Certified physical security

ArxBridge
Granite office building with a heavy navy security door in Aberdeen

Services

Manufacture in Aberdeen

Manufacture in Aberdeen for granite frontages, the hospital, universities, the harbour and the airport, built to surveyed sizes and a written specification.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Aberdeen
Prefer to talk?+44 7352 267239

Get a free quote in Aberdeen

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Aberdeen

What we supply in Aberdeen

More on this

ServiceBespoke steel doorsets, screens and barriers
First stepSite survey in Aberdeen
PapersDrawings and specification for sign-off
ReplyAnswer in one working day

An opening that is not square, not standard and not in a new wall needs a doorset built for it alone. Our manufacture service for Aberdeen takes the surveyor’s measurements and turns them into a steel doorset, a glazed screen or a barrier for one opening, with rating, finish and fixings settled before any metal is cut. The buyer signs the specification, the workshop builds to it, and the finished product is measured against the same papers at handover.

Aberdeen gives the work a clear shape. Granite frontages run along Union Street, Marischal College stands in the city centre, Aberdeen Royal Infirmary holds wards and corridors in use through the day, and the two universities hold teaching blocks, libraries and student halls. Aberdeen harbour and Aberdeen Airport sit at the edges of the city, and Beach Boulevard holds leisure buildings facing the sea. The area page for physical security in Aberdeen gives the wider picture of rated protection across the city, and manufacture follows the opening in front of it, not a standard size from a catalogue.

The workshop makes steel doorsets, glazed screens, frames and leaves, cutting hardware positions and fitting seals before the product leaves for site. Coatings go on after the metalwork is checked, with shot blasting and powder coating giving the surface the protection Aberdeen weather demands. Every doorset travels with its papers, so the fitter on site works from the same specification the buyer signed.

Granite, hospital wards and harbour wind: what Aberdeen asks of a doorset

Stone dictates the fixing on Union Street and around the granite centre. A frame in granite needs a fixing that bites into sound material, so the surveyor looks at the stone, the reveal depth and the mortar before anything is cut. Marischal College and the older civic buildings show the same shape, tall openings in thick walls where a stock frame would sit wrong, and the finish is picked to sit beside granite rather than fight it.

Beds, trolleys and wheelchairs pass through Infirmary doors from morning to night, and a door taken out of use blocks a corridor the ward relies on. Doorsets there need room for a bed to pass, a threshold that lets a wheel cross without a jolt, and handles that work for a person with both hands full. Teaching blocks and student halls at Robert Gordon University add doors opened by groups between classes, and the University of Aberdeen adds the same pattern across its campus, so hinges, closers and locks are picked for repeated use.

The harbour and the airport put wind and weather straight against their doors, and Beach Boulevard adds leisure buildings busy with visitors in all weather. Doorsets on those frontages need seals and a threshold that shut the weather out while the rating holds, and a coating that stands up to salt air and rain. The surveyor notes how much weather each opening takes, and the specification picks the coating for the conditions the doorset will face.

Four decisions the specification settles before cutting starts

Size comes first, the opening as the surveyor found it. Threat comes second, the rating the product must hold. Material comes third, frame, leaf, glass and coating. Fixing comes fourth, how the frame is held in the wall. Leave one out and the fitter decides it on site, and a decision taken on site is the one that puts the rating at risk.

The SR class goes on the drawing in full, given LPS 1175 Issue 8.2 (September 2024) also fixes the tool set and the attack time for that class, so the buyer can match the test record to the drawing. Questions about BS EN 1634-1:2014+A1:2018 also come up at handover, and the answer is the test record for the doorset exactly as built, leaf, seals and hardware together. The SR classes live on our LPS 1175 standard page, the fire classes on the fire ratings page, and our how to specify security doors page walks a buyer through the choices before the workshop starts.

The table below names the workshop stages and the proof the buyer holds at each one.

Workshop stage Settled at this stage Buyer proof
Survey Opening size, wall type, reveal depth Measurements against the site
Specification Rating, materials, coating, fixings All four decisions in writing
Cutting Frame, leaf, hardware cut-outs Sizes against the drawing
Coating Preparation and powder coat Coating suits the exposure
Checking Test record against specification Papers match the product

From first message to fitted doorset in Aberdeen

The job opens with a message that names the building, the openings and the risk behind them, and the reply lands inside a working day with a survey date in it. At the site the surveyor measures every opening, looks at the wall behind each frame and photographs the reveal, so the workshop builds from the wall as it stands and not from a plan drawn years ago. The drawings return to the buyer for sign-off, and only a signed drawing releases the metalwork, because a revision on paper costs nothing and a revision after cutting costs time.

Fitting is handled by the installation service, drawings by the design service if the buyer asks for them, and the programme is planned with the lead times and programme risks guide. Handover notes record the checks run against the drawings, as the commissioning and handover guide explains.

Before the doorset is unwrapped, match the test record number on the delivery note to the specification. Once a doorset is fitted, sending it back is slow and costly, and the number on the note proves the product on the pallet is the product on the paper.

Questions Aberdeen buyers ask about manufacture

What if a granite opening is out of square?

The opening is taken at several points by the surveyor, and the frame is built to the worst of them, with fixings named for granite and packers shown on the drawing. A frame built to an average would bind at the tight point, so the workshop builds to the point that pinches.

Is the frame, leaf and hardware one product or three?

One. Frame, leaf, seals and hardware positions are built and checked as a single doorset, and the test record covers that single product. Buying a leaf apart from its frame would leave the buyer with two records and no proof the two belong together.

When is the delivery date fixed?

After the survey, once size, rating and finish are known, because all three change the workshop time. The lead times guide linked above runs through the stages and the things that stretch a programme, and the survey date is set in the first reply.

Which papers travel with the doorset?

The signed specification, the drawings for the openings and the test record for the rating named on the specification. The delivery note carries the test record number, and the handover notes record the checks run on the fitted doorset against those papers.

Ask for a quote for manufacture in Aberdeen. Send the building, the openings and the risk to contact ArxBridge, or write to [email protected]. ArxBridge works from Saffron Road, Romford, Essex RM5 3ES, and a reply comes back inside one working day.

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.