Services
Installation in Leeds
Installation in Leeds for security doors, frames and hardware, from survey and fitting to testing and a signed handover, planned round each building.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed in Leeds
Get a free quote in Leeds
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
Supplied and installed in Leeds
What we supply in Leeds
Installation in Leeds begins long before a leaf is lifted onto its hinges. The opening has been taped, the frame has been built to that tape, and the ironmongery has been picked for the rating written against the opening, so the leaf sits true on its hinges, the latch finds its keep first time, and the closer draws the leaf shut without a bang. A ward leaf, a teaching room leaf and a ticket office screen all pass through the same fitting routine, and the routine bends round the building rather than the other way round, so wards keep running, classes keep meeting and crowds keep moving while the fitting team works round the building.
Leeds station keeps its concourse busy from the first train to the last, the University of Leeds fills its rooms through term, and Elland Road and Headingley Stadium fill on match days. Trinity Leeds and Kirkgate Market draw shoppers through the week, and Leeds General Infirmary keeps its wards running round the clock, so each place wants the work shaped to its own rhythm. The city overview follows from our page on physical security in Leeds, which places each fitting job beside the wider Leeds picture.
Beside every opening, the written schedule answers LPS 1175 Issue 8.2 (September 2024) bottling the rating next to the leaf, its frame and its ironmongery, which keeps the test evidence tied to that exact set from bench to brickwork. Under that same standard, an SR2 leaf, also graded B3, stands against attack for three minutes. That rating stays valid only when leaf, frame, lock and fixings all match the set that passed the test. Attack times for each level sit on the LPS 1175 page, with every level shown beside its attack time and its tool set.
From survey to signed handover
Every job opens with a look at the building itself. The fitter tapes each opening in three places, reads the wall beside it, checks the floor for fall, and notes pipes and cables that pass near the frame, since a cable in the fixing line changes the anchor choice. Those notes settle leaf size, frame depth and anchor positions while the leaf is still uncut, and they settle the route the finished leaf takes through the building.
Back in the workshop, each leaf, frame and ironmongery set is made to the measures and the rating written against its opening on the signed schedule. On the fitting day the old leaf is taken out first, the new frame goes in true in both planes, and the leaf is hung, packed and checked before the crew steps to the next opening.
Once the leaf is hung, the crew puts it through its paces. The leaf swings through its full travel, the closer is tuned until the leaf meets the frame with a soft touch, the latch is shot and drawn back, and the margins beside the leaf are measured off the schedule. Anything that wants a second look goes on the snag list, and nothing is signed off until that list is clear. The snagging checks guide runs through the same order for a reader who wants the detail, and the handover notes guide shows what goes into the file the site team receives. The specifying a door guide works through the choices that settle the rating for each opening.
Fitting round a live building
At Leeds General Infirmary, ward leaves go in during the quiet spells the ward sister picks, with sheets laid over the floor and the corridor left open for beds and trolleys. Across the University of Leeds campus, teaching room and laboratory leaves go in between teaching blocks, so a room is ready again before the next class walks in. Ward and corridor work is covered in our hospital doors guide, and teaching rooms and laboratories are covered in the campus doors guide.
Screens and leaves beside the concourse at Leeds station go in during the quiet spells, with travellers kept moving past the work. In Trinity Leeds and Kirkgate Market, shopfront work follows trading hours, so a unit keeps trading through the day and the fitting runs once the shutters are down. At Elland Road and Headingley Stadium, concourse and hospitality leaves go in clear of match days, when the crowds have gone and the crew can take a whole stand in one call. The station security guide goes further into concourse work.
Where a building wants new leaves now and steady care later, maintenance visits work from the same leaf list, so the record opened at fitting runs straight into the first round. security doors in Leeds often share one programme with fire rated steel doors in Leeds, and both are put through the same handover checks before the crew leaves.
What each stage checks
| Stage | What is checked | Who signs it off |
|---|---|---|
| Survey | Opening sizes, wall build up and floor level | Site manager and fitter |
| Manufacture | Leaf size, rating and hardware against the schedule | Workshop lead |
| Fitting | Fixings, gaps, closer action and lock throw | Lead fitter |
| Handover | Test record, keys and care notes passed to the site team | Site manager |
The table keeps every stage answerable. A size missed at the survey stage turns up at fitting, a fixing missed at fitting turns up at handover, and a note missed at handover turns up at the first care round. Each stage therefore carries its own sign off, and the handover file names every leaf beside its size, its rating and its key number.
Settle the fixing detail before the workshop starts cutting. A wall that wants a different anchor, or a floor that falls away from level, is far easier to sort at the survey stage than once the leaf has been built.
Leeds buildings and their doors
The centre hands each building a different job. Leeds station wants screens and leaves that stand up to a concourse that never empties, the University of Leeds wants teaching room and laboratory leaves that close softly between classes, and Leeds General Infirmary wants ward leaves that let beds and trolleys pass without clipping the frame. Trinity Leeds and Kirkgate Market want shopfront leaves that take a full week of daily use, while Elland Road and Headingley Stadium want concourse leaves that hold on match days and rest between fixtures.
Send drawings to our court Saffron Road, Romford, Essex RM5 3ES ask in writing before you post them, and mark the envelope for the Leeds fitting team. Email [email protected] for help with opening sizes, ratings and the order of work across your floors. Ask for a survey slot that suits the site team in your email.
Frequently asked questions
How long does fitting take for one door?
The opening, the wall and the ironmongery set the pace. One leaf in a sound opening is commonly hung and checked in a single visit, while a run of leaves across a floor is planned opening by opening and takes more visits. The survey settles the order of work before any slot is booked.
Can fitting happen while the building stays open?
Most buildings stay in use through the work. The crew takes one opening at a time, lays sheets, keeps a clear route through, and puts up hoarding where the site asks for it. Wards, teaching rooms and trading floors keep running, and loud work is placed in the quiet spells the site manager has picked.
What is checked at handover?
Every leaf is swung, every closer is tuned, every latch is shot and drawn back, and the margins beside each leaf are measured off the schedule. Keys are counted and named in the list, the test record passes over with the care notes, and any snag found on the day is written down with its fix before the crew leaves.
What happens if the wall needs extra work?
The survey catches it at the measuring stage, and the fixing detail is settled with the site manager before the workshop cuts a single leaf. A wall that asks for a different anchor or a stronger fixing is sorted at that point, so the fitting day holds no surprise and the work runs to the agreed list.
Other areas
Installation in other areas
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.