Certified physical security

ArxBridge
Granite office building with a heavy navy security door in Aberdeen

Perimeter and HVM · PAS 68 and IWA 14-1

Hostile vehicle mitigation in Aberdeen

Hostile vehicle mitigation in Aberdeen for hospitals, universities, the harbour and P&J Live, with bollards and barriers rated to the vehicle threat.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Aberdeen
Prefer to talk?+44 7352 267239

Get a free quote in Aberdeen

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Aberdeen

What we supply in Aberdeen

More on this

Aberdeen puts vehicles and people close together on the same streets, and hostile vehicle mitigation starts from that closeness. Union Street carries buses, taxis and delivery vans past shop fronts and pavements, the harbour moves freight and ferry traffic beside public walkways, and Aberdeen Airport sends cars and coaches to a forecourt where travellers queue. Hostile vehicle mitigation in Aberdeen sets bollards, barriers and street furniture on those routes so a vehicle off the road meets a rated line before it reaches people.

Aberdeen hands the survey a mix of campuses, a hospital, an arena and a busy centre. The University of Aberdeen runs a campus where students cross roads between lecture halls and halls of residence, Robert Gordon University runs lecture halls and student rooms across its own campus, Aberdeen Royal Infirmary runs a hospital where ambulances, visitors and staff share the same entrances, P&J Live draws large crowds to events, and Union Square and Marischal College bring shoppers, office workers and visitors to the city centre.

An Aberdeen buyer takes the survey, the vehicle rating and the written specification as one brief, shaped to the site rather than to a catalogue. The physical security in Aberdeen page looks at the same buildings across doors, shutters, gates and barriers.

Vehicle ratingBollards and barriers graded to the vehicle threat
Gap and heightClear gaps and heights set to ProtectUK guidance
Survey firstWalked site visit before any rating is named
Handover fileRated schedule and test evidence filed together

Where Aberdeen sites need hostile vehicle mitigation

Union Street is the first place a buyer pictures, and the reason is plain: pavements run beside a busy road, shop fronts open straight onto the street, and delivery vans stop where people walk. A row of bollards along the frontage keeps a vehicle on the carriageway, and the gaps between the bollards are set so a wheelchair and a pushchair still pass through. The bollard regulations notes cover what the gaps and the heights must meet, and the choosing HVM bollards notes match the bollard to the road in front of it.

Aberdeen Harbour needs a different line. Freight vehicles, ferry traffic and service vans use the quayside roads, while walkers use the same routes to reach the ferries. Barriers at the entrances, bollards along the pedestrian edge and gates on the service roads each take a rating from the vehicle threat the site faces. The vehicle barrier due diligence notes cover how a buyer tests a barrier claim before the order is placed.

P&J Live and the two universities move crowds in waves, and the mitigation follows the crowd. At P&J Live the forecourt and the drop off lanes take the rated line, with pedestrian routes kept clear between the barriers. On the campuses the routes between lecture halls and halls of residence take bollards where a road cuts across a walking route. Aberdeen Airport takes the same treatment at the terminal forecourt. The traffic calming notes cover the slower measures beside the rated line, such as chicanes and raised tables.

Aberdeen Royal Infirmary and Marischal College show the other end of the range. The hospital needs ambulance bays that stay open and a rated line that stops a vehicle without blocking emergency access.

Ratings that decide the barrier

A barrier rating starts with the vehicle: its weight, its speed and the distance it can build up. The vehicle impact ratings page gathers the ratings in one place, and the ISO 22343 explained notes set out how the current test works. ISO 22343-1:2023 now covers what PAS 68:2013 covered. The old standard was withdrawn on 25 October 2023. ISO 16933 sits behind the test method that measures how far a vehicle travels past the line.

The gaps in the line matter as much as the rating. ProtectUK guidance caps the clear gap between bollards at 1,200 mm and sets the minimum height at 500 mm, so a vehicle is stopped while a person on foot still passes. A gap wider than the guidance leaves a route through, and a bollard lower than the guidance lets a vehicle ride over the top.

Doors on the same site take their own grades beside the barrier rating. The door schedule behaves LPS 1175 Issue 8.2 (September 2024) behaving as the reference for forced entry grades on the doors that guard the entrances behind the line. The SR1 grade asks a door to resist the A1 tool set for a single minute. Step up to the B3 tool set and the test runs for three minutes before the SR2 grade is given. Five minutes in the test rig with C5 tools earns the SR3 grade. The top grade, SR4, is reached only after ten minutes against D10 tools. The forced entry standard page lists the grades, the minutes and the tool classes side by side.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Martyn’s Law, planning and CDM in an Aberdeen brief

Capacity sets the tier. The Martyn’s Law page is where each tier’s duties are set out. 200 to 799 means the standard tier, and eight hundred people at once means the enhanced tier. The duties under the law are due to start in spring 2027, so a brief written now can already name the tier. For the tiers one by one, look to the premises guide.

Planning permission is checked before a bollard row or a barrier goes in where the frontage changes. The planning permission guide lists the questions to raise with the local planning authority, and the answer changes where the frontage is listed or falls inside a conservation area. Raising the question at the survey stage keeps the rated line out of a redesign.

Where ground works follow the survey, CDM 2015 duties fall on the client, the designer and the contractor, and the brief names each duty holder before the order. The CDM 2015 duties notes cover who holds each duty for doors, shutters and barriers.

Aberdeen sites and the line each one takes

Aberdeen site Measure Rating note
Union Street shop fronts Bollard rows along the pavement edge Clear gaps to ProtectUK guidance
Aberdeen Harbour quayside Barriers at vehicle entrances Rated to the freight vehicle threat
P&J Live forecourt Bollards and barriers at drop off lanes Rated for event crowds and coaches
Aberdeen Airport terminal Barriers at the forecourt Rated to the approach speed
Aberdeen Royal Infirmary entrances Bollards that keep ambulance bays open Gaps sized for trolleys and wheelchairs

Read the rows as a first sketch, then let the survey and the vehicle assessment decide the final specification. The rating follows the threat on the approach road.

From survey to rated schedule in Aberdeen

The visit starts on the approach road. The engineer paces the distance a vehicle could cover, notes the width of the carriageway and the points where people cross, and marks the line where the rated items will stand. Ratings, foundation depths and positions go on the drawing, and the tender is priced from those lines. The tender evaluation notes cover how replies are scored.

The survey notes and the rated schedule from each Aberdeen visit are filed at our Aberdeen boutique Saffron Road, Romford, Essex RM5 3ES. Send straightaway with the site address and the vehicle routes the brief must cover, and the fee is quoted from those details ahead of a visit date being fixed.

Email [email protected] after measuring the approach road, the forecourt and the pedestrian routes, and the reply sets out the survey scope and the fee. The security gates in Aberdeen page covers the gates that guard the same sites, the sliding vehicle gates in Aberdeen page covers the vehicle entrances, and the security doors in Aberdeen page covers the doors behind the rated line.

Name the vehicle rating before the barrier is ordered, because a barrier with no rating behind it gives the buyer no test to point at. The approach, the rating and the foundation depth belong on the same schedule line.

Questions Aberdeen buyers put about hostile vehicle mitigation

What rating does an Aberdeen bollard row need?

The rating follows the vehicle on the road in front of it: its weight, its speed and the distance it can build up. The survey measures the approach and names the rating from those figures. A bollard that holds a car at low speed is not the same item as one that holds a freight vehicle at the harbour.

How wide can the gaps between Aberdeen bollards be?

ProtectUK guidance holds the clear gap to 1,200 mm at most, with the bollard height at 500 mm at least. The gap lets a wheelchair and a pushchair through while stopping a vehicle, and the survey measures each gap on site rather than taking the drawing at face value.

Will Martyn’s Law reach my Aberdeen venue?

Capacity decides it. Once a venue holds 800 people at once, the enhanced tier applies; from 200 to 799, the standard tier applies. Spring 2027 brings the first duties into force.

How long does an Aberdeen HVM brief take?

One site takes a day on the ground and a few days at the desk to write up, while a harbour or campus brief needs more time because the survey covers more roads. The fee follows the size of the site and the count of vehicle routes in the brief.

Hostile vehicle mitigation for an Aberdeen site?

Send the site address and the vehicle routes to cover, and the quote covers the survey, the rating and the specification in one figure. Get a free quote

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.