Services
Security consultancy in Manchester
Security consultancy in Manchester, from a walk of the premises to a written specification naming the standard and rating for every single door.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed in Manchester
Get a free quote in Manchester
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
Supplied and installed in Manchester
What we supply in Manchester
A Manchester building that needs new doors, glazing or barriers faces one question first, and it is not which product to order. It is which rating each entrance needs. That work is security consultancy, and it starts with the building rather than the catalogue. A consultant answers it by walking the premises, judging the risk at every entrance, and putting the rating, the standard and the hardware for each door down in writing. Suppliers then price the same job, and the buyer holds what arrives up against the written list. Without that written list, each supplier guesses the rating, and the quotes cannot be set side by side.
Manchester crowds unlike buildings into a short walk. Ward doors at Manchester Royal Infirmary carry beds and trolleys through the day, lecture halls at the University of Manchester empty hundreds of students into corridors between classes, the Arndale keeps its stock behind the shopfront, and offices in Spinningfields sit beside the river. Manchester Airport moves passengers through its terminal doors in a steady stream, Piccadilly station splits its doors between the public and staff on the concourse, and Etihad Stadium and Old Trafford fill with crowds on match days. One rating will not cover every door in that list.
What the buyer keeps from the visit is a pack they can act on: notes from the walk, a risk note tied to each entrance, a specification that states the rating and the standard for each door, and a handover checklist. One firm or several can price from that pack, and each price covers the same job. The physical security in Manchester page shows the other products that work beside consultancy across the city.
Manchester workplaces where advice pays for itself
A ward shows the point better than any other room. At Manchester Royal Infirmary a ward door has to open wide for a bed or a trolley and still shut firm on a drugs store, and the two jobs fight over the same hinges and closer. An hour spent watching the corridor shows which doors the staff wedge open and what drives them to it, so the specification can pick a closer and a hold open device to suit the ward routine. Lecture halls at the University of Manchester pose the same puzzle with more people, hundreds of students pouring out between classes. The hospital fire door guide covers the fire side of ward doors, and the airport fire door guide does the same for terminal doors.
In the Arndale, the door that most needs a second look is the stockroom door, not the shopfront. The stockroom opens onto a service corridor, out of sight, where an intruder works unseen in little time, while the shopfront has eyes on it through opening hours. Offices in Spinningfields have the same blind spot at stair doors and plant room doors, used daily by staff and never seen by visitors. Manchester Airport has it at service entrances and delivery yards, and so do the concourse at Piccadilly station and the crowd routes at Etihad Stadium and Old Trafford. The transport hub security guide covers the station and airport side, and the guide to mixing ratings in one tender shows how ratings from different schemes can share one tender.
How the advice is put together
The consultant analyses LPS 1175 Issue 8.2 (September 2024) booking the rating for each entrance against the risk found on site. SR1 goes with tool set A1 and a 1 minute attack time, SR2 goes with B3 and 3 minutes, SR3 goes with C5 and 5 minutes, and SR4 goes with D10 and 10 minutes. The rating is matched to the risk at the door, not to the size of the opening. How many people a place holds decides its Martyn’s Law tier. Enhanced tier takes a place that holds 800 or more; standard tier takes a place that holds 200 to 799. Spring 2027 is the expected start for the law. The LPS 1175 ratings page explains the ratings, and the Martyn’s Law tiers page covers the tiers and the duties that follow from them.
A risk assessment starts from how people use the building, not from a list of products. The consultant notes which doors get wedged open by staff, which routes visitors take, and where a delivery yard meets a public pavement, then fits each entrance with a rating that suits the risk at that spot. On vehicle impact, PAS 68:2013 was withdrawn on 25 Oct 2023. ISO 22343-1:2023 superseded it, and it now governs vehicle impact testing. The vehicle impact ratings page explains what changed and what to ask for now. The ten steps to specifying a door lays out the order for building a specification, the certificate checking guide shows how to test a rating claim before ordering, and the guide to issue 8 explains the current issue of the standard.
| Part of the advice | What it gives the buyer |
|---|---|
| Risk note | Risk at each entrance, noted during the walk round the premises |
| LPS 1175 rating | SR1 to SR4, each joined to its tool set and attack time |
| Martyn’s Law tier | Standard tier covers places that hold 200 to 799 people; enhanced tier starts at 800 people |
| Vehicle impact | PAS 68:2013, withdrawn on 25 Oct 2023, with ISO 22343-1:2023 in its place |
| Hardware and access | BS 8300 and Approved Document M place the limit below 30 N while the door is in its first 30 degrees. Once it has opened past that, the limit is below 22.5 N |
| Written specification | Rating, standard and hardware for each door, set down in one document |
From first visit to written specification
On the first visit, the consultant walks every entrance with the person who runs the building, and the notes from that walk turn into the risk note and the specification. The plan marks the doors in fitting order so the site team can see the sequence at a glance. Our team works from a cottage Saffron Road, Romford, Essex RM5 3ES ask during office hours. Call us to book a survey visit. Write to [email protected] for an initial conversation about the buildings you want reviewed, and attach the floor plans and the list of entrances that worry you most. The operational requirement guide explains how to put what each entrance has to do into words before suppliers are asked to price.
Advice is only useful when it names the rating for each door. A specification that leaves the rating open lets every supplier quote a different door, so the quotes cannot be compared and the delivery cannot be checked against the order. A buyer who holds the written list can check the rating on the door that arrives. The written document fixes the scope, and prices are judged against it.
Questions about security consultancy in Manchester
What does security consultancy cover?
It covers a walk round the premises, a risk note tied to each entrance, and a specification that states the hardware, the rating and the standard for every door. The buyer takes that document to one firm or to several, and every price covers the same job, so the prices can be judged side by side. The document stays with the buyer, whatever supplier is chosen.
Which rating does my entrance need?
LPS 1175 Issue 8.2 (September 2024) joins each rating to a tool set and an attack time. A1 with 1 minute gives SR1, B3 with 3 minutes gives SR2, C5 with 5 minutes gives SR3, and D10 with 10 minutes gives SR4. The consultant fits the entrance to the rating that suits what it faces.
Does Martyn’s Law apply to my building?
Capacity decides the tier. A building that holds 800 people or more goes in the enhanced tier; one that holds 200 to 799 goes in the standard tier. The law is due to come into force in spring 2027, and the consultant records the capacity of each building on the visit and notes the tier in the risk note, so the duties that apply are written into the specification.
What happens after the first visit?
The notes from the walk turn into a risk note for each entrance plus a written specification for every door. Suppliers then price from that document, each on the same job, and the fitting follows the written specification, not a spoken instruction.
Other areas
Security consultancy in other areas
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.