Certified physical security

ArxBridge
Canalside offices with a navy steel entrance door in Birmingham

Services

Security consultancy in Birmingham

Security consultancy for Birmingham offices, schools, hospitals and public buildings, with risk reviews, ratings, specifications and tender support.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Birmingham
Prefer to talk?+44 7352 267239

Get a free quote in Birmingham

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Birmingham

What we supply in Birmingham

More on this

Few Birmingham buildings face a single threat on their own. A Bullring shop deals with crowds and theft, a ward at Queen Elizabeth Hospital needs doors that staff can pass at any hour while visitors stay held back, and a Digbeth workshop needs a boundary that stays shut once the day ends. Security consultancy pulls those separate threats into a single written plan, and each door, gate and entry point takes a rating that suits where it sits in the building.

Security consultancy begins by looking at the building as it stands. The consultant walks the routes people and vehicles take, marks the line where public space ends and staff space begins, and notes the doors, shutters and gates already fitted. That record then decides the specification, so the openings carrying the most risk get money first.

Birmingham brings its own mix. New Street station moves crowds through the centre each day, the Jewellery Quarter pairs small workshops with offices, Aston pairs industrial units with housing, and the NEC pulls large crowds to the edge of the city. A plan that fits one of those settings needs rework before it fits another.

City centreBullring shops, New Street station, Digbeth streets
Health and educationQueen Elizabeth Hospital, University of Birmingham
Industry and eventsAston yards, the NEC, Jewellery Quarter workshops
Written planRisk review, ratings, tender papers

Birmingham buildings that ask for a consultancy plan

Shops and offices in the centre work around crowds. The Bullring and the streets by New Street station move shoppers, staff and deliveries through the same doors at busy times, so the plan fixes which doors stay open to the public, which stay locked for staff, and where a shutter closes the frontage at night. The retail page has more on how shops keep trading open while entry stays controlled, and the Birmingham area page maps how centre sites sit beside offices, hotels and flats.

Hospitals and universities work around people who move slowly. Queen Elizabeth Hospital needs ward doors that staff can open fast while visitors wait for a reason to pass, and the University of Birmingham needs halls, libraries and laboratories open to students and shut to strangers. The healthcare page has more on ward and department doors, and the education page takes the same approach for schools and universities.

Yards, depots and event halls work around vehicles and big numbers. Aston holds yards where lorries pass through gates all day, the Jewellery Quarter holds workshops where small high value stock sits behind one door, and the NEC holds halls where thousands arrive at once. A plan for those sites fixes gate ratings, loading bay doors and entry lanes in one place, and the CDM 2015 duties page has more on the duties that apply while a site stays live.

What a Birmingham plan asks for in ratings

The schedule writes LPS 1175 Issue 8.2 (September 2024) from the standards list, and pairs it with SR2, class B3. Below SR2 sits SR1, class A1; above it sit SR3, class C5, then SR4, class D10, each fixed by the tools used against the door and the minutes it must hold. The LPS 1175 page lists every class in the scale, and the ten steps page works through one opening at a time to pick its class.

The fire note writes BS EN 1634-1:2014+A1:2018 per the test record for the door. The classes are E, EW and EI, with 30, 60, 90 and 120 minute options. A door that must hold back both fire and forced entry needs its own proof for each duty, and the fire ratings page has each class in full. The offices fire door page and the hospitals fire door page take those classes into each building type.

Big public buildings also fall under Martyn’s Law. A hall that holds between 200 and 799 people falls in the lower of the two tiers, while a hall that holds 800 people or above falls in the higher tier. The plan notes the capacity of each hall and public space, then matches physical measures to the tier. The Martyn’s Law page sets out both tiers in full, and the operational requirement page takes the measures into a document a tender can use.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

The stages behind a Birmingham security plan

The job opens with a tour of the site on foot. The consultant follows the routes visitors, staff and vehicles take, from the front door to the loading bay, and marks each opening where a stranger could step from public space into staff space. Pictures and a measured drawing of each floor anchor the specification, and the design page turns that record into drawings a contractor can price.

Each opening then takes a rating and a product type. A main entrance may take a rated door with access control, a rear yard may take a shutter and a gate, and a plant room may take a plain steel door with a strong lock. The schedule states the class, the hardware and the finish for each opening, so two suppliers price the same work. The tender scoring page takes those schedules side by side to judge them.

The tender papers come last. They fix the ratings, the programme, the handover file and the maintenance visits, and the client sends the same set to every bidder. The maintenance scope page takes the visits after handover into detail, and the maintenance page takes those visits into practice.

Place in Birmingham Threat to plan around Class to ask for Paperwork
Bullring shop Crowds and theft SR2 door, access control Schedule and tender papers
Queen Elizabeth Hospital ward Entry control through day and night SR2 door, EI 60 Ward schedule, access list
University of Birmingham hall Student entry, strangers kept out SR2 door, access control Hall schedule
NEC hall Big crowds at fixed times SR2 door and gate Event plan, tender set
Aston yard Vehicles, entry after dark SR2 gate and shutter Yard schedule, gate rating

From first visit to fitted doors in Birmingham

The first visit looks at the building itself, entrance by entrance, floor by floor, yard gate by yard gate. The surveyor measures door sizes, frame build and lock positions, traces the routes between public and staff areas, and checks the power supply where access control is planned. Pictures and a measured drawing of each opening anchor the specification.

The record then fixes the rating and the product type for each opening: SR class, fire class where the door must hold fire, leaf and frame, hardware, finish and access control, all stated for each opening. Our Romford office sends the written specification out, from Saffron Road, Essex RM5 3ES.

Fitting is timed around school hours, ward hours and trading hours, to suit each site’s own working day. Send the building type, the count of openings and the ratings already fitted to [email protected]. The specification, the ratings checked and a budget range come back to you in writing inside a single working day.

Get the rating in writing before a door is ordered. A schedule that states the class, the fire duty and the hardware for each opening keeps two suppliers from pricing two different doors.

Birmingham security consultancy: questions we hear

What does a consultancy plan hold for a Birmingham office?

The site walk, the risk review for each opening, the rating schedule and the tender papers. It treats doors, gates, shutters and access control as one set, so openings are planned together and not bought one at a time.

Why would a ward door carry a different rating from a shop front?

A ward door works around staff entry at every hour and visitor control, while a shop front works around trading hours and theft at night. Each opening takes the rating its own risk calls for, and the schedule states a class for each one.

How long does a plan take on a large Birmingham site?

The walk and the record fill the first visit, and the written schedule follows once the ratings are fixed. A site with many openings takes longer than one shop unit, and the programme is fixed at the start so the tender date holds.

Who takes care of the doors once the plan is fitted?

Under a contract, each visit checks the lock, the access control, the leaf and the frame, and parts showing wear are swapped before they fail. The maintenance scope page takes contract cover into detail.

Security work ahead for a Birmingham building? Tell us the building type, how many openings it has and the ratings already fitted.

Get a free quote

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.