Blast · ISO 16933 EXV45 to EXV10
Blast resistant doors in Leeds
Blast resistant doors for Leeds station, the Infirmary and university entrances, rated to ISO 16933 with leaf, frame and glass as one doorset.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed in Leeds
Get a free quote in Leeds
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
Supplied and installed in Leeds
What we supply in Leeds
First Direct Arena empties thousands of people through its exits in a short spell, Leeds station keeps its concourse doors moving from dawn to the last train, and Kirkgate Market fills its hall with traders and shoppers by mid morning. A blast resistant door in any of those places must absorb a pressure wave, keep its leaf in its frame, and shield the crowd on the safe side.
Leeds General Infirmary works on a slower rhythm. Beds move between wards through the night, trolleys roll into clinics at all hours, and families arrive at the main entrance from dawn. Lecture rooms at the University of Leeds fill and empty in waves, and the library doors at Leeds Beckett University turn over students from morning seminars to evening study.
One building can ask for several grades at once, because the risk at a cash office differs from the risk at a reception desk. Leaf, frame and glass earn their grade as a single unit, and a leaf tested away from its own frame holds no grade. The physical security in Leeds page has more on the city.
Where a Leeds blast door stands
Arena exits face the sharpest crowd pressure. Thousands leave at once after a show, so the doors there must open fast, shut firm, and still carry their blast class. The university doors guide covers lecture hall and library entrances, where the crowd arrives in waves rather than one surge.
Hospital doors work to a different rhythm. A ward leaf opens quietly for a bed at three in the morning, a clinic leaf opens for a trolley at midday, and the entrance leaf meets visitors all day. The hospital doors guide covers ward and clinic openings.
A market hall door meets traders with trolleys before dawn and shoppers with bags by mid morning. A solid leaf suits a cash office hidden from the street, while a glazed leaf suits a reception desk that needs to watch the pavement. The choice between the two is weighed in the glazed or solid blast doors guide.
Civic rooms round the Town Hall and the Civic Hall serve staff, councillors and visitors through the working day. Their doors take a blast load and still serve as everyday doors, opening and shutting without a heavy push.
Reading the blast and forced entry figures
Each Leeds schedule detects LPS 1175 Issue 8.2 (September 2024) detecting the forced entry grade beside the blast rating at that doorway. Ten minutes goes with SR4 and D10. Five minutes goes with SR3 and C5. Three minutes goes with SR2 and B3. One minute goes with SR1 and A1. All four grades sit side by side in the table on the LPS 1175 standard page.
ISO 16933 gives the blast test its two classes. EXV covers a blast from a vehicle at a set distance, SB covers a blast from a device a person carries, and EN 13123 with EN 13124 gives the European EPR and EXR classes to match. The blast ratings list covers the full range, and the EXV or SB guide sets the two ISO 16933 classes side by side.
Five Leeds openings show how the choice lands in practice.
| Doorway in Leeds | Build | Blast | Forced entry |
|---|---|---|---|
| Arena exit, First Direct Arena | Two leaves, glazed | EXV (ISO 16933) | SR3 (C5) |
| Cash office, Trinity Leeds | One leaf, solid | SB (ISO 16933) | SR3 (C5) |
| Emergency entrance, Leeds General Infirmary | Single leaf, glazed | EXV (ISO 16933) | SR2 (B3) |
| Market hall door, Kirkgate Market | Single leaf, solid | SB (ISO 16933) | SR2 (B3) |
| Station entrance, Leeds station | Two leaves, glazed | EXV (ISO 16933) | SR3 (C5) |
LPS 1270 Issue 1.1 (2014) grades the glass beside a rated leaf, and the classes are on the LPS 1270 list. The blast windows cost and specification guide gives costs and classes for blast windows. RC1 to RC6 are the burglary grades in BS EN 1627:2021. Since 25 October 2023, PAS 68:2013 has been withdrawn, and ISO 22343-1:2023 stands in its place. A schedule that still quotes PAS 68 needs new wording.
Picking the leaf, the frame and the glass
Sizes come first. The clear width, the clear height, the wall round the opening and the swing of the leaf are measured before any class is fixed, and a hospital leaf busy all night earns a different class from a theatre leaf busy for two hours. The wall round the opening must hold the frame, so its build counts as much as the width.
The three parts are picked together on one schedule line, never one at a time. Hinges and fixings follow the weight of the leaf, and a frame too light for its leaf leaves the whole doorset unrated. For the order of those choices, see the ten steps to specify guide.
A leaf opened by hand must meet BS 8300: the push is 30 N at first, then 22.5 N when the leaf passes 30 degrees. When the power drops overnight, the lock still holds. The closer on a station concourse keeps pace with the crowd through the day. With Martyn’s Law due to arrive in spring 2027, the enhanced tier begins at 800 people. 200 people is where the standard tier begins, and it runs to 799.
A visit to each Leeds doorway
Width, height, wall build and swing go in the notes for each opening, with power points and access points beside them, and a note on how people move through the building. A visit comes before the schedule is written. Photos and sketches from the visit go to the job file. The schedule is written from those notes.
Widths, heights and blast classes for each doorway are noted in the record under our Leeds arbour Saffron Road, Romford, Essex RM5 3ES. Post thursday, the folder for each doorway gains its width, height and blast class beside the sketch.
Write the opening sizes for each doorway to [email protected] to prices, with leaf, frame and glass as one doorset and the blast class named for each doorway.
One more check on the street
Walk the pavement in front of each doorway before the class is fixed. A forecourt softens the load, an open pavement hardens it, and the ground in front of the leaf is part of the rating.
Give the schedule a final read before the order goes out. Match each leaf size to the visit notes, each blast class to the ground in front of its doorway, and each forced entry grade to the risk at that opening. A class fixed from a drawing alone, without a look at the street, can miss the very thing that sets the rating.
Blast resistant doors in Leeds: what buyers ask
If a door passes a blast test, does it pass a forced entry test too?
No, it does not. A blast test on its own proves only the blast class. A forced entry test uses hand tools against the clock. The schedule names both figures at each doorway.
Can a glazed leaf in Leeds keep its blast rating?
Yes, where leaf, frame and glazing pass the test as one doorset. LPS 1270 grades the glass for the leaf. The glazed or solid blast doors guide compares the two builds for doorways that need a view through them.
What sets the timetable for a Leeds blast door?
The visit sets it. The visit leads, the rating follows, and the specification is written from the rating. Stages that shape the timetable are covered by the lead times and programme risks guide.
How should a Leeds blast door be looked after day to day?
A set pattern of checks. Each check opens at the leaf and the frame, moves on to hinges, lock, closer and fixings, and swaps out any part worn down before it breaks down. The security door maintenance checklist guide is where the checks for each day are named.
Need a blast door in Leeds?
Send the sizes for each opening, with its blast class. Leaf, frame and glass as one doorset are in the price.
Ask about a Leeds blast door today.
Other areas
Blast resistant doors in other areas
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.