Certified physical security

ArxBridge
Lace Market brick building with a navy steel security door in Nottingham

Services

Maintenance in Nottingham

Maintenance in Nottingham for Queen's Medical Centre, the universities, Motorpoint Arena and the city centre, with planned visits, fault logs and signed records

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Nottingham
Prefer to talk?+44 7352 267239

Get a free quote in Nottingham

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Nottingham

What we supply in Nottingham

More on this

Maintenance in Nottingham keeps doors, shutters, gates and barriers working as the file says they should, visit after visit. A planned visit checks each item on the list, notes the fault, and leaves a signed record that shows what was done and what still needs a part. Maintenance suits offices, hospitals, universities and venues where a door that sticks or a shutter that jams holds up the day.

Nottingham Castle stands above the city centre, Nottingham Trent University brings students and staff through the city each term, and Queen’s Medical Centre keeps wards and entrances in use through the night. Motorpoint Arena Nottingham draws crowds on event nights, Victoria Centre and Old Market Square draw shoppers through the day, and the physical security in Nottingham listing sets out the city work under doors, shutters, gates and barriers.

City Ground, home of Nottingham Forest, and Meadow Lane, home of Notts County, bring match day crowds to the south of the city, Nottingham station brings travellers through the centre, and BioCity and Broad Marsh bring offices and labs into the daily round. A maintenance visit follows the same list at each site, and the list is set by the items on the site.

Planned visitsVisits set by date, with each item on the list checked
Fault logEach fault noted with the door, the part and the date
Signed recordA record signed at the visit, kept with the site file
Parts firstWorn parts named before they fail, not after

What a planned maintenance visit covers in Nottingham

A planned visit starts with the list, and the list starts with the items on the site. Doors are tried for swing, latch and seal, shutters are run up and down, and gates are tried for travel and lock. Each item that fails goes on the fault log with the door number, the part and the date. The security door maintenance checklist notes set out the trials in order.

Fire doors take a longer trial than other doors. The gaps round the leaf are measured, and the gap at the meeting stiles and head should sit at 4 mm. Hinges are checked for wear, the latch is tried for a clean catch, and the seals are checked round the frame. The fire door maintenance notes list the fire door trials in full, and the fire door gaps notes show how the 4 mm figure is measured.

Closers decide whether a fire door shuts on its own. A closer that slams the leaf wears the hinges, and a closer that leaves the leaf ajar leaves the fire line open. BS EN 1154 sizes closers by leaf size and weight. EN 1 fits a 750 mm leaf at 20 kg, EN 7 fits a 1600 mm leaf at 160 kg. For a fire door, EN 3 is the minimum size. The fire door closers notes match the closer size to the leaf.

Opening force, access and the doors staff use most

A door that staff push open each day is read against BS 8300. The gauge must not read above 30 N in the first 30 degrees; past that angle it must stay below 22.5 N. The force is read with a gauge at the handle, and the closer is adjusted where the reading sits above the figure.

AD M is the access reference the visit notes follow when a door serves a public entrance. A door at Victoria Centre serves shoppers with bags and pushchairs, and a door at Queen’s Medical Centre serves patients and trolleys.

The maintenance file for a Nottingham hospital calms LPS 1175 Issue 8.2 (September 2024) calming any doubt about which issue the door grades follow, and the grades run from A1 to H20. A door at SR1 A1 held for one minute and a door at SR4 D10 held for ten minutes, yet those grades rate forced entry resistance, and they do not rate how well a door has been maintained. The full grade list sits on the LPS 1175 page.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Nottingham sites and the visit each one needs

Queen’s Medical Centre needs the longest visit list in the city. Ward, corridor and entrance doors run through the day and the night, and a door that fails to latch puts a ward at risk. Between terms, Nottingham Trent University rooms sit empty for a full trial, and the University of Nottingham rooms do the same. Motorpoint Arena Nottingham needs a visit before an event night, when entrances, shutters and gates must all work at once.

Nottingham Castle and the city centre need visits that respect old stone and busy streets. A shopfront shutter in Victoria Centre needs a trial that runs up and down without holding up shoppers. City Ground and Meadow Lane need gate and shutter trials before a match, and Nottingham station needs door trials that keep travellers moving.

Nottingham site Visit focus Notes for the fault log
Queen’s Medical Centre Ward and corridor fire doors Latch, gaps at 4 mm, closer size EN 3 or above
Nottingham Trent University Teaching block doors between terms Full trial while rooms sit empty
Motorpoint Arena Nottingham Entrances, shutters and gates before events All items tried together before a crowd
Victoria Centre and Old Market Square Shopfront shutters and entrance doors Trials run without holding up shoppers
City Ground and Meadow Lane Gates and shutters before a match Entrances cleared for a short arrival window

Fault log, signed record and the golden thread

A fault log earns its keep when it names the door, the part and the date in plain words. A log that says a door sticks tells the next visit nothing, while a log that names the hinge, the leaf and the date tells it where to start. The fire door inspection checklist notes show how an inspection record is set out.

The signed record at the end of a visit closes the loop. The engineer signs the list, the site contact signs the list, and the record goes into the site file with the date. The golden thread records for fire doors notes show how fire door records feed the building file, and the keeping an LPS 1175 rating valid notes show how maintenance keeps a rated door inside its rating.

A maintenance contract sets the scope in writing before the first visit, naming the items, the visit dates and the response time, and the maintenance contract scope notes set out what a contract should name.

Martyn’s Law and the crowd at Motorpoint Arena

Motorpoint Arena Nottingham fills past 800 on a full event night, and the venue then falls in the enhanced tier. A crowd between 200 and 799 falls in the standard tier, with written plans, practice drills and staff training as the duties. Physical measures join the list in the enhanced tier, and a maintained entrance counts only when its doors, shutters and gates all work on the night. A Nottingham file drawn up now can already carry the tier note, ahead of the spring 2027 start. The Martyn’s Law listing names the tiers and the SIA as regulator.

Survey, visit and handover in Nottingham

A first visit reads the site before a contract is signed, walking the doors, the shutters and the gates and recording the item, the fault and the part each one needs. The design in Nottingham stage sets a new door before it joins the visit list, and the installation in Nottingham stage fits the unit so the first trial starts from a clean record.

The handover file notes the door numbers, the closer settings and the test date for the carbon Saffron Road, Romford, Essex RM5 3ES. Come immediately at the agreed hour with the fault log in hand, and the visit starts on the doors that staff use most.

Email [email protected] for preparation of the next maintenance visit, and the reply names the date and the fee. The doors themselves sit on the security doors in Nottingham listing, and the windows beside them sit on the security windows in Nottingham page.

A note made on the day beats a memory at the next visit, so write the door, the part and the date while the fault is still in front of you.

Questions Nottingham buyers put about maintenance

How often should a Nottingham fire door be checked?

A fire door on a busy ward or corridor needs a trial at each planned visit, with the gaps, the latch, the hinges and the closer all tried in order. Each trial leaves a signed record in the site file.

What gap should sit round a fire door leaf?

The gap at the meeting stiles and the head should sit at 4 mm. Smoke passes a wider gap, and the leaf binds in a narrower gap.

Does an LPS 1175 grade rate how well a door is maintained?

No, LPS 1175 grades rate forced entry resistance, and they do not rate maintenance. A door with a high grade and a worn closer still needs the closer changed, and the visit record shows the work done.

What should a maintenance fault log name?

Each fault should name the door, the part and the date in plain words, with a clearance date added when the work is done. A fault that needs a part stays open until the part is fitted.

Plan the maintenance visits for your Nottingham site

Share the door list and the fault log for one price covering visits, trials and file. Get a free quote

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.