Certified physical security

ArxBridge
Harbourside converted buildings with steel entrance doors in Bristol

Services

Manufacture in Bristol

Manufacture in Bristol for made-to-measure doors, windows, screens and gates, with named ratings, finishes and a written build sheet for every order.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Bristol
Prefer to talk?+44 7352 267239

Get a free quote in Bristol

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Bristol

What we supply in Bristol

More on this

Manufacture in Bristol means doors, windows, screens and gates built to measure in a workshop, to a rating named in writing before the steel is cut. Each order starts from the sizes of its openings and the class each one must hold, and the build sheet names the product, the rating, the materials and the finish for every item. Nothing is ordered from a shelf, and nothing is built to a class that stays unnamed.

Manufacture covers the full order, from the first sizes to the finished item. A doorset for a hospital ward, a window for a university laboratory, a screen for a reception desk and a gate for a warehouse yard are each built to the same pattern: sizes taken, rating named, materials chosen, finish settled, then the item built and checked. The build sheet travels with the order, so the rating on the paper matches the rating on the item.

Bristol gives the workshop plenty of orders. Bristol Royal Infirmary and Southmead Hospital need doorsets for wards and departments, the University of Bristol and UWE need doors and windows for laboratories and libraries, and Avonmouth and Filton need gates and doors for yards and workshops. Bristol Airport and the shops of Cabot Circus add screens and doors for desks and frontages, and each order is built to its own sizes.

Made to measureDoors, windows, screens and gates
Hospitals and campusesBristol Royal Infirmary, Southmead Hospital and UWE
Industry and travelAvonmouth, Filton and Bristol Airport
Named ratingsEvery order names its class in writing

What the workshop builds for Bristol sites

The workshop builds doorsets first, since most Bristol orders start with a door. A ward doorset needs leaves, a frame, hinges and a lock that suit daily use, a laboratory doorset needs a frame that holds its rating beside services and pipework, and a shop doorset needs a finish that suits the frontage around it. The physical security in Bristol page shows how those doors sit beside offices, hospitals and shops across the city, and the security doors in Bristol page covers doors for Bristol sites in the same way.

Windows, screens and gates follow the same pattern. A university window needs a frame and glazing that suit the room behind it, a reception screen needs a pane and a frame that suit the desk, and a warehouse gate needs a frame and fixings that suit the yard. The healthcare sector page covers hospital doors and windows around wards, the education sector page covers universities. For yards and depots, the warehouses and logistics sector page has the doors and gates those sites use.

Ratings a Bristol order must name

The tool set used against the item and the time it must hold set the forced entry grade. The build sheet presents LPS 1175 Issue 8.2 (September 2024) meanwhile the workshop checks the tool list for the grade, with SR1 as class A1 holding for 1 minute, SR2 as class B3 holding for 3 minutes, SR3 as class C5 holding for 5 minutes and SR4 as class D10 holding for 10 minutes. All the classes in the range sit on the LPS 1175 page, and the SR2, SR3 and SR4 guide puts the three grades beside each other.

Other ratings are named beside it where the order needs them. LPS 2081 sets SRA at 1 minute and SRB at 3 minutes, Issue 1.1 (2016), and LPS 1270 sets its own classes, Issue 1.1 (2014). The LPS 2081 page lists its classes, and the LPS 1270 page lists its own in full.

Vehicle and glass ratings are named in the same way. EN 1627 sets RC1 to RC6 classes, BS EN 1627:2021, and EN 356 sets P1A to P8B classes for glass. The 2013 PAS 68 document came off the list on 25 October 2023. Its tests moved to ISO 22343-1:2023, while IWA 14-1:2013 went the same way. The vehicle impact ratings page sets out each vehicle class, while the HVM standards guide explains how the three vehicle standards read together.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Specifying a made-to-measure order for Bristol

The work starts with the sizes and the rating for each opening. Measure the width and height of every opening, the wall build around it and the routes through it, then settle the class each item must hold. A ward doorset needs a different grade from a warehouse gate, and the ten steps guide shows how the sizes and the class are settled in order. The how to specify guide covers the same ground for a doorset.

Then settle the materials and the finish. Steel suits a doorset that takes hard daily use, aluminium suits a frame where weight matters, and the finish must suit the site around it, from a hospital corridor to a yard at Avonmouth. The steel and aluminium guide puts the two materials beside each other, the steel frames page covers frames, and the powder coating and galvanising guide explains the two finishes.

Then settle the hardware, the programme and the handover. Hinges, locks and closers must suit the leaf weight and the daily use, and the programme must allow time for the build, the checks and the fitting. The lead times guide explains what sets the programme, and the handover records guide shows what papers travel with the order.

Bristol site Product Rating to ask for Finish
Southmead Hospital ward Doorset, single leaf SR2 Powder coated
University of Bristol laboratory Doorset, double leaf SR2 Powder coated
Avonmouth warehouse yard Gate, vehicle ISO 22343-1:2023 Galvanised
Filton workshop Doorset, single leaf SR3 Powder coated
Cabot Circus shop Doorset with glazed panel SR2 Powder coated

Project steps for manufacture in Bristol

Each opening is surveyed before anything is built. Width, height and wall build go into the survey notes first, followed by the rooms behind each opening, the services beside it and the paths staff and visitors use. Every opening gets a photo and a sketch filed in the build file.

Next the build sheet sets out the rating and the item for every opening: class, sizes, materials, hardware and finish. The evidence file goes out with the finished item. The written specification goes out from Saffron Road, Romford, Essex RM5 3ES.

Fitting follows the hours of each site, ward hours, teaching times and trading hours, where the programme allows. Put the sizes and the rating for each opening in a message to [email protected]. The workshop sends back its reply inside one working day. That reply names the rating the team checked and the budget range for the order.

Name the rating before the steel is cut. A doorset built to the wrong grade is hard to put right after the frame is welded, so the class, the sizes and the finish are settled in writing first.

Questions about manufacture in Bristol

How long does a made-to-measure doorset take?

The programme follows the sizes, the rating and the finish on the order, so no single figure covers every doorset. The build sheet names the programme in writing once the sizes and the class are settled, and the lead times guide explains what sets it.

Can one order mix doors, windows and screens?

Yes, where the sizes and the ratings are named for each item. A doorset, a window and a screen are built to the same pattern, and the build sheet names the class, the materials and the finish for every item in the order.

What finish suits a Bristol site near the water?

The finish follows the site and the use of the item. A Harbourside frontage faces damp air through the year, so the finish is chosen for the setting as well as the look, and the powder coating and galvanising guide explains the two finishes.

Who fits the order after the workshop?

The order is fitted on site once the build and the checks are done, and the fitting is planned around the hours of the site. The installation service page shows how the items are fitted, and the warranty and defects guide explains what follows handover.

Planning made-to-measure security products for a Bristol site? Share the sizes and the rating each opening needs.

Get a free quote

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.