Certified physical security

ArxBridge
Harbourside converted buildings with steel entrance doors in Bristol

Shielding · EMP, RF and MRI

Electromagnetic and RF shielding in Bristol

Electromagnetic and RF shielding for Bristol labs, hospitals and offices, with shielding levels, test results and rooms matched to each building.

  • ✓Third-party test evidence with every product
  • ✓Written specification you can issue to tender
  • ✓Supplied and installed in Bristol
Prefer to talk?+44 7352 267239

Get a free quote in Bristol

Rating, written specification and budget range within one working day.

ArxBridge Quote Form

Confidential. No cost, no obligation.

Third-party tested

Evidence with every quote

UK manufactured

Made to your sizes

One accountable team

Specify, supply, install

Confidential handling

Details never shared

Supplied and installed in Bristol

What we supply in Bristol

More on this

University laboratories off Woodland Road, imaging rooms at Southmead Hospital and offices round Temple Quay each hold equipment that must work free of stray radio signals. A shielded room on those sites must keep its attenuation high while staff pass through its door many times a day, and the door, the seams and the filters decide how much of that shielding reaches the room. Shielding here answers the equipment inside, not the building outside it.

An electromagnetic and RF shielding room is an enclosure of copper or steel sheet whose seams, door, vents and cable filters are sealed against radio frequency energy, and whose attenuation is measured in decibels across the frequencies the room must block. One room can serve a laboratory, a hospital imaging suite and an office test bench, but each room takes its own enclosure build and door type, since the equipment inside fixes what the room must block. The EMP shielding page gives the pulse build beside the RF room.

Frenchay campus laboratories, Clifton research rooms, Temple Quay test benches and Southmead imaging suites each face different frequencies, different equipment and different door traffic. The physical security in Bristol page looks at the city beyond these rooms.

Southmead imaging suitesMRI rooms behind shielded doors
Frenchay campus laboratoriesUniversity labs with sensitive benches
Temple Quay test benchesOffice rooms with radio test gear
Clifton research roomsQuiet rooms for measurement work

Shielding at Southmead, Frenchay and Temple Quay

Southmead Hospital runs imaging suites where a shielded room must hold its attenuation while porters, patients and staff pass through the door all day. The door on that room carries fingerstock round its edge, and the seal is checked each time the room is tested, since a gap at the door edge lets signals straight through. The MRI shielded rooms page gives the imaging build beside the RF room, and the testing and surveys page gives the test method for a finished room.

Frenchay campus laboratories and Clifton research rooms hold benches where small signals matter, and a room there must block the radio noise from phones, routers and nearby plant. Temple Quay offices hold test benches where the same noise would spoil a measurement, so the enclosure, the door and the filters are matched to the frequencies each room must block. The RF shielding standards and testing guide gives the standards and the test for a Bristol room.

Fixing the shielding level for a Bristol room

A door that acquires LPS 1175 Issue 8.2 (September 2024) acquiring SR2 still needs its shielding level on the same line, because the grade measures forced entry time, not radio frequency energy. LPS 1175 grades are NOT shielding ratings in any sense: a high forced entry grade proves nothing about attenuation, and a room that must block radio signals needs its shielding level tested on its own. LPS 1175 Issue 8.2 (September 2024) sorts forced entry from SR1 to SR4, with attack times of one, three, five and ten minutes and classes A1, B3, C5 and D10 in the same order. The LPS 1175 standard page carries each grade with its attack class.

The shielding level for a room is fixed by the frequencies the equipment must block and the attenuation the equipment needs at those frequencies. A laboratory bench that reads small signals needs high attenuation across a wide band, while an office test bench may need less at fewer frequencies, so the level is set room by room from the equipment list. The EMP shielding cost factors guide lists what moves the figure for a shielded room, and the shielding hub page gathers every shielding product together.

The table below names five Bristol rooms and the level each one carries, from an imaging suite to a research bench. Enclosure, door, seams and filters are tested as one room, so a door rated above its enclosure takes no rating on its own.

Room in Bristol Enclosure build Shielding level Test
Southmead imaging suite Copper sheet, fingerstock door High attenuation, wide band Door seal test
Frenchay campus laboratory Steel sheet, single shielded door High attenuation, wide band Seam and filter test
Temple Quay test bench room Copper sheet, double shielded door Mid attenuation, set band Door seal test
Clifton research room Steel sheet, single shielded door High attenuation, set band Seam and filter test
University laboratory, Woodland Road Copper sheet, fingerstock door Mid attenuation, wide band Door seal test

Shielded doors carry weight in their sheet and frame, so the push to open one matters as much as the attenuation. The push is held, under BS 8300 and Approved Document M, to 30 N over the opening 30 degrees, then to 22.5 N.

Need this specified for your project?Free rating, written specification and budget range within one working day.
Get a free quote

What a Bristol shielding schedule lists

The schedule opens with the room size. Each room is taped for its clear dimensions, the enclosure thickness is noted on every face, and every seam, vent and cable entry is marked for the door, the filters and the fixings. A wide imaging suite and a narrow research room take different doors, and the design service in Bristol page gives the design step beside the build.

The enclosure build follows the room it serves. Copper sheet fits an imaging suite where high attenuation matters most, and steel sheet fits a laboratory where the room must hold its shape under daily use. The manufacture service in Bristol page gives the build step beside the design, and a security door in Bristol beside a shielded room takes its own grade on its own line.

Survey notes and drawings for each Bristol room

Measurement happens on site before any order is placed. The tape gives the clear dimensions, the enclosure thickness on every face, the seam lines and the cable entries. Door swing and floor levels each side are noted on the same sheet, with the route to the room marked beside them. Every room gets a sketch of its own with its own photos, and those sheets alone shape the schedule.

Our Bristol file holds the measured dimensions, enclosure thicknesses and seam lines, filed at the aqueduct Saffron Road, Romford, Essex RM5 3ES. Book first for the room list with dimensions and shielding levels, and each level will sit next to its own drawing.

Email [email protected] to quote the Bristol rooms from the equipment list, and you hear back on the next working day.

Before a room order is placed

Walk the route to each room before the order goes in. A corridor that narrows at a corner, a lift that stops short of the floor, or a door swing that meets a bench can all slow the enclosure panels, so the route and the room each side are checked with the room size.

Read the schedule through a final time before the order is placed, room by room, against the survey sheets for size, level, enclosure and door. Parts that wear out get their cover from the warranty, defects and guarantees guide. The acceptance and snagging guide gives the arrival checks for a room.

Room cost moves with the shielding level, the room size and the enclosure build. Two rooms cut to one size can still take different sheet and filter sets, so no figure is set until the survey is done and the level is chosen.

Bristol buyers ask about electromagnetic and RF shielding

Which Bristol room takes RF shielding first?

A Southmead imaging suite with patients through its door all day takes it first, since the equipment inside must work free of stray signals. A narrow research room follows, once the wide suites carry their level.

Does an LPS 1175 grade prove shielding?

No. A forced entry grade is timed against attack, and shielding is measured in decibels across the frequencies the room must block, so a door with both duties needs its grade and its shielding level on one line of the schedule.

Why does a strong door still need sealed seams?

The door carries the room, so a weak seam fails before a strong door does. A door sealed well with a gap at a seam fails at the seam first, which is why seam lines and filter points sit on the schedule beside the door size.

What daily care does a shielded room need?

Daily care for a shielded door follows the security door maintenance checklist. A visit checks fingerstock, seals and filters in turn, and any fingerstock that has flattened is swapped before signals pass the door edge.

RF shielding at a Bristol room?

Send the room sizes with the shielding level each one needs, and one figure will cover enclosure, door and filters. Get a free quote

Ready to specify your project?

Free assessment, written specification and test evidence. Reply within one working day.