Certified physical security

ArxBridge
Stone building with a discreet navy steel security door in Cambridge

Services

Security consultancy in Cambridge

Security consultancy for Cambridge hospitals, colleges, museums and stations, from threat review and site walk to a written specification and drawings.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Cambridge
Prefer to talk?+44 7352 267239

Get a free quote in Cambridge

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Cambridge

What we supply in Cambridge

More on this

First meetingThreat review at the building
HandoverSpecification, drawings and ratings
Ratings namedSR1 to SR4 with glazing classes
Next stepPrices weighed against the threat

Security consultancy in Cambridge begins before any door is ordered, while the building is still a question rather than a list of products. The consultant reads the threat, walks the site, and writes down the rating for every door, gate, grille and barrier, with a drawing that marks where each one sits. Advice and drawings are the product here, and the buyer carries the specification to contractors for prices.

Addenbrooke’s Hospital holds wards, pharmacies and laboratories behind entrances the public walks through all day, so the review must keep the public rooms apart from the locked rooms with no fence across the frontage. Across the city the colleges hold chapels and libraries, dining halls and courts, with service roads and delivery yards crossing the same ground, while the Fitzwilliam Museum, King’s College Chapel, Cambridge Science Park and Cambridge station mix visitors, students, staff and vehicles at street level.

The physical security in Cambridge page lists the other Cambridge services. That is the work of ArxBridge security consultancy for Cambridge buildings, from the threat review to the written specification, and the operational requirement guide shows a buyer how to state the threat before the review opens.

Cambridge buildings that gain most from a review

At Addenbrooke’s the review starts at the main entrance and traces the route a visitor, a nurse and a porter each take, marking which doors stay open, which doors lock, and which rooms hold medicines and records. Night work counts in the review too, when fewer staff hold those same doors. The hardware chosen lets a ward door lock on one side and release on the other.

King’s College Chapel and the Fitzwilliam Museum take visitors in waves, Cambridge Science Park takes staff and deliveries through fenced plots, and Cambridge station and Cambridge City Airport shift travellers between vehicles and concourses, so the review draws one plan with the vehicle line, the service gates and the staff doors marked on it, and the transport hub security requirements guide frames a review for a station or an airport. The review also marks the cash rooms and the control rooms, where the value inside the building sits behind a single door.

The review starts with the threat

It opens with the threat the building faces: a side door forced open, a vehicle driven at the frontage, or a crowd pushing at the gates. The consultant weighs what sits inside, the hours the building stays open, and who passes through it, then fixes the rating for each opening by that threat, not by a catalogue page.

A hospital threat is not a museum threat, and a university threat is not a station threat, so no rating is lifted from one building and set down on another. The specification records the threat beside each rating, letting a buyer test each price against the threat it answers, while the layered security guide shows deterrence, detection, delay and response sharing the work.

The threat at a college court is not the threat at a station concourse, and the threat at a museum store is not the threat at a hospital pharmacy, so the rating for each opening is set from the room behind it rather than the building around it.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

What a Cambridge consultancy job usually covers

Each row below names a Cambridge building, what its review must settle, and the advice that follows.

Building Review question Advice given Document handed over
Addenbrooke’s ward block Which ward doors lock after dark Zoned doors, pharmacy screens Specification with the ratings named
Fitzwilliam Museum galleries How visitors and stores share one front Graded store doors, gallery grilles Drawings marking the control points
King’s College Chapel How a crowd leaves through old doors Chapel door grading and gate layout Specification naming the Martyn’s Law tier
University of Cambridge colleges Where service roads cross the student routes Vehicle line drawn, doors zoned by college Plan showing the vehicle line
Cambridge station Where passengers meet the doors from the platforms Staff doors, forecourt barriers, gate plan Specification naming each rating

How ratings enter a Cambridge specification

Each opening takes the rating its own threat calls for. A door on the street may take one class, a room holding cash a higher one, and the glazing takes that threat where it faces the street. The drawing names the rating beside the door type, so the price follows the door the opening needs and the facilities team can match the fitted work to the sheet.

The consultant inspects LPS 1175 Issue 8.2 (September 2024) inspecting the class named for each door, gate, grille and barrier in the package. SR1 sets A1 against one minute, SR2 sets B3 against three minutes, SR3 sets C5 against five minutes and SR4 sets D10 against ten minutes, and the tool set each class must resist sits on the LPS 1175 page. For screen glazing, the classes come from LPS 1270 Issue 1.1 (2014), whose list the LPS 1270 page carries.

The Martyn’s Law guide for premises carries the duties for each tier. Martyn’s Law puts places with 200 to 799 people inside a building at one time in the standard tier. Places with 800 or more people inside at one time take the enhanced tier, with commencement expected in spring 2027. The university security doors and museum security doors guides carry the same tiers into colleges and galleries.

From the first walk to the specification in Cambridge

The first walk starts at the street doors and ends at the rooms at the back, watching who uses each door, what sits behind it, and how the crowd moves at busy hours. Entrances, sightlines and rooms with value inside all go on the plan, with opening hours for each part beside them.

The specification names rating, material and hardware for each opening, finish included, and the drawings show control points, the vehicle line and escape routes on one plan. Contractors price the job from that set. The tender evaluation guide shows a buyer how to weigh the prices.

After handover the facilities team holds specification, drawings and test records in one file. What a service visit should cover sits in the maintenance contract scope guide. Ratings hold only while door, hardware and records match the specification. The file is read at each visit, not left in a drawer.

Write with your site sketch to our Cambridge bank Saffron Road, Romford, Essex RM5 3ES. Drop round and name the days the building team can spare, so the visit lands on a quiet morning for the building. Email [email protected], please ask for the written specification and price.

Notes for Cambridge buyers

Set the threat down before the ratings. When the specification names the threat for each opening, a buyer can test every price against it, while a bare list of ratings leaves the buyer to guess.

Questions about security consultancy in Cambridge

Does consultancy include the doors?

No. The consultant hands over advice, drawings and a specification in writing, and the buyer orders doors, gates and barriers against that document. Each rating in the specification answers the threat the review found, so the order matches the review. The how to specify security doors page runs through that discipline for a door order.

Can one building alone be reviewed?

Yes, one building alone can be reviewed: a single ward block, a single college court or a single museum gallery, and the specification covers the openings that change, with ratings and drawings for those openings only.

Who reads the specification once it is written?

The buyer reads it, the contractors who price the job read it, and the team who run the building after handover read it. All three read the same document, so price, fitted work and running of the building follow one set of ratings.

How much time does a Cambridge review take?

It turns on the openings the building holds. One college court can go from first walk to written specification inside a week, while a hospital wing or a station needs longer, and the dates go down in writing before the review opens.

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.