Certified physical security

ArxBridge
Red-brick and glass offices with steel entrance doors in Belfast

Services

Installation in Belfast

Installation in Belfast for security doors, shutters and gates, from survey and written specification to fitting and handover papers for each opening.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Belfast
Prefer to talk?+44 7352 267239

Get a free quote in Belfast

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Belfast

What we supply in Belfast

More on this

An installation in Belfast starts long before the first doorset reaches the site, and it ends only when the handover papers are in the buyer’s hands. The survey records each opening, the rating fixes what each doorset must hold back, and the written specification names the finish, the hardware, the frame and the leaf for every opening on the job. Fitting then follows that document line by line, so what arrives on site matches what was agreed.

Fitting at the Royal Victoria Hospital must work round wards in daily use, and fitting at Queen’s University Belfast must fit between teaching days. Ulster University halls ask for the same timing, with work fitted round lectures. Belfast City Hall keeps its public rooms open while work goes on behind them, the Titanic Quarter holds offices and visitor spaces beside Belfast Harbour, and Belfast City Airport keeps travellers moving through halls where the routes out must stay clear. Each of those buildings asks for a programme shaped to its own days and the people who move through it.

Work opens with a survey that records the size of each opening, the wall it sits in, the rating it needs and the traffic through the door each day. That visit yields a written specification for the Belfast order. The lead times guide shows what stretches a programme and what holds it to its dates. Send the opening sizes with the job, and the written answer follows in one working day.

SurveyEvery opening measured before anything is ordered
SpecificationWritten specification naming the rating, leaf and hardware
HandoverTest reports, specification and care notes handed over
ReplyReply in writing inside one working day

How a Belfast installation runs, step by step

The work runs in five stages, with the survey first and fitting last, and the rating, the specification in writing and supply between them. None is left out. The survey checks each opening and notes the wall it sits in, the rating it needs and the traffic through the door each day, and the rating is fixed from the risk at that opening rather than from a guess. The specification then names the finish, the hardware, the frame and the leaf, and supply holds until every item is set down in writing. Installation fits each doorset to the specification as written, and the design service in Belfast and the manufacture service in Belfast sit behind the doorsets that reach the site.

Lead times move with the size of the order and the rating each doorset must hold, and a rated leaf takes longer than a plain one. The lead times guide sets out the programme risks that catch a Belfast job, from late drawings to openings that measure differently on the day. The CDM 2015 duties guide shows who plans the work, who checks it and what each side owes while fitting goes on.

Ratings and the doorset that needs them

The Belfast order fears LPS 1175 Issue 8.2 (September 2024) fearing a grade set without a survey, so the rating is fixed only after the survey records the risk at each opening. Grades run from A1 to H20, with one minute beside SR1, three beside SR2, five beside SR3 and ten beside SR4, and the specification carries the grade for each opening.

Where a doorset needs a fire rating, E, EW and EI are the classes, with minutes spanning 30 to 120. BS EN 1634-1:2014+A1:2018 sits behind the test. The fire ratings page gives each class and its meaning for the opening, and the fire rated steel doors page describes the doorset that carries the rating. A doorset with no fire risk takes its grade from the forced entry risk alone, and that grade is written down before anything is ordered.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Belfast buildings and the work each one needs

Belfast building Work Handover papers
Royal Victoria Hospital Fitting stair and corridor doorsets round wards in use Test reports and care notes for each doorset fitted
Queen’s University Belfast Fitting lecture hall and stair doorsets between teaching days Written specification and test reports for the job
Belfast City Airport Fitting hall doorsets with the routes out kept clear Care notes and the written specification for each opening
Titanic Quarter Fitting office and visitor space doorsets in stages Test reports for each doorset, with the specification kept on file
Belfast City Hall Fitting public room and back corridor doorsets Written specification and care notes for the doorsets fitted

The table above lists five Belfast buildings, each with the work it needs and the handover papers that follow it.

Handover papers and the duties around the work

When fitting ends, the buyer receives the test reports, the written specification and the care notes for each doorset on the job. The commissioning and handover guide shows what a full handover holds and why each paper matters later, when a door is checked or a part is changed. The papers stay with the building, so the next person to work on a doorset starts from what was fitted rather than from a guess.

Care after fitting falls to the maintenance service, and the fire door maintenance guide with the fire door inspection checklist shows what to check and how often. Hospital work in Belfast follows the fire door regulations guide for hospitals, and rated leaves carry the papers the fire door certification guide names.

Public premises in Belfast and the tiers that apply

Martyn’s Law reaches public premises in Belfast too. The tier comes from the headcount: 200 to 799 on site means standard tier, and 800 or more on site means enhanced tier. Regulation is expected to fall to the Security Industry Authority when the scheme begins, and spring 2027 is the expected start. City Hall and the Titanic Quarter hold public spaces that may come within the law. The tier is fixed from the headcount before any doorset is ordered, since the tier shapes the doors and the way people leave the building.

The premises guide lays out what each tier owes. The Martyn’s Law standard names the tier figures. The wider picture of physical security in the city appears on physical security in Belfast, and the security doors in Belfast page describes the doorsets that sit beside the fitting work.

From first visit to handover in Belfast

The work runs from first visit to handover, with the survey first and the handover papers last. None is left out. The survey takes the size, the wall, the rating and the daily use of each opening, and that visit shapes the specification. The specification lists the finish, the hardware, the frame and the leaf, and fitting holds off until the list is complete. Handover then passes the test reports, the written specification and the care notes to the buyer, so the job is closed with papers in hand.

Email [email protected] thinking about the openings you need fitted, and a written reply lays out the Belfast scope and the step after that.

Address the envelope with the opening drawings to compare Saffron Road, Romford, Essex RM5 3ES. Head first once the drawings go in the post, and the survey can be booked once they arrive.

No doorset is fitted until the written specification names the rating, the leaf and the frame for its opening, with the hardware listed beside them.

Belfast buyers ask about installation

What happens first on a Belfast installation?

A survey comes first. The survey notes the size, the wall, the rating and the daily use of each door, and that visit shapes the written specification. Nothing is ordered until the specification names the finish, the hardware, the frame and the leaf for each opening.

What papers are handed over when the work is done?

The buyer receives the test reports, the written specification and the care notes for each doorset on the job. The handover guide shows what a full handover holds, and the papers stay with the building for the next person to work on a doorset.

Does a Belfast installation need a fire rating on every doorset?

Only where the opening needs one. A rated doorset takes class E, EW or EI, with a rating from 30 to 120 minutes. A doorset with no fire risk takes its grade from the forced entry risk alone.

How long before a written quote for installation in Belfast arrives?

The survey notes the size, the wall, the rating and the daily use for each opening, and that visit sets the specification. The written answer comes back in one working day and names the next step.

Ask about installation for your Belfast building

Give the opening sizes with the job you need done. The written quote names the rating, the leaf and the work. Get a free quote

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.