Certified physical security

ArxBridge
Quayside offices and navy steel entrance door beside the Tyne in Newcastle upon Tyne

Services

Design in Newcastle upon Tyne

Design in Newcastle upon Tyne for secure entrances in universities, hospitals, venues and offices, from brief and survey to drawings and specification.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Newcastle upon Tyne
Prefer to talk?+44 7352 267239

Get a free quote in Newcastle upon Tyne

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Newcastle upon Tyne

What we supply in Newcastle upon Tyne

More on this

Design in Newcastle upon Tyne turns a brief for a secure entrance into drawings, a specification and a schedule that a manufacturer can build from. The work starts with the building itself and the people who pass through it each day, not with a catalogue leaf, so the door, the frame, the hardware and the finish all answer the same brief.

Newcastle asks for that kind of design across campuses, hospitals, venues and the city centre. Newcastle University and Northumbria University hold laboratories, libraries and student buildings where entrances take heavy daily use, while the Royal Victoria Infirmary and Freeman Hospital run wards, corridors and service routes where a door must open with ease and close cleanly. Eldon Square and Northumberland Street hold shops with stock rooms behind a public frontage, Grainger Town holds offices and converted buildings with old openings, and the Quayside holds bars, restaurants and offices beside the river. Physical security in Newcastle upon Tyne gives the wider city picture, and the design follows the building it serves.

A design brief should name the rating the opening needs, the people who pass through it and the way the door is used each day. The operational requirement guide covers the brief itself, and the specification guide covers the detail the drawings must carry. The LPS 1175 page lists the four ratings with the tool set for each, from SR1 at one minute to SR4 at ten minutes.

BriefWritten brief, survey notes and drawings for every opening on the job
RatingSR1 to SR4, with glazing and hardware named in the same set
AccessOpening force, clear width and hardware placed for every user
FinishPowder coating, metal trim and glazing agreed before manufacture

Choosing the rating and the leaf

The design matches LPS 1175 Issue 8.2 (September 2024) between the rating and the hardware choice. The scale starts at SR1, one minute against the A1 set, and steps through SR2 at three minutes against the B3 set, SR3 at five against the C5 set and SR4 at ten against the D10 set, so the brief names the class each opening needs, with the test behind it.

Some openings need more than a forced entry class. Glazing in a leaf or a side screen falls under LPS 1270, Issue 1.1 from 2014, and a door that must also stop a vehicle at the entrance falls under LPS 2081, with SRA rated at one minute and SRB rated at three minutes, Issue 1.1 from 2016. The LPS 1270 page names the glazing classes, and the LPS 2081 page names the two vehicle ratings. Where the brief asks for a European class instead, EN 1627 runs from RC1 to RC6, and ballistic glazing runs from FB1 to FB7 with FSG under EN 1522 and EN 1523, while glass to EN 1063 runs from BR1 up to BR7, with SG1 and SG2 for the splinter classes.

The leaf material follows the rating and the setting. The steel or aluminium guide covers the choice between the two metals, and the rating validity guide covers the detail that keeps a rating in force once the door is fitted.

Designing for Newcastle buildings

St James’ Park and Utilita Arena Newcastle draw crowds through concourses, hospitality rooms and service routes on an event day, and the design of each entrance must handle that flow while keeping service rooms closed to the public. Under Martyn’s Law, a venue holding 800 people or more falls in the enhanced tier, while a venue from 200 to 799 falls in the standard tier. Royal Assent was given on 3 April 2025, with the go live date expected in spring 2027, so the tier goes into the brief before the drawings start. The Martyn’s Law page gives both tiers with the dates behind them.

Newcastle International Airport holds service doors and staff routes that cycle through the day, and the airport doors guide covers the doors on that kind of site. Newcastle Central Station holds retail units and service rooms beside the platforms, Newcastle Civic Centre holds offices and public counters, Newcastle Helix holds laboratories and offices on a campus, and Cobalt Business Park holds offices where a reception and a service entrance need different doors. The powder coating or galvanising guide covers the finish choice for leaves that face weather and daily wear.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Drawings, hardware and access

The finish is agreed on the drawing, not left to the workshop floor, so the trim, the coating and the glazing all match the brief.

Access is drawn into the design from the start. Approved Document M and BS 8300 set the effort to open a door: 30 N at most across the opening arc to 30 degrees, then 22.5 N at most for the rest of the swing, so the closer size and the leaf weight are set together at design stage. For hinges, BS EN 1935 grade 13 is rated for a 120 kg leaf across 200,000 cycles, and grade 14 for a 160 kg leaf across the same count, and the lock, the closer and the access control are all named on the same drawing as the leaf.

Building Leaf Hardware Finish
University laboratory Steel, SR2 Lever handle, closer Powder coating
Hospital corridor Steel, SR2 Lever handle, access control Powder coating
Arena entrance Steel, SR3 Panic hardware, closer Powder coating
Quayside restaurant Steel, SR1 Lock, closer Metal trim, glazing

From brief to manufacture

Work starts with the brief and a visit to each opening. The survey measures each opening for width, height and depth, notes the floor finish and the space above the door, and photographs the frame and the wall beside it, so the drawings name the leaf size, the rating and the hardware on every door. The ten steps guide covers the order of the work, and the lead times guide covers the programme risks to allow for.

Drawings are posted to the design office in Saffron Road, Romford, Essex RM5 3ES once the survey notes are signed. The drawings go to the client for sign off before manufacture, and the handover covers the lock, the closer and the access control, so the site team knows how each door opens and locks. Installation in Newcastle upon Tyne covers the fitting stage, and the Newcastle security doors page covers the doors themselves.

A drawing that leaves the hardware undecided is not finished. The lock, the closer, the hinges and the access control should all be named on the same drawing as the leaf, because a late hardware change can move the rating, the weight and the opening force together.

Questions about design in Newcastle upon Tyne

What should a design brief include?

The brief should name the building type, each opening, the rating the opening needs, the people who pass through it and the finish. A photograph of each opening and a note of any old frame or uneven wall helps the survey, and the operational requirement guide covers the brief in more depth.

How does design handle an old opening in Grainger Town?

The survey measures the old opening before any drawing is made, so the leaf, the frame and the fixings are drawn to the opening as it stands. Where the opening is out of square, the drawing names the packing and the trim that bring the frame true.

Does design cover access control and hardware?

Yes. The lock, the closer, the hinges and the access control are named on the same drawing as the leaf, with the opening force and the clear width checked at design stage, so no hardware choice is left to the day of fitting.

What happens after the drawings are signed off?

After sign off, the drawings go to manufacture, and the programme allows time for the leaf, the frame and the hardware to be made as one set. At handover, each door is checked against its drawing, and the site team is shown the lock, the closer and the access control.

Send the design brief with the measured openings to [email protected] and the team answers in writing within one working day, setting out the survey date and the fee.

Get a free quote

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.