Services
Security Consultancy in Leicester
Security consultancy in Leicester for offices, venues, the universities and hospital sites, with surveys, risk notes, specifications and handover checks.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed in Leicester
Get a free quote in Leicester
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
Supplied and installed in Leicester
What we supply in Leicester
A buyer in Leicester about to order doors, glazing or barriers often faces the same bind: a shelf of product options, and too little plain advice on which rating fits which entrance. Security consultancy comes before the purchase. It starts with a walked survey, a risk note per entrance and a specification in writing, naming the standard and the rating, so the money goes to the openings that matter, and not to a rating the building will not use.
Leicester holds building types that face different risks. A hospital ward, a university laboratory, a theatre, a shopping centre and a stadium all sit in one city. A walk round the site shows the side door staff wedge open, the yard gate shared with the public, and a glazed reception that stays open and welcoming by design. A floor plan shows none of those details, and each one changes the specification.
What the buyer takes away is a working file: a risk note for every entrance, the survey record, a specification that states standard and rating, and the handover checks to run. Suppliers price from that document, one at a time or several together, and each one prices the same scope. Advice, surveys, specifications and risk notes are the service, and the service sells no doorset by the hour. For Leicester work that moves past advice, the physical security in Leicester page holds the wider city picture.
What the advice covers in Leicester
Advice starts with the operational requirement: how each entrance is used, who passes through it, and what must stay shut and what must stay open. A ward entry at Leicester Royal Infirmary, a lecture hall at the University of Leicester and a laboratory at De Montfort University each use their doors in a different way, and the requirement is written entrance by entrance. The how to specify notes set out the questions that shape that requirement.
Each entrance gets its own risk note. The note records the footfall, the hours the entrance is used and the goods or people behind it, then names the rating that fits that note. A main entrance with a glazed reception needs a different answer from a back door that guards a store. The university security door notes cover lecture halls and laboratories, the hospital security door notes cover ward entries and clinical corridors, and the retail security door notes cover shopfronts and stock room doors.
What follows is a written schedule that states standard and rating for each entrance, with leaf, frame and hardware on the same line. The ten steps notes walk through the order in which those choices are made. The specification mistakes notes show where a specification most often goes wrong.
Grades, and what they do not rate
The risk note brings LPS 1175 Issue 8.2 (September 2024) bringing the grades into the specification for each entrance, so the grade on the order matches the risk at the entrance. SR1 is the result of a one minute attack with the A1 tool set, and SR2 follows after three minutes with the B3 tool set. SR3 follows a five minute attack with the C5 tool set, and SR4 a ten minute attack with the D10 tool set.
Those grades rate forced entry only. A grade says nothing about fire, blast or a bullet, and a door that needs more than one kind of protection takes a rating for each kind. The LPS 1175 page lists each grade with its minutes and its tool set. A ballistic rating for a leaf comes from EN 1522 and EN 1523, which give FB1 to FB7 with FSG beside them, in classes that date from 1999. Glazing beside the leaf takes EN 1063, with seven BR classes, BR1 through to BR7, plus SG1 and SG2, in classes that date from 2000. The ballistic ratings page puts the FB and BR classes side by side.
SRA gets a one minute test and SRB gets a three minute test under LPS 2081 Issue 1.1 (2016), which was written for another class of opening. LPS 1270 Issue 1.1 (2014) covers another class beside it. BS EN 1627:2021 lists RC1 to RC6, a separate scale for burglar resistance in windows and doors. The LPS 2081 page names the openings that rating was written for.
Martyn’s Law and the Leicester venues
King Power Stadium holds well over 800 people on a match day, so the duties that apply to it are the heavier ones, and that band is the enhanced tier. A hall that takes between 200 and 799 people at once falls under the lighter set of duties, the standard tier. The stadium security door notes deal with crowd entries and the doors that serve them.
Curve Theatre, Leicester Cathedral and the National Space Centre each hold crowds of a different size, so the tier question is asked entrance by entrance. The theatre security door notes cover public entrances and exit routes. The SIA acts as regulator. Royal Assent arrived on 3 April 2025, and the first duties under the new law begin in spring 2027. Venues should settle which tier applies to them ahead of the first duty date. The Martyn’s Law page carries each tier, and the premises guide sets out the first steps for a venue.
A listed frontage needs consent of its own before any fixing goes into the stone, so the streets round Leicester Cathedral are checked before a doorset is ordered. Where advice touches the structure of the building, the CDM 2015 duties sit with the client, with the designer and with the contractor, and the CDM duties notes name each duty holder in turn.
Leicester entrances at a glance
Use the rows below as an opening sketch. Let the walked survey settle leaf, frame and rating for each entrance.
| Leicester entrance | Advice | Rating note |
|---|---|---|
| King Power Stadium crowd entries | Tier check first, then doorset | Enhanced tier, 800 plus |
| Infirmary ward entries | Risk note per entrance | Forced entry grade per door |
| University lecture halls | Survey each entrance | LPS grade with access control |
| Highcross shopfronts | Front door and shutter together | Rating fits the goods behind it |
| Curve Theatre public entrances | Crowd flow and exit routes | Panic hardware, access control |
Two entrances may hold the same grade yet need different leaves, closers and hours of use.
The push stays under thirty newtons through the first thirty degrees, then under twenty-two point five newtons after that, the figure BS 8300 works to. Approved Document M carries the same push limits for a building that the public uses. An exit used by more than 60 people takes a panic bar under BS EN 1125. That bar needs to span three fifths of the leaf from edge to edge. The intumescent seal in the leaf expands at around 200 to 250 degrees, so the specification names the seal beside the fire class.
From first visit to written specification
The visit begins at the entrance, where the consultant takes width and height, checks how the wall is built and how level the floor sits, and writes the risk note beside each opening. The design service in Leicester turns those measures into drawings the supplier can price from. Glazed openings at those same addresses appear on the security windows in Leicester page.
The specification is written entrance by entrance, with standard and rating named, leaf and frame beside them, and hardware on the same line. The tender evaluation notes help a buyer weigh one supplier against another on the same scope.
The Leicester survey notes and the graded specification are filed at our Leicester canvas Saffron Road, Romford, Essex RM5 3ES. Arrive immediately for a survey visit, with the specification written down.
Email [email protected] with fitting notes for each entrance and the rating each room needs. The reply lists when the visit happens and what it costs.
Name every rating the entrance needs on one line. A leaf graded for forced entry and silent on fire leaves the opening half covered.
Questions Leicester buyers ask about security consultancy
What does security consultancy cover in Leicester?
Advice before any purchase: a walked survey, a risk note per entrance and a schedule with standard and rating stated. That document goes to the supplier, and the supplier prices the scope as written.
When should a buyer ask for advice?
Before any door is ordered. Advice given early can change the rating, the leaf and the hardware.
Does an LPS 1175 grade cover fire as well?
No. The grades rate forced entry only, and a door that needs a fire time takes a separate rating under BS EN 1634-1.
Which tier does King Power Stadium fall under?
On a match day the stadium takes well over 800 people at once, which puts it in the enhanced tier. A smaller venue that takes between 200 and 799 people at once sits in the lower band.
Want advice before you order doors in Leicester?
Share the size of each entrance and the risk each room faces, and one figure covers survey, advice and specification. Get a free quote
Other areas
Security consultancy in other areas
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.