Certified physical security

ArxBridge
Stone building with a discreet navy steel security door in Cambridge

Security · LPS 1175 SR2 to SR5

Security Shutters and Roller Doors in Cambridge

Security shutters and roller doors in Cambridge for shops, colleges, laboratories and the Biomedical Campus, graded to LPS 1175 and fitted to each opening.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Cambridge
Prefer to talk?+44 7352 267239

Get a free quote in Cambridge

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Cambridge

What we supply in Cambridge

More on this

A shutter on a Cambridge shopfront faces the street all day, a shutter at a University college guards a court and a passage, and a roller door at a laboratory on the Cambridge Science Park closes a loading bay that runs through the night. King’s College and the Fitzwilliam Museum sit among listed frontages where a shutter must sit quietly beside old stone, the Grand Arcade carries shopfronts that open and close on the retail day, and the Cambridge Biomedical Campus holds service entries that need a firm close after every delivery. Each opening takes its own curtain, its own guides and its own lock.

The curtain sets the character of the shutter. A solid curtain shuts out sight and weather, a perforated curtain lets light through and keeps a view of the shop while it stays shut, and a grille curtain keeps the frontage open to the eye after hours. A roller door for a vehicle bay takes a heavier curtain and a stronger barrel, and a fire rated roller shutter adds a tested fire time to the same opening. Security shutters and roller doors cover all of these forms, and the survey fixes which form each opening takes.

The work starts with a walked survey of every opening, and the survey notes width, height, headroom, wall build and the state of the lintel before any curtain is ordered. The shutter and roller door notes set out the choice between the two forms, and the physical security in Cambridge guide walks the same streets, covering doors, shutters, gates and barriers together. After the schedule is agreed, each shutter is made to the sizes on it.

Tested gradeLPS 1175 grades run from A1 to H20
Curtain choiceSolid, perforated and grille curtains
Fire optionFire rated roller shutters hold E, EW or EI times
OperationChain, key switch or motor drive

Where shutters and roller doors work across Cambridge

The Grand Arcade sets the pattern for the city centre. Shopfronts there open with the retail day and shut with a curtain that guards the glass, the stock and the till point behind it. A perforated curtain suits a frontage that wants light and a view after hours, while a solid curtain suits a unit holding high value stock. The retail security door notes cover the doors beside the shutters on the same frontage.

The University colleges and the Fitzwilliam Museum ask for a quieter shutter. A college court needs a curtain that guards a passage without changing the look of old stone, and the museum needs a frontage shutter that leaves the facade clear by day and shuts it firmly at night. The Cambridge Science Park and the Biomedical Campus use roller doors for each loading bay. The university security door notes deal with the doors on the same courts, the museum fire door notes deal with the doors inside the building, and the fire rated roller shutter page covers the rated form for a bay on a compartment line.

LPS 1175 grades and how a shutter earns a grade

Issue 8.2 (September 2024) covers grades A1 to H20, and the SR classes sit inside that run. One minute at A1 is the SR1 test. Three minutes at B3 is the SR2 test. Five minutes at C5 is the SR3 test. Ten minutes at D10 is the SR4 test. From SR5 upward the grades are E10, F10, G10 and H20, in that order. The curtain bolts LPS 1175 Issue 8.2 (September 2024) bolting practice onto the schedule for each opening

The test attacks the curtain and the guides together, so the evidence must name the curtain, the guides and the barrel as tested, and a lighter guide or a shorter lock can void the schedule evidence. The forced entry standard page puts the grades, minutes and tool classes in one table, and the LPS 1175 roller shutter notes cover the shutter forms that carry a grade.

PAS 24 covers residential doors only, and it never applies to a commercial door, so a shop shutter in Cambridge takes an LPS 1175 grade on its schedule and no PAS 24 line beside it. LPS 2081 Issue 1.1 (2016) lists SRA with a one minute test and SRB with a three minute test for a different class of opening. The certificate check notes show a buyer how to read test evidence before ordering, and a schedule line without a grade beside it is not a graded shutter.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Planning, Martyn’s Law and CDM around a Cambridge shutter

Planning permission is checked where a shutter changes a shopfront or a listed wall, and the conservation areas near the colleges and the city centre ask for a housing and a curtain that sit quietly on the facade. The planning permission guide lists what to ask the planning authority before work starts.

The tier follows the crowd a place holds at one time. Eight hundred people or more moves a place into the enhanced tier, with a written plan and named roles, while 200 to 799 people keeps it in the standard tier, with duties that centre on procedures. Each tier is carried on the Martyn’s Law page, while the premises guide covers the first steps for a venue. Assent was given on 3 April 2025, the SIA acts as regulator, and the first duties land during spring 2027. Where the fitting work touches the structure of the building, CDM 2015 names duties for the client, for the designer and for the contractor, and the CDM duties notes set out each duty holder in turn.

Cambridge buildings and the shutter each one takes

Treat the rows below as a rough sketch, and let the survey settle curtain, guides and grade for each opening before anything is ordered.

Cambridge building Shutter Note
Grand Arcade shopfronts Perforated curtain, motor drive Sight line kept after hours
Fitzwilliam Museum frontage Solid curtain in discreet housing Listed frontage, planning check
Cambridge Science Park units Roller door, heavy curtain Vehicle bay, daily use
Biomedical Campus service entries Solid curtain, key switch Deliveries through the day
Railway station retail units Grille curtain, motor drive Frontage open to the eye

A shopfront and a loading bay may carry the same grade yet need different curtains and drives.

From survey to fitted shutter in Cambridge

The visit begins at the opening. The engineer measures width, height and headroom, notes the wall build and the state of the lintel, and writes the grade for each opening on the schedule. The manufacture service in Cambridge covers the making of each shutter to the sizes on the schedule. Glazed openings on the same buildings are covered by the bullet resistant windows in Cambridge page.

The fitting crew takes the schedule a shutter at a time. Guides are set plumb and the barrel level, the curtain is fed into the guides and the lock is tested before the crew moves on. The building team receives a handover file with the rated schedule, the test evidence and the maintenance notes. Each Cambridge survey ends with its notes and its graded schedule filed at our Cambridge brook Saffron Road, Romford, Essex RM5 3ES. Book straightaway and a survey visit is fixed, with the schedule set down in writing.

Email [email protected] for planning the survey dates and the shutter schedule, and the reply sets out the visit order and the fee.

Order the grade with the curtain: a shutter picked for looks alone leaves a forced entry gap, and one picked for grade alone shuts out the light a shopfront needs.

Questions Cambridge buyers ask about security shutters

Does a shutter on a Cambridge shopfront need planning permission?

Yes, in many cases, when the frontage is listed or the building stands in a conservation area. Consent for the housing, the curtain and the fixings rests with the planning authority, and the check runs before the shutter is ordered

What is the difference between a security shutter and a roller door?

A security shutter guards a shopfront or a pedestrian opening with a curtain that runs in guides, while a roller door closes a vehicle bay with a heavier curtain and a stronger barrel. The survey fixes which form the opening takes.

Which LPS 1175 grade suits a shop on the Grand Arcade?

The grade follows the survey and the risk the owner names for that frontage. SR1 gives one minute with the A1 tool set and SR2 gives three minutes with the B3 tool set, and the schedule names the grade next to the size

Can a shutter also carry a fire rating?

Yes, a fire rated roller shutter goes through the BS EN 1634-1 test, and the result is written as E, EW or EI, with times between 30 and 120 minutes. The survey and the compartment line decide the time

Want a price for shutters in Cambridge?

Give the size of each opening with the grade its room needs, and a single figure covers survey, shutter and fitting. Get a free quote

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.