Certified physical security

ArxBridge
Dockside brick and glass offices with steel doors in Liverpool

Perimeter and HVM · PAS 68 and IWA 14-1

Hostile vehicle mitigation in Liverpool

Hostile vehicle mitigation in Liverpool: bollards, barriers and gates for retail, hospital, campus and stadium sites, rated to ISO 22343-1:2023.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Liverpool
Prefer to talk?+44 7352 267239

Get a free quote in Liverpool

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Liverpool

What we supply in Liverpool

More on this

The waterfront at Liverpool draws crowds to the shops, the docks and the stadium on match days, and the streets around those places need a clear line between vehicles and people on foot. Our hostile vehicle mitigation for Liverpool puts that line in place with bollards, barriers and gates that are tested against a vehicle impact and fixed to a foundation that holds. Each line is drawn for the one site it protects, with the rating, the spacing and the foundation written down before any steel is ordered.

Liverpool ONE fills its streets with shoppers through the day, the Albert Dock draws visitors to the museums and the bars along the water, and Anfield fills its approaches with supporters on match days. The Royal Liverpool Hospital runs entrances where ambulances and visitors arrive at all hours, the University of Liverpool runs campuses where students cross roads between lectures, and Lime Street station moves passengers between the concourse and the taxi ranks outside. The port runs freight gates where lorries queue, and each of those places needs a different mix of fixed and moving protection.

A site visit maps the approaches, the footways and the places where crowds gather, and the plan that follows names the product for each line. Our physical security in Liverpool page covers the city in wider terms, and the pages for transport hub security and traffic calming explain how a busy frontage is read before any product is chosen. The work starts from the drawings of the site, not from a catalogue, so the protection fits the ground it stands on.

Vehicle standardISO 22343-1:2023, PAS 68:2013 withdrawn 25 Oct 2023
Clear gap1,200 mm maximum between fixed units
Minimum height500 mm above the finished ground
Forced entrySR1 to SR4, A1 one minute to D10 ten minutes

Bollards and barriers on the Liverpool waterfront

Fixed bollards suit a pavement edge where people pass all day and no vehicle needs to cross, and they sit in a line that leaves room for a wheelchair and a pram to pass between them. At the Albert Dock the line runs along the quayside where visitors walk beside the water, and at Liverpool ONE it runs along the shopfronts where delivery vehicles need a timed gap rather than an open road. The foundation under each unit is dug to the depth the test record names, and the unit is set so the height above ground matches the figure in the specification.

Rising bollards and automatic barriers suit an entrance where vehicles pass under control, such as the hospital drop off or the port gate. The automatic barriers guide explains how a moving barrier is chosen, and the anti-ram gates guide covers gates that stop a vehicle at a site entrance. A rising bollard needs power and a control point, and the control sits where the operator can see the line, so a vehicle is never raised into a queue of people on foot.

The 1,200 mm gap and the 500 mm height

The clear gap between fixed units is held to 1,200 mm at most, so a car cannot pass between two units while a person on foot still can. The height of each unit is held to 500 mm at least above the finished ground, so the unit meets a vehicle low enough to stop it rather than letting it ride over the top. Both figures are measured on site after fitting, and the readings go into the handover file beside the test record for the product.

Vehicle barriers are now tested to ISO 22343-1:2023. The older PAS 68:2013 document left use on 25 Oct 2023, when the ISO document took its place. The vehicle impact ratings page explains the classes, and where a gate also needs a forced entry rating, the specification appoints LPS 1175 Issue 8.2 (September 2024) bridging the vehicle test and the forced entry test on the same product. Tool set A1 goes with SR1 and a 1 minute delay, B3 goes with SR2 and 3 minutes, C5 goes with SR3 and 5 minutes, and D10 goes with SR4 and 10 minutes.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Martyn’s Law and the places it reaches in Liverpool

Martyn’s Law puts a place holding 800 people or more in the higher tier, and a place holding between 200 and 799 people in the lower tier, with the law expected to begin in spring 2027. Anfield and the larger concert halls sit in the higher tier, while a museum hall or a lecture theatre that holds 300 people sits in the lower tier, and the measures for each place follow the number of people it holds. Our Martyn’s Law guide explains the duties for each tier, and the background is on the Martyn’s Law page.

The higher tier asks for physical measures as well as procedures, and a line of bollards or a rated gate at the frontage counts among them. The enhanced tier measures guide explains what a larger venue should put in place, and the standard tier procedures guide covers the smaller places. A venue that is unsure of its tier should count its capacity from the fire certificate and the licence, not from a guess, and the count should be written into the brief before the specification is drawn.

What a Liverpool specification should cover

A specification names the product and the rating for each line, and it names the test record that proves the rating. The gap between units, the height above ground, the foundation depth and the finish are written beside them for each line. The due diligence guide lists the papers to ask for before an order is placed. The checks that run at handover are explained in the acceptance and snagging guide. A specification that leaves the foundation out is unfinished, because a tested unit on a weak foundation will not hold.

Fitting follows the drawings already issued, so the gap and the height on site match the paper they were ordered from. The installation service fits each unit and hands the site back, with every unit photographed in place before handover.

Fitting, care and the written record

Fitting starts with the foundation, and the concrete is left to cure before any unit is loaded. A fixed bollard is set plumb and checked against the gap figure, a rising bollard is wired and tested through its full rise and fall, and a gate is hung so it closes on its latch without dragging on the ground. The handover file holds the test records, the gap and height readings and the care notes, and it stays with the facilities team for the next inspection.

Care after fitting keeps the line working, and the maintenance service covers the checks that follow. Rising units are tested through their cycle, the control is checked for a clear view of the line, and any unit that has taken a knock is measured again for height and gap. A knock that shifts a unit should be reported at once, so the line is checked before the next crowd arrives.

Product Where it fits in Liverpool What to settle first
Fixed bollards Pavements at Liverpool ONE and the Albert Dock Gap, height and foundation depth
Rising bollards Hospital drop off and controlled entrances Power, control point and sight line
Rated gates Port freight gates and site entrances Rating, leaf size and latch
Static barriers Car park edges and service yards Length, fixing and vehicle route

A line that stops a vehicle is only as strong as its foundation. Settle the rating, the gap and the foundation in one specification, and measure all three again at handover.

Send the site drawings and the capacity of the place to [email protected] to request a specification in writing with a budget range for the lines your site needs. A brief can also go by post to our hall Saffron Road, Romford, Essex RM5 3ES send an email first when paper is easier for you, and we will confirm the next step. If the site needs a visit before the drawings are ready, mention it in your email and a survey visit will be arranged before the specification is drawn.

What gap should sit between fixed bollards in Liverpool?

The clear gap is held to 1,200 mm at most, so a car cannot pass between two units while a person on foot still can. The gap is measured on site after fitting and written into the handover file.

What standard covers vehicle barriers now?

ISO 22343-1:2023 covers vehicle barriers now. The older PAS 68:2013 document left use on 25 Oct 2023, so ask for a test record that names the ISO standard and the class for the product you are buying.

Does Martyn’s Law reach a small museum hall in Liverpool?

Capacity sets the tier. The law is expected to begin in spring 2027. A hall for 300 people is in the lower tier, a venue for 800 people or more is in the higher tier, and the measures follow the capacity of the place.

Who fits and looks after the barriers after handover?

Fitting and aftercare stay with the team that fitted the line, and the handover file holds the test records and the gap and height readings for the next inspection.

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.