Services
Design in Coventry
Design in Coventry for security doors, frames and screens, from survey and drawings to ratings, access and finish, set out in one written specification.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed in Coventry
Get a free quote in Coventry
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
Supplied and installed in Coventry
What we supply in Coventry
Design in Coventry turns a written brief into drawings, sizes and a named rating for each opening, so the doors, frames and screens for a building are made to fit the rooms they serve rather than bought off the shelf. A university teaching block, a hospital ward and a civic office each ask for a different mix of leaf, frame, glazing and hardware, and the design work names each of those parts before any steel is cut or any finish is chosen.
Coventry gives that work plenty of variety. Coventry Cathedral and the Herbert Art Gallery and Museum sit close to the city centre, Coventry University and the University of Warwick keep teaching rooms, laboratories and halls across the city, and Coventry Building Society Arena, Coventry Transport Museum and the Belgrade Theatre each hold crowds passing through doors that open and shut all day. University Hospital Coventry, Jaguar Land Rover sites and Coventry City Council offices add wards, workshops and civic rooms to the same list, while Coventry railway station holds doors and screens where people pass through in large numbers at peak times.
What design covers for a Coventry building
Design starts with a survey of each opening rather than with a catalogue size. A visit to each opening comes first: the person who surveys it takes the width and height readings in three spots, looks at how the wall is layered, checks the floor height and any pipes or cables that pass through the opening, and writes down what the door does during a working day. A leaf on a busy entrance calls for fittings unlike those on a leaf guarding a store room, and a screen facing a public concourse calls for glazing unlike that on a screen facing a back corridor, so the survey notes the use of each room before any drawing is made.
The drawing that follows names, opening by opening, the leaf, frame, glazing, hardware spots and finish. Security doors shows what leaves and frames are on offer, and the powder coating page explains the coating that shields the steel after the welds are dressed. Where a building stands among older streets near the centre, the listed building fire doors guide describes the extra care the design needs, and Coventry fire rated steel doors looks at the steel leaf case for that same city.
How a Coventry design is put together
The work runs in a set order: brief, survey, drawing, check and revision. The brief names the rooms and the risk for each one, the survey gives the true sizes, the drawing turns those sizes into a leaf and a frame, and the check reads the drawing back against the brief before it goes to manufacture. The specifying security doors page runs through the checks a drawing has to pass, the LPS 1175 door guide, laid out in ten steps, walks through how the rating is picked, and the specification mistakes guide shows where drawings most often go wrong.
The Romford building: Saffron Road, Romford, Essex RM5 3ES. The operational requirement guide helps a Coventry client write the brief that the drawing answers, so the design, the rating and the hardware all trace back to one written ask.
Ratings and access figures the design names
The specification recognises LPS 1175 Issue 8.2 (September 2024) pairing each rating with a named tool set and a named attack time for the doors on the schedule. That scale starts at the top with SR4, 10 minutes against tool set D10, then steps down through SR3 at 5 minutes with C5 and SR2 at 3 minutes with B3, ending at SR1, 1 minute with A1, and every part, leaf, frame and lock alike, is tested against the rating the order names. The LPS 1175 page carries the full scale, the LPS 2081 page gives the enclosure ratings under Issue 1.1 (2016), and the LPS 1270 page gives the glazing ratings under Issue 1.1 (2014).
Access figures sit beside the rating on the same drawing. BS 8300 and Approved Document M put the opening force at no more than 30 newtons across the first 30 degrees of swing, then no more than 22.5 newtons for the rest of the swing, and the clear width should suit the people who use the route every day. The guide on access and Approved Document M goes into those figures in more depth, and the LPS 1270 page is the place to check the glazing class where a vision panel sits in the leaf.
| Opening | Design check | Rating or figure |
|---|---|---|
| Entrance doorset | Leaf, frame and lock judged together | LPS 1175 SR1 to SR4 |
| Vision panel | Glazing class matched to the leaf | LPS 1270 Issue 1.1 |
| Enclosure or hatch | Resistance of the full assembly | LPS 2081 Issue 1.1 |
| Accessible route | Opening force through the swing | Below 30 N, then below 22.5 N |
A design is only as true as its survey. When sizes are taken at one point only, the leaf can arrive out of square with the opening, so the smallest reading governs the drawing, and the clearances are checked once more after the finish goes on.
Where Coventry buildings ask for design first
Coventry asks for design across a wide mix of buildings. University teaching blocks and student housing need doors that stand up to heavy daily use and keep their rating after constant opening and closing. Hospital corridors need leaves that clear trolleys and beds while the fire rating holds, and the design must name the clear width for each opening. Manufacturing sites on the edge of the city need roller shutters and gates that take vehicle traffic and keep the boundary shut outside working hours.
Retail in the city centre needs shutters that close the frontage at night and open cleanly each morning, with the design naming the locking and the finish. The railway station and the arena need gates and doors that move crowds without blocking the way out, and the design must name the escape widths alongside the security rating. Each building type sets its own priorities, and the drawing answers them opening by opening, so the rating, the hardware and the finish match the use of the room behind the door.
Questions about design in Coventry
Can design cover a single door in Coventry?
Yes, a single opening can be surveyed, drawn and rated on its own, with leaf, frame, hardware and finish all named in one short specification. The same checks apply as for a full floor: the sizes are taken at three points, the rating is named from the risk, and the drawing is checked against the brief before the order goes to build.
What survey information does design need?
Before the drawing is made, the team needs the opening width and height taken in three spots, the layers of the wall, the floor height, the hardware spots and any pipes or cables that cut across the opening. Notes on what the room does during a working day matter too, since a door that serves a crowd calls for fittings unlike those on a door that serves a store room.
How does design handle access for all users?
The drawing names the clear width and the opening force for each door on an accessible route, keeping the force below 30 newtons through the first 30 degrees, then below 22.5 newtons for the rest of the swing, as BS 8300 and Approved Document M set out. Hardware is placed where it can be reached and used without a tight grip, and the closer is chosen so the leaf shuts without a heavy push.
Does the design name the finish as well as the rating?
Yes, the colour and the coating are agreed at the drawing stage and written into the same specification as the rating and the hardware. A colour sample can be settled before the full order is placed, so the leaf and the frame come back from finish as a matched pair and the site work is kept to hanging, testing and touch-up.
Send the opening sizes and a short note on how each room is used to [email protected] from your work email, and a written answer arrives inside one working day, giving the specification, the price and the next step for a survey in Coventry.
Other areas
Design in other areas
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.