leaf, its frame and its lock. Where a gate also has to stop a vehicle, the rating to name is ISO 22343-1:2023, which now carries the vehicle impact work of PAS 68:2013, a standard that left use on 25 October 2023, and the classes for that work are listed on the vehicle impact ratings page. The cost factors guide lists the items that push a gate price up or down, and the gate automation guide covers motors, safety edges and access control.

Gate Best place for it Rating to name
Sliding vehicle gate Yards and depots where the leaf can travel straight SR2 or SR3
Swing vehicle gate Entrances with room for the leaf to swing SR1 or SR2
Pedestrian gate Staff and visitor routes beside a vehicle gate SR1 or SR2
Cantilever sliding gate Wide openings where a ground track would clog SR2 or SR3
Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

What the survey settles before a price is given

The survey settles whether the gate still works in its second winter as well as its first. It records the clear opening, the fall of the ground across the entrance, the depth and condition of the ground the posts stand in, the power supply at the gate line and the way people and vehicles will use the entrance day to day. A gate at Dyce that serves airport service traffic needs a different duty cycle from a gate at a Westhill office that opens a few times an hour, and the motor, the gearing and the safety devices follow from that use. The survey picks LPS 1175 Issue 8.2 (September 2024) except where the risk assessment calls for a different standard. Access control and intercoms are agreed at the same visit, so the gate and the reader are specified as one system.

Once the survey sizes are in, the leaf, the posts and the frame are made to those sizes and the fixing positions are set out on the drawings. pedestrian gate beside the main leaf is worth agreeing at this stage, because staff on foot then have their own route and the vehicle leaf stays shut between vehicle movements. The written specification that follows names the rating, the leaf size, the motor, the finish and the hardware, and that written specification stays with the buyer as the agreed record for the job.

Ask for the rating in writing before the order is placed. A gate described only as strong leaves the buyer with no test to point to when the work is checked.

Planning, access and the day the gate goes in

A gate on a street frontage can need planning permission, and the height and position of the gate decide the question. The planning permission guide sets out the points to check before an order is placed, and the local planning authority is the place to confirm the position for a listed frontage or a conservation area. Powered gates also carry safety duties, and the powered gates safety guide covers force limitation, safety edges and the checks that follow fitting. Large event venues in the city fall in the enhanced tier of Martyn’s Law where they hold 800 people or more, with go-live expected in spring 2027, and the Martyn’s Law guide sets out what that tier asks of a venue entrance.

Fitting is planned around the site staying open. A yard gate is fitted in a window agreed with the site manager, the old gate is lifted only when the new posts are ready to take the leaf, and the motor, the safety edges and the entry controls are checked as one before the gate is handed over. The Aberdeen order is priced from the Romford workshop in Saffron Road, Romford, Essex RM5 3ES after the survey sizes arrive. The handover pack carries the specification, the motor settings and the maintenance notes.

Questions from Aberdeen buyers

Do I need planning permission for a gate in Aberdeen?

It depends on the site and on the height and position of the gate. A gate on a street frontage, a building with a listing or ground inside a conservation area is the case to check first, and the local planning authority confirms the position before an order is placed.

What rating should a yard gate in Altens carry?

Start from the risk assessment for the yard. SR2 suits most yards that hold stock and vehicles overnight, and SR3 fits where the threat runs higher. The LPS 1175 ratings list gives each rating with its hold time.

Can a sliding gate work where the ground slopes?

Yes, and the survey decides how. A cantilever leaf hangs clear above the ground, so a slope or uneven ground under the opening does not stop the leaf, and the survey records the fall across the entrance before the leaf size is fixed.

How long does a gate order take from survey to fitting?

The enquiry reply arrives inside one working day. The written specification follows the survey, and the fitting date is agreed once the sizes are confirmed and the leaf is in manufacture.

For a price on the gate, email the gate measurements to [email protected]; the team replies in writing within one working day, giving the leaf size, the motor size and the price for the job.

Get a free quote

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.