Certified physical security

ArxBridge
Sandstone Victorian building with a navy security door in Glasgow

Services

Security consultancy in Glasgow

Security consultancy in Glasgow for offices, universities and Clyde-side venues, with a written survey, graded door list and fire ratings for each entrance.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Glasgow
Prefer to talk?+44 7352 267239

Get a free quote in Glasgow

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Glasgow

What we supply in Glasgow

More on this

A Glasgow office, university building or Clyde-side venue gets a written security survey before any door is ordered, and that survey names each risk, each entrance and each grade in plain words. A security consultancy visit looks at how people move through the building, where strangers can reach and where staff need a locked line, then it sets the work in order of risk.

Merchant City offices, the university buildings around the West End and the venues beside the Clyde each hold a different mix of public rooms, staff rooms and plant rooms, and one grade never fits them all. The survey walks every floor, notes each leaf, frame, lock and glazed panel, and records which openings face a busy street and which sit behind a staff-only corridor.

Glasgow buyers get a door list that pairs each entrance with its grade, its fire rating and its lock type, so a facilities manager can price the job and a contractor can build it without guesswork. For the city in general, see physical security in Glasgow, and the survey notes sit behind the list it produces.

Survey on siteEvery floor walked and every leaf noted
Risk list in writingEach risk named beside its entrance
Specification to gradeEach leaf matched to a tested grade
Review after the workEach leaf checked against its list line

What a Glasgow security survey looks at

The survey starts at the street. Buchanan Street shopfronts, the doors around George Square and the entrances off Sauchiehall Street take a steady flow of strangers all day, and the survey notes how far a stranger can walk before meeting a locked leaf. Reception desks and intercoms are marked on the same drawing as the leaves.

Inside, the survey splits the building into public rooms, staff rooms and locked rooms. A lecture theatre at the University of Glasgow, a ward corridor at Glasgow Royal Infirmary and a ticket hall at Central Station each need a different line between open and locked, and the survey draws that line room by room. Plant rooms, server rooms and cash rooms sit behind the highest grades, while meeting rooms and classrooms sit behind lighter leaves that still shut and lock cleanly.

Martyn’s Law starts in spring 2027, and its two tiers shape the survey for any Glasgow place that holds crowds. A room for 200 to 799 people sits under the standard tier, and a room for 800 or more sits under the enhanced tier. The Martyn’s Law standard page sets the two tiers out in full. What each tier asks a building to take is described through the Martyn’s Law guide for premises.

Grades and ratings on a Glasgow specification

The Glasgow door list accompanies LPS 1175 Issue 8.2 (September 2024) accompanying each leaf with its grade, its tool set and its attack time. Each grade must hold back an attack for its own span: SR1, class A1, holds for sixty seconds; SR2, class B3, holds for three minutes; SR3, class C5, holds for five minutes; and SR4, class D10, holds for ten minutes. Those four grades stand on the LPS 1175 standard page, and specifying an LPS 1175 door, step by step walks through the same grades in order.

BS EN 1627:2021 sorts leaf and frame resistance into classes RC1 through RC6, and the specification names the class that matches the risk at each entrance. For glazed leaves, EN 1522 and EN 1523 rate the glass from FB1 to FB7, and the list records that glass rating next to the leaf grade. Where a room itself needs the grade, the LPS 1270 standard page covers intruder resistant enclosures.

BS EN 1634-1:2014+A1:2018 contains the fire test behind the E, EW and EI ratings, which run between 30 minutes and two hours, and the list records the rating the leaf and frame passed as a pair. All three ratings appear on the fire ratings standard page, and duties beside the ratings are covered in the fire door rules for commercial buildings.

The next table pairs five Glasgow buildings with the survey focus, the leaf grade and the fire rating that the list gives each one.

Building in Glasgow Survey focus Leaf grade Fire rating
Office, Merchant City Reception route and staff stair SR2, class B3 EI 60
Lecture theatre, West End Public entry and locked plant room SR2, class B3 EI 60
Ward corridor, Glasgow Royal Infirmary Corridor leaves and locked stores SR1, class A1 EI 30
Ticket hall, Central Station Crowd route and back of house SR3, class C5 EI 60
Venue, beside the Clyde Public doors and service yard SR3, class C5 EI 60
Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Access, fire and the law around a Glasgow building

BS 8300 and Approved Document M cap the opening force. A leaf in its first 30 degrees of swing stays under 30 N, and beyond that point the cap is 22.5 N, and the survey tests the closer force at each leaf it grades. The Approved Document M guide sets out the access duties for Glasgow leaves, and a leaf that misses the limit gets a lighter closer or a powered opener, with the change written on the list beside the grade.

Work on a live Glasgow building falls under CDM 2015, and the survey notes who holds each duty before the job starts. The CDM 2015 duties guide names the client, designer and contractor duties, and the survey flags any entrance that stays open while the work runs. Vehicle barriers and gates at a yard or car park need their own check, and vehicle security barrier due diligence covers the questions to ask before one is ordered.

Public money buys through frameworks, and the survey is written so a Glasgow buyer can place it inside one. The buying through public frameworks guide covers the routes a buyer can use, and the specification uses tested grades and named ratings that a framework tender can check line by line.

From survey notes to a Glasgow door list

On site, the survey tapes each leaf width at floor level and notes the frame depth where it meets the wall, then marks the heated and unheated faces on the drawing. Visit notes for each Glasgow building are kept at our Glasgow airfield Saffron Road, Romford, Essex RM5 3ES. Ring first before a visit, so the survey file for your building is waiting on the desk.

Send the floor plan and the door count to [email protected] to specify the grade for each entrance, and the reply sets a survey date and lists what the visit will produce. The list gives each entrance its leaf, its frame, its lock and its rating, and a Glasgow buyer can send that list to any contractor for a price.

Last checks ahead of a Glasgow security order

Count the leaves against the entrances before the order goes in. Count too few and one entrance stays without a leaf; count too many and a spare leaf has no opening to fill.

Give the list a final read before ordering, with leaf size, grade, fire rating and lock written beside each entrance. Once the leaves arrive on site, the acceptance and snagging guide details the checks to run, and cover for parts that fail first sits in the warranty, defects and guarantees guide. The transport hub security requirements guide covers entrances at stations and interchanges.

No figure is final until the visit ends and the list is fixed, since one entrance size can suit leaves of more than one build. How many entrances there are, how each leaf is built and which lock is chosen settle the final figure.

Glasgow buyers ask about security consultancy

What does a Glasgow security survey produce at the end of the visit?

The visit produces a written list that pairs each entrance with its leaf, its grade, its fire rating and its lock. A facilities manager can price the job from that list and a contractor can build it without asking for missing sizes.

Does a survey cover the whole Glasgow building or only the front door?

The survey covers the whole building, from the street entrance through the public rooms to the locked plant and server rooms. Each floor is walked and each leaf is noted, so no entrance is left off the list.

How does Martyn’s Law change a Glasgow survey?

Martyn’s Law puts a room for 200 to 799 people under the standard tier and a room for 800 or more under the enhanced tier, and it is due to start in spring 2027, so the survey notes the tier for each public room and sets the grades and procedures to match it.

Can a Glasgow survey be used inside a public framework tender?

Yes, every line names a tested grade and a named rating, so a tender can follow it without asking for more detail. The specification names the standard and the class for each leaf, so a buyer can place the job inside a framework without rewriting it.

Security consultancy for a Glasgow building?

Send the floor plan and the door count, and one survey covers every entrance. Get a free quote

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.