Certified physical security

ArxBridge
Waterfront offices with glass entrances and bollards in Cardiff

Perimeter and HVM · PAS 68 and IWA 14-1

Security Gates in Cardiff

Security gates for Cardiff yards, stadium, university, hospital and Bay offices, with LPS 1175 grades, fire minutes, automation and a written specification.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Cardiff
Prefer to talk?+44 7352 267239

Get a free quote in Cardiff

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Cardiff

What we supply in Cardiff

More on this

At the edge of a Cardiff site, the gate does the deciding. It lets the right lorry, van or visitor through, keeps the rest outside, and stays in place when someone pushes, climbs or drives at it. Docks and trade yards by the Bay, schools and hospitals across the city, car parks below housing blocks, the stadium on a match day and offices near Cardiff Central each ask that gate to do a different job.

A swing leaf fits a short entry with room to open. A sliding leaf fits a long boundary with room to run back. A cantilever leaf fits ground that cannot take a track. A foot gate next to the vehicle lane gives staff and visitors a controlled way in of their own. Width, ground, traffic and grade pick the form, not habit. Security gates are planned that way, entry by entry, rather than picked from a list.

Cardiff entries often sit tight against pavements and bus routes, with little room for a leaf to run back, and deliveries keep coming through the day. The paper should fix the gate type, the grade, the automation and the safety kit together, ahead of any digging. For the wider picture, see the physical security in Cardiff page.

Yards and depotsDocks, Bay and trade counters
Campuses and hospitalsUniversity, colleges and the Heath site
Stadium and leisurePrincipality Stadium and Bay venues
Offices and transportCentral station and Bay offices

Where Cardiff sites need a gate

Trade yards, builders merchants and depots around the docks and the Bay take heavy vehicles all day. A wide yard entry takes a sliding leaf on a track; where grit and standing water would choke a track, a cantilever leaf runs clear of the ground. Leaf, posts and footings carry the grade. The warehouse gates guide shows how a goods entry is planned beside a loading bay.

The Principality Stadium and other Bay venues strike a different balance. Gates there open for crowds, staff and deliveries at set times and stay shut between them, while a foot lane apart from the vehicle lane keeps people away from moving vehicles. Timed opening and clear steward routes count for more than a high grade on every leaf, and the paper should say which entries take the crowd and which take vehicles alone.

University buildings in Cathays and the University Hospital of Wales at Heath work around people all day. A university gate lets students, staff and deliveries through at set times, while a hospital gate keeps an ambulance way clear at every hour. A foot gate set apart from the vehicle lane keeps staff and visitors clear of vehicles, and the two lanes belong in one plan.

Offices near Cardiff Central and the Bay want a gate that matches the fence line and the door book. A gate on an office boundary stands beside fencing and bollards on the same line, and a gate over a basement car park lets residents in and out while holding the street outside. The gate cost factors guide shows what fixes the price, from leaf and posts to motor and digging.

Ratings that govern a Cardiff gate

Gates take their forced entry grade from the LPS standard. SR grades pair a tool set with a timed attack, so the grade names the test the gate must pass. A yard gate that faces only hand tools can take a lower grade than a gate on a plant room, if LPS 1175 Issue 8.2 (September 2024) needs the tool set and the attack time behind each grade written down in the same paper. The LPS 1175 standard page shows all SR grades. The guide to keeping a rating valid explains what can void the grade after the gate is fitted.

A gate that closes a fire line needs its minutes named as well. For a gate on a fire line, the minutes it must hold are proved by a test, and the test is named before BS EN 1634-1:2014+A1:2018 for the gate is ordered, so the minutes can be checked against the test record. The fire ratings page explains how those minutes are proved. A gate clear of any fire line needs no fire minutes, and the paper should say so in plain words rather than leave the point open.

Impact from a vehicle is judged apart from forced entry. The current vehicle barrier standard is ISO 22343-1:2023, which superseded PAS 68:2013 after that standard was withdrawn in October 2023. Ask for the ISO class, the weight and speed of the vehicle and the penetration figure written beside it, and do not accept a PAS 68 class as current for new work. The current scale is set out on the vehicle impact ratings page.

A motorised leaf needs edges that sense contact, beams that watch the opening and a force limit that halts the leaf on meeting a person or a vehicle. The controls then fail safe, so people still have a way out when the power fails. The acceptance and snagging guide sets out the checks to make ahead of sign off, covering the safety kit and the force limit.

Cardiff site Gate form Grade to ask for Control
Docks and Bay yard Sliding leaf or cantilever leaf SR2 or SR3 Intercom with keypad
Principality Stadium and event venues Vehicle leaf with foot lane SR2 Entry control and timed opening
University and hospital sites Vehicle leaf with foot gate SR2 Card reader and timed opening
Central station and Bay offices Sliding vehicle leaf, tall fence line SR3 Card reader and intercom
Housing estate car park Swing leaf or sliding leaf SR2 Fob reader and intercom

A gate ordered by size alone is a guess. The grade, the ground and the controls must be settled in the same document, or the gate will be fitted to the wrong job.

How a Cardiff gate project runs

It starts with a visit to survey the site. The surveyor measures the opening, reads the ground and the slope, finds what services run below the entry and notes when vehicles come and how often. A gate that opens for lorries all day wants another track and motor than a gate that opens a few times a week, and those facts are found on site rather than on a plan.

The paper itself comes next. It names the gate form, the grade, the motor and the safety kit for that entry, so each supplier prices the same job from the same paper. The commissioning and handover guide lists the records that travel with the gate, covering test records and care notes.

Digging comes first, then leaf and motor, then safety kit and controls, with each stage checked ahead of the next.

Once the gate is handed over, the fitting team passes the job to the maintenance service, which keeps gate, motor and safety kit working as the site is used. A gate checked often keeps its grade and its safety kit in order, and the handover pack records what to check and how often.

Frequently asked questions

Should a Cardiff yard take a sliding gate or a swing gate?

Width, room for the leaf to run back and the ground below it decide. A swing leaf wants clear room to open, a sliding leaf wants room to run back, and a cantilever leaf suits a yard where grit and water would choke a track. The survey fixes the form ahead of any digging.

Can a gate handle crowds at the Principality Stadium?

Yes, with timed opening, a foot lane apart from the vehicle lane and clear steward routes. The two lanes belong in one plan, so people on foot never share a lane with vehicles, and the paper says which entries take the crowd and which take vehicles alone.

Does a security gate need a fire rating in Cardiff?

Only where the gate closes a fire line. Then the minutes and the test behind them are named in the paper, so the minutes can be checked against the test record. A gate clear of a fire line needs no fire minutes, and the paper should say so in plain words.

What keeps a powered gate safe for people on foot?

Edges that sense contact, beams that watch the opening and a force limit that halts the leaf on meeting a person or a vehicle. The controls fail safe, so people still have a way out when the power fails. The kit is checked at handover and at each visit after that.

Get a gate specified for your Cardiff site

Send the width of the entry, the ground below it and a photo of the opening. A survey date and the next move reach you inside one working day. Contact ArxBridge to begin.

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.