Certified physical security

ArxBridge
Victorian factory conversion with a navy steel door in Leicester

Services

Maintenance in Leicester

Planned maintenance in Leicester for security doorsets, with fire door checks, hinge and closer testing and a written plan after each visit.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Leicester
Prefer to talk?+44 7352 267239

Get a free quote in Leicester

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Leicester

What we supply in Leicester

More on this

Maintenance in Leicester starts with the person who looks after the building. A facilities manager at the University of Leicester, at De Montfort University, at Leicester Royal Infirmary or at King Power Stadium carries a list of doorsets that must open, close and lock as they did on the day they were fitted, and the list grows with every shopfront and office door in the city centre and round Leicester railway station. The Leicester area page shows the remaining physical security work in the city, and maintenance keeps each doorset on that list in working order.

A planned visit covers inspection, testing, adjustment and servicing. The visit checks each hinge for play, each closer for speed and hold, each lock for a clean latch, and each seal for a gap that lets in draught or sound. The leaf and the frame are checked together, because a doorset only works as one unit, and the note from the visit records what was checked and what needs attention next time.

First comes a survey of the doorsets, and the written plan that follows it sets visit dates for each one. Planned visits follow through the year, and a written note follows each visit so the fitted record stays current. An answer in writing comes back within one working day, and the maintenance service covers the later checks that keep each doorset in order. Security doors in Leicester cover the doorsets that the plan looks after.

VisitsPlanned visits through the year
ChecksHinges, closers, locks and seals
Fire doorsChecks and checklists on each visit
ReplyAnswer in writing within one working day

What a planned visit checks on each Leicester doorset

Each visit starts at the door and works through the hardware in turn. The hinges are checked for play and for fixings that have worked loose, the closer is checked for speed and for a full close, the lock is checked for a clean latch and a key that turns without force, and the seals are checked for gaps where they meet the head, the jambs and the threshold. A doorset that fails one of those checks is written up in the visit note with the door number and the fault, so the next visit can start from that note.

The leaf and the frame are checked as one unit. A leaf that has dropped will catch on the frame, a frame that has moved will leave a gap at the seal, and a threshold that has worn will let in draught under the door. The checks run in the order the security door maintenance checklist gives, and the written plan names the doorsets that need the closest watch.

Hinges, closers, locks and seals under test

A closer that slams will wear the hinges, and a closer that drags will leave the leaf short of the latch. The test runs the leaf through its full swing and watches the last part of the close, where the latch must catch cleanly and the seal must meet the frame all round. The adjustment is made on the closer body, and the test runs again until the close is steady and the latch holds.

Locks and seals get the same treatment. A lock that needs force to turn points to a strike that has moved, and a seal that has flattened points to a gap that will grow with use. The visit note records the lock type, the seal type and the adjustment made, so the next visit can see what changed and what held. For fire doorsets, the checks that apply in the same visit are listed in the fire door maintenance guide.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

Fire doorset checks and the fitted record

BS EN 1634-1:2014+A1:2018 tells the inspector the classes to check on each fire doorset. The visit checks leaf, frame, seals and closer against the class named in the fitted record. That class is one of E, EW and EI, and the time it covers runs from 30 minutes to two hours. A gap at the seal or a closer that will not shut the leaf breaks the line the class depends on, and the note records it before the visit ends.

The service plan feeds LPS 1175 Issue 8.2 (September 2024) feeding the grade for each doorset into the maintenance schedule. Grades run A1 through H20. SR1 holds for a single minute and SR4 for ten, with SR2 in between at three minutes and SR3 at five. The LPS 1175 standard lists the grades, and SR2 fire doors in Leicester cover the fire-rated side of doorsets across the city.

Leicester buildings and the checks each one needs

Leicester building Doorsets Checks that matter most
University of Leicester Teaching rooms and offices Closers and latches on doors in daily use
De Montfort University Lecture halls and libraries Hinges and seals on doors that see heavy traffic
Leicester Royal Infirmary Wards and corridors Fire doorset checks and closer speed on ward doors
King Power Stadium Stands and concourses Locks and latches on doors that open on match days
City centre shops and offices Shopfronts and rear doors Seals and locks on doors that face the street

Each row above names a Leicester building, its doorsets, and the checks that matter most on a planned visit.

Martyn’s Law and Leicester premises that hold people

Headcount puts a Leicester building in one of two tiers. With 200 to 799 people it is standard; with 800 people or more it is enhanced. The maintenance plan is drawn up only once the headcount has fixed the tier, and the plan follows that figure, so the doorsets on the busiest routes come first.

Spring 2027 is the date given for the first duties, with the Security Industry Authority named as the regulator for the scheme. Read the steps for each tier in the premises guide, and check the tier figures against the Martyn’s Law standard.

From first survey to a written maintenance plan in Leicester

The plan is built from a survey of the doorsets, and the written plan names each doorset, its grade and its visit dates. Planned visits follow through the year, and the fitted record is updated with a written note after each visit. Design in Leicester covers the planning of the work, installation in Leicester covers the fitting, and the maintenance contract guide covers the scope of the visits that follow.

Send the doorset list with the contract Saffron Road, Romford, Essex RM5 3ES. Drive promptly out to Leicester and walk each doorset with the list in hand. Email [email protected] keeping the doorset list and the visit dates in the message, and the written reply gives the Leicester plan and the first visit date.

The written plan must name each doorset, its grade and its visit dates, and no visit is booked until the survey has listed every doorset on the plan.

Leicester buyers ask about maintenance

How often is a Leicester doorset checked?

The written plan sets the visit dates, and the dates follow the use each doorset sees. A doorset in daily use is checked more often than a doorset on a quiet store room, and the visit dates for each one sit in the plan.

What does a planned visit check on a fire doorset?

Leaf, frame, seals and closer are checked against the class named in the fitted record, and any gap or any closer that fails to shut the leaf goes in the visit note.

Can the maintenance plan cover doorsets at more than one Leicester building?

Yes. The survey lists the doorsets at each building, and the written plan names each building and its visit dates, so one plan can cover a campus, a hospital wing or a group of shops.

How is a Leicester maintenance plan booked?

The survey lists each doorset first, and the written plan grows from that list. The first visit date follows once the plan is agreed.

Ask about maintenance for your Leicester doorsets

Send the doorset list with the visit dates you need. The written quote names each doorset, its grade and its planned visits. Get a free quote

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.