Services
Manufacture in Portsmouth
Made-to-measure security doors, frames and screens for Portsmouth sites, built in the workshop to a named rating and checked before fitting.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed in Portsmouth
Get a free quote in Portsmouth
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
Supplied and installed in Portsmouth
What we supply in Portsmouth
A Portsmouth order for manufacture starts in the workshop with a tape, a rating and a build sheet, not with a shelf item. The sizes of each opening fix the leaf and the frame, the rating fixes the tool set the item must hold against, and the sheet records the materials and the finish for every piece. Work begins only after those three points are agreed in writing.
Manufacture covers the whole job for a Portsmouth buyer, from the first survey sizes to the last check before the order leaves the workshop. A ward doorset at Queen Alexandra Hospital, a laboratory window at the University of Portsmouth, a desk screen at Gunwharf Quays and a yard gate near Portsmouth International Port each follows the same run of work, from survey sizes to rating, materials, finish, build and check. The build sheet stays with the order, so the paper and the item carry the same rating.
Portsmouth keeps the workshop busy across the harbour, the dockyard and the city centre. The naval base and the Historic Dockyard need doors and screens for workshops and stores, the Mary Rose Museum and HMS Victory draw visitors past frontages that need screens and doors, and Spinnaker Tower and Gunwharf Quays bring shops and restaurants that need doors and glazed panels. Queen Alexandra Hospital, the University of Portsmouth and Portsmouth Cathedral add wards, laboratories and halls, while Southsea and Fratton Park add seafront frontages and a stadium that need gates and doors made to their own sizes.
What a Portsmouth workshop order covers
Steel arrives in sheet and section and is cut to the survey sizes for each opening, with the leaf, the frame and any glazed panel cut from the same sheet where the order allows. Cutting to size first keeps the frame square and the leaf true, and each cut piece is marked with the opening it belongs to before it moves to the bench. A leaf cut a few millimetres out shows in the gap around the frame, so the tape is checked twice before the first cut.
Welding joins the leaf and the frame, and dressing takes the welds back to a flat face that takes the finish evenly. While the leaf stays on the bench, the hinges, the lock case and the closer fixings go on first, so the hardware meets the frame square before the item leaves the workshop. Each weld is looked over before dressing, and any weld that fails the look is cut out and done again.
Coating comes last, after the leaf and the frame are dressed and dry. Powder coating suits a doorset that faces daily use in a ward or a classroom, galvanising suits a gate that stands in a yard through the year, and the powder coating and galvanising guide puts the two finishes beside each other. The steel and aluminium guide covers the two materials, and the steel frames guide covers the frame that carries the leaf.
Every item is checked before it leaves the workshop: the leaf is tried in its frame, the lock and the hinges are worked through their travel, and the finish is looked over in full light. A doorset that binds in the workshop would bind on site, so the check happens on the bench, not after fitting. The security doors in Portsmouth page lists doors for Portsmouth sites, the how to specify guide covers the sizes and the class a doorset needs, and the hospital doors guide covers ward doorsets while the university doors guide covers laboratories and halls, the two busiest Portsmouth settings.
Ratings named on a Portsmouth build sheet
The grade turns on two points: the tools an attacker may use and the minutes the item must stand against them. The specification assesses LPS 1175 Issue 8.2 (September 2024) admitting each grade by the tools used against it and the minutes it must hold, with SR1 pairing class A1 tools with a 1 minute hold, SR2 pairing class B3 tools with a 3 minute hold, SR3 pairing class C5 tools with a 5 minute hold and SR4 pairing class D10 tools with a 10 minute hold. The LPS 1175 page gives the whole class list, and the SR2, SR3 and SR4 guide runs through the three higher grades side by side.
Two further standards cover other items on the sheet. LPS 2081, Issue 1.1 (2016), gives SRA a 1 minute hold and SRB a 3 minute hold, while LPS 1270, Issue 1.1 (2014), gives its own classes for glazing. The LPS 2081 page carries its class list, and the LPS 1270 page carries the glazing classes.
Access runs beside the rating on every doorset that the public uses. Through the first 30 degrees the force stays below 30 N, and after that it stays below 22.5 N, under Approved Document M, so a leaf that holds its grade must still open with a light push. The access and Approved Document M guide runs through the opening force and the clear width, and the transport hub guide covers doors and gates where passengers and vehicles meet, which suits the port and the ferry routes.
Ordering made-to-measure items for Portsmouth
Each opening is surveyed before anything is made. The survey starts with the opening itself: its width, its height and the wall around it, then the room behind it, the services beside it and the routes people take through it. Each opening is photographed and sketched, and both go into the build file, so the workshop works from the opening as found, not from a plan alone. The ten steps guide runs through the sizes and the class in order.
The sheet then lists what each opening needs: its class, its sizes, its materials, its hardware and its finish. The written specification goes out from the Romford facility: Saffron Road, Romford, Essex RM5 3ES.
Fitting is planned around the hours each site keeps, hospital rounds, lecture times and shop hours, where the programme allows. Email each opening size, with the rating it needs, to [email protected] for quotes on the Portsmouth order, and the workshop answers inside one working day, naming the grade it priced against and the range the order falls in.
| Portsmouth site | Product | Rating to ask for | Finish |
|---|---|---|---|
| Queen Alexandra Hospital ward | Doorset with vision panel | SR2 | Powder coated |
| University of Portsmouth laboratory | Doorset, double leaf | SR2 | Powder coated |
| Portsmouth International Port yard | Gate, sliding | ISO 22343-1:2023 | Galvanised |
| Gunwharf Quays restaurant | Doorset with glazed panel | SR1 | Powder coated |
| Southsea seafront frontage | Doorset, single leaf | SR3 | Powder coated |
Settle the class, the sizes and the finish in writing first. Once the frame is welded, a leaf made to the wrong grade takes far more work to correct, so the paper is agreed before the cutting starts.
Questions about manufacture in Portsmouth
How long does a Portsmouth doorset take from survey to fitting?
No single figure covers every doorset, since the programme turns on the sizes, the grade and the finish on the order. Once the survey sizes and the class are agreed, the build sheet carries the programme in writing, and the lead times guide runs through the points that stretch it or shorten it.
Can one Portsmouth order cover doors, windows and screens together?
Yes, where each item carries its own sizes and its own rating. A doorset, a window and a screen pass through the same order of work, and the sheet records the class, the materials and the finish of each piece.
What finish suits a Portsmouth site near the sea?
The setting fixes the finish as much as the look does. A Southsea frontage meets damp, salty air all year, so the coating is picked for the coast as well as the colour, and the powder coating and galvanising guide runs through the two finishes.
Who carries out the fitting once the workshop work is done?
Fitting happens on site after the build and the checks are finished, and it is planned around the hours the building keeps. The installation service page covers the fitting itself, and the warranty and defects guide covers what happens after handover.
Ordering doors, frames or screens for a Portsmouth building? Share the opening sizes and the grade each one needs and the workshop will price the order.
Other areas
Manufacture in other areas
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.