Certified physical security

ArxBridge
Dockside brick and glass offices with steel doors in Liverpool

Services

Manufacture in Liverpool

Doors, frames, screens and shutters made to order for Liverpool docks, shops and hospital wards, from survey and drawings to build, finish and fitting.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Liverpool
Prefer to talk?+44 7352 267239

Get a free quote in Liverpool

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Liverpool

What we supply in Liverpool

More on this

Manufacture in Liverpool builds each door, frame, screen and shutter for the opening it must fill. A warehouse door on the Mersey waterfront, a shopfront in Liverpool ONE, a ward door at the Royal Liverpool Hospital and a lecture hall door at the University of Liverpool each carry a different daily load, so leaf, frame, lock and finish are picked opening by opening, once the opening has been taped on site.

The city packs old dock buildings, new retail and big public buildings into a small centre, and that mix sets the build. Brickwork at the Albert Dock needs a different frame fixing from a steel framed shop unit, a hospital corridor needs broad leaves and soft closers, and a university plant room needs a lock that answers to named staff alone. A single order can span three or four building types, so the survey notes handle each opening as a job on its own.

Docks and waterfrontAlbert Dock, the Mersey waterfront and dockside warehouses
Retail and leisureLiverpool ONE, Albert Dock venues and city centre shops
Hospitals and campusesRoyal Liverpool Hospital and the two city universities
Offices and civicLime Street station quarter, offices and public buildings

Liverpool doors for docks, shops and wards

Waterfront doors earn their keep. A dockside warehouse door faces forklifts, salt air and long shifts, so the leaf is plate steel, the hinges are sized for constant use and the threshold is laid to let trolley wheels pass without catching. The sector page for warehouses and logistics maps bay, yard and stores room zoning for a working site.

Shopfronts in Liverpool ONE and at the Albert Dock greet the public by day and lock down at night. The street door should swing easily for visitors, the rear door should answer to named staff alone, and the stockroom door should hold goods behind a lock the shop team alone can open. A shop trading late needs closers and locks that hold their setting through the whole day.

Ward and teaching doors move quietly among people. At the Royal Liverpool Hospital, broad leaves let beds and trolleys pass with room to spare, while pharmacy, records and plant rooms stay locked to named staff. Lecture halls at the University of Liverpool and at Liverpool John Moores University fill and empty between classes, while laboratories, server rooms and stores stay shut. Teaching blocks use the pattern on the education sector page, ward doors and treatment rooms use the healthcare sector page, and the physical security in Liverpool page lists the other rated protection for the city.

How a Liverpool order moves from survey to bench

Every job starts on site, not in the workshop. Every opening is taped where it stands, the wall build and floor level are written down, and any pipe or cable crossing the opening is marked, while the surveyor watches staff and visitors use the doorway through a normal hour. Those figures set leaf, frame and threshold, so the workshop builds to measured sizes, not to guesses. The design service takes those notes and draws the unit with its fixings, so the bench works from a drawing, not from memory.

On the bench, the drawing runs the job. Plate steel is cut and welded from the drawing, then the frame is squared to the taped opening before ironmongery is fitted, and each finished unit is checked over before it leaves the workshop. A note regarding LPS 1175 Issue 8.2 (September 2024) describes how the four grades run from SR1 to SR4, so bench, fitter and buyer share one grade line for the opening. Grades SR1 to SR4 are shown on the LPS 1175 standard page, from SR1 at the bottom to SR4 at the top. Before coating, shot blasting strips scale and rust from the steel, and powder coating then puts a hard coat on the steel that stands up to rain, washing and daily knocks.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Usual builds for Liverpool sites

Use the table as a first guide to the build each Liverpool site usually takes. The survey and the risk check for that site fix the final build, and steel is cut only after the buyer signs the sheet.

Liverpool site Doors and screens Grade to allow Coat
Dockside warehouses and yards Gatehouse door, stores door and dock shutter SR2, rising to SR3 for high value stock Galvanised finish, hinges built for constant use
Liverpool ONE shopfronts Public door, rear door and stockroom door SR2, fixed by the shop plan Frontage colour, panic bars at the exits
Hospital wards and pharmacy Wide ward leaves, pharmacy door and records door SR2, set by the ward plan Wipe clean finish, lever handles on every door
University halls and laboratories Corridor door, laboratory door and plant room door SR2, where the campus plan calls for it Hard wearing finish, cable routes kept ready
Lime Street quarter offices Entrance door, service door and plant room door SR2, set by the office plan Hard coat, closers sized for daily traffic

Setting out a Liverpool specification

Start from the taped opening, not from a catalogue size. Note the taped size, the wall build, the rating and the ironmongery for each door, with the test papers for the quoted rating filed on the build sheet beside them. The questions to settle before a price is asked for are named in the specification guide, while the lead times guide runs through the time a rated unit takes to reach site.

Cost the whole doorset as one figure: leaf, frame, threshold, lock, hinges, closer and finish together, so a single price covers the unit. A fire rating, where one is needed, sits on that same line too. E, EW and EI and the times they run to are explained on the fire ratings page, from 30 minutes to 120 minutes. Any fire claim concerning BS EN 1634-1:2014+A1:2018 ranks on the test record for the exact unit, not on a brochure line. Where access control is wanted, name the reader spot, the cable run and the power point close by.

From order to fitting in Liverpool

Once the buyer signs the build sheet, the workshop makes each unit from the drawings and checks coat and ironmongery before dispatch. Taped figures stay with the job through cutting and fitting, so the ward door for the Royal Liverpool Hospital matches the size taken on site, not a figure read off a plan.

Work stays on the programme agreed at the start, the installation service fits each unit on the job card dates, and the sign-off checks are covered in the commissioning and handover guide, with test papers and care notes handed over together at the end.

Put the drawings on the quote form and write the rating beside each opening. Drawings are sent to [email protected] and a first figure with the next step follows inside one working day. The workshop starts only when the openings are agreed and the ratings are set.

Manufacture notes for Liverpool buyers

Ask for the test papers with the quote, not after it. A rating on a sales sheet means little on its own, so check that the papers name the same leaf, frame and hardware you are buying.

Questions about manufacture in Liverpool

Do you make doors for openings that fit no catalogue size?

Yes. Every door is cut to the taped size taken on the visit, so a dockside warehouse opening or a tight Liverpool ONE shopfront gets a door shaped to its own wall.

Which rating suits a dockside stores door in Liverpool?

The risk assessment for the site decides. A stores door often sits at SR2 and moves to SR3 where the stock inside is costly or the yard is left empty overnight.

Can a university door be prepared for a card reader in the workshop?

Yes, if the reader position and the cable route are set before the build starts. The workshop prepares the leaf and the frame, so the finished unit needs no cutting on site.

What is the usual run from survey to fitting in Liverpool?

Survey and drawings come first, then the build in the workshop, then fitting on the agreed dates. The test papers for the quoted rating travel with the care notes in the handover pack.

Need a door made for a Liverpool opening? Put the rating for each opening and the drawings on the quote form, and the workshop will make each unit to the taped size for that opening.

Get a free quote

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.