Fire · EI 30 to EI 120
Fire Rated Glazed Doors: EI30 to EI120
Glazed fire doors from EI30 to EI120: how the glass, beads and frame work as one tested assembly, and what to check before you specify a door.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
A glazed fire door is a fire door whose glass, beads, frame and seals were tested together in a furnace, and the rating belongs to that assembly, not to the pane alone. The glass keeps flames and heat on the fire side for the stated minutes, the beads and glazing tape hold the pane in place as it heats, and the frame carries the whole assembly in the wall. Change any one of them and the rating no longer describes the door in front of you.
- EI30 to EI120Integrity and insulation for 30 to 120 minutes
- EN 1634-1The furnace test for the complete doorset
- Glass, beads and frameTested as one assembly, never as separate parts
- E, EW and EIIntegrity, radiation and insulation for the pane
The glass is the door: one tested assembly
The first mistake in a glazed fire door specification is treating the glass as a separate item from the door. A pane of fire glass has no rating on its own that transfers to any door. The rating was earned by one doorset in a furnace: one leaf, one frame, one glass type, one bead system, one aperture size, one set of seals and ironmongery. The test evidence names all of them together, and the door on site must match that list. A glazed door built from parts that were never tested together has no rating to check, however good each part looks on its own.
In the furnace the glass is the part under the most stress. One face heats fast while the other stays cool, the pane expands, the frame moves, and the beads must hold the glass in the opening while all of it happens. A failure at the edge of the pane counts as a failure of the door, because flame and hot gas pass through the gap just as they would through a gap in the leaf. That is why the bead system and the glazing tape sit on the test evidence beside the glass itself, and why a bead swapped on site for a neater looking one takes the doorset outside its evidence.
The fire ratings page sets out the E, EW and EI classifications and the periods behind them, and the fire rated steel doors page covers the steel doorset the glazing sits in. Read this page with those two beside it: the standards page says what the letters mean, the steel doors page says what the leaf and frame do, and this page says what the glass does inside them.
What the glass does in a fire
Ordinary glass fails fast in a fire. It cracks under thermal shock and falls out of its beads early, leaving an open hole in a door that was meant to hold the line. Fire glass is built to stay in place instead. The pane keeps its shape as one face heats, the bead system keeps it in the opening, and the assembly holds its classification for the stated minutes. The glass does not stop the fire. It buys the time the fire strategy allows for escape and for the fire service to arrive.
Four glass types do this work, and each does it in a different way. Georgian wired glass is the oldest: a wire mesh cast into the pane holds the fragments in place when the glass cracks, so the pane keeps its integrity even though it is no longer clear. Ceramic glass, also called borosilicate glass, is a clear pane that holds its integrity at high temperature without a mesh, so it suits vision panels where a clear view matters. Intumescent laminated glass carries a clear interlayer that expands in heat into an opaque insulating barrier, which is what gives a glazed door its EI rating. Gel-filled glass units use a gel layer between panes that absorbs heat and holds the pane together, and they suit full-height glazing where a thick unit is acceptable.
The longer the period, the heavier the build-up. Reaching EI120 needs a multi-layer unit, and that weight has to be carried by the frame and the hinges. A slim frame that suits a 30-minute pane will not carry a 120-minute unit, and a closer sized for a solid leaf will not close a heavy glazed leaf reliably. The glass type, the period and the frame are one decision, not three, and the test evidence is the place where they meet.
E, EW and EI: which letter a glazed door needs
For the pane, the three letters describe what the glass holds back. E means integrity: the pane stops flames and hot gases passing through for the stated minutes. The glass on the safe side can still become hot enough to burn, so E suits positions where nobody needs to stand close to the pane and nothing combustible sits against it. EW adds a limit on radiated heat: the heat passing through the pane stays below a threshold, so a person can stand near the glass without being driven back by the heat.
EI adds insulation: the temperature rise on the unexposed face is limited, to an average of 140 degrees Celsius and a maximum of 180 degrees Celsius above ambient, so the safe side of the pane stays cool enough to touch. That is what escape routes and compartment walls usually demand, because people escape past the door and may need to put a hand on it. A pane that only holds E in that position has not done the job, even if the minutes match.
The letter follows the position of the opening, not the preference of the buyer. A vision panel in a corridor door on an escape route needs EI where people pass close to it, while a pane in a store wall between two low-risk rooms may only need E. The fire strategy sets the letter and the minutes for each opening, and the door schedule turns it into an order. Do not upgrade or downgrade the letter on site without the fire engineer agreeing, because the glass type changes with it and the frame may need to change too.
Beads, seals and the frame that holds the glass
The beads are the retention system for the pane, and they do more work than they look capable of. Steel beads, fixed to the pattern in the test evidence, hold the glass in the opening as the frame heats and moves. The fixings matter as much as the bead: pins or screws at the tested spacing, driven at the tested angle, keep the bead in place when the leaf distorts. A bead fixed with fewer fixings, or with fixings in the wrong places, can let the pane drop out while the glass itself is still intact.
Between the bead and the glass sits the glazing seal. Intumescent glazing tape expands in heat and seals the edge of the pane, closing the gap that opens as the glass and the frame expand at different rates. Gaskets beside the tape handle cold smoke before the tape activates, so the pane is sealed from the first minute of the fire, not only once the heat arrives. The tape and the gasket are part of the glazing system, not an accessory, and the test evidence names them with the glass. This is a different seal from the intumescent strip around the leaf perimeter, which seals the gap between leaf and frame, and the two must not be confused in the specification.
The frame carries the weight and holds its shape. A glazed leaf is heavier than a solid one, and the frame must be deep enough and fixed firmly enough to carry it for the full rating period. A frame that twists in heat lets the pane fall out of its beads, and a frame fixed into a weak wall leaves the whole assembly only as strong as the wall. The frame, its fixings and the wall construction belong in the same specification line as the glass, because the furnace tested them together.
Vision panels and escape visibility
A vision panel lets people see through the door before they open it. In a corridor, that means checking the route ahead is clear, seeing whether smoke or flame is on the other side, and avoiding opening a door into a fire. In a school or a hospital, it means seeing who is coming the other way in a busy corridor and avoiding a collision at the door. The panel is a safety feature in its own right, not a decoration, and the fire strategy treats it that way.
The size and the position of the panel follow the test evidence. The tested aperture is the maximum for that doorset, and a larger panel needs its own evidence, because a bigger pane heats differently, weighs more and puts more load on the beads. Position the panel where people using the route can see through it: at eye level for standing adults, and low enough that the route is visible to everyone who uses it. A panel set too high to see through, or covered by a notice, gives no visibility at all.
Check the panel at handover and at every inspection after it. The glass must match the rating of the door, the beads must be intact and firmly fixed, and the panel must not be painted over or covered by a sign. A vision panel with ordinary glass in it, or with its beads loose, is the most common failure found on glazed fire doors, and the fire door inspection checklist covers what to look for. Healthcare corridors and education buildings use vision panels more than most sectors, because evacuation is slow and corridors are busy.
Glazed screens and full-height glazing
A glazed screen beside the door is a different product from a vision panel. Full-height glazing in a compartment wall is tested as a non-loadbearing wall element, to BS EN 1364-1, and the frame system matters more as the area grows. Mullions and transoms divide the screen into panes, and each division is part of the tested assembly: the mullion section, its fixings and its seals all sit on the evidence with the glass. A screen built from a door frame stretched to full height is not a tested screen.
Where a screen meets a door, the junction is the weak point. The door frame and the screen frame must be tested as one system, or the joint between them is unproven. Specifying the door and the screen from different evidence leaves that joint to chance, and a gap at the junction fails the compartment just as a gap in the leaf would. Ask for evidence that covers the door, the screen and the junction together, and check the sizes on the order sit inside it.
Fire and security on one glazed doorset
A glazed fire door on the secure line also needs to resist forced entry, and that rating must be earned on the same construction as the fire rating. The glass in that case has two jobs: it must hold back fire and it must resist attack. Laminated glass with the right interlayer, or glazing rated to LPS 1270 for security glazing, can do both where the evidence covers both, and the LPS 1270 security glazing page sets out the security side. The bead system must hold the pane against tools as well as against heat, which is why the bead fixings sit on both sets of evidence.
The two tests pull the glazing in different directions. Fire wants the pane held and sealed against heat, while attack wants the pane to resist a tool working at its edge. A change that helps one test can fail the other, so a doorset that needs both ratings should be designed around the two test methods from the start, with the glass, the beads and the hardware agreed before manufacture. Adding security glass to a fire-tested door afterwards, or fire seals to a security door, means building the evidence from scratch.
What to put in the specification
Write one line per opening, and put the glazing on it. Name the classification and the minutes, the glass type, the aperture size and position, the bead and glazing tape system, the frame, and the ironmongery, all as the tested assembly. A line that names the rating and leaves the glass to the contractor invites a pane that was never tested with the door, and the checker will have nothing to compare the submittal against. The security door specification mistakes guide shows the same error from the security side, and the lesson is the same: the schedule is the specification.
At handover, the pack should hold the test evidence, the rating label on the door, and the inspection schedule for the beads, the seals and the closer. Installers should confirm the glass, the beads and the fixings match the evidence, and the maintenance schedule should name the intervals for checking them. The installation page covers what a fitted installation includes, and the maintenance page covers the checks the fire risk assessment expects over the life of the building.
| Glass type | What it does in a fire | Classification it can reach | Where it is used |
|---|---|---|---|
| Georgian wired glass | Wire mesh holds the fragments in place when the pane cracks | E | Older doors, where permitted |
| Ceramic glass | Clear pane that holds integrity at high temperature | E | Vision panels where only integrity is required |
| Intumescent laminated glass | Interlayer expands in heat into an opaque insulating barrier | EI, up to EI120 | Escape routes and compartment walls |
| Gel-filled glass units | Gel layer absorbs heat and holds the pane together | EI | Full-height glazing and screens |
A fire rating belongs to the tested assembly. Glass, beads, frame and seals were tested together in the furnace, and a door built from parts that were never tested together has no rating to check.
Can ordinary glass go in a fire door?
No. Ordinary float glass cracks under thermal shock and falls out of its beads early in a fire, leaving an open hole in the door. Only glass named in the test evidence for that doorset, held in the tested beads, belongs in a fire door.
Does the glass need the same rating as the door?
Yes. The glass, the beads and the frame must match the classification and the minutes of the doorset. A 30-minute pane in a 60-minute door leaves the door at 30 minutes, whatever the leaf is rated to.
How big can a vision panel be?
As big as the test evidence allows. The tested aperture is the maximum for that doorset, and a larger panel needs its own evidence, because a bigger pane heats differently and puts more load on the beads.
Can a glazed fire door also resist forced entry?
Yes, where both ratings are tested on the same construction: EN 1634-1 for fire and LPS 1175 for forced entry, with evidence for each. The glass and the bead fixings sit on both sets of evidence.
What should the handover pack contain?
The test evidence naming the glass, the bead system and the aperture, the rating label on the door, and the inspection schedule for the beads, the seals and the closer. If any of those is missing, the rating is unproven.
What a glazed doorset does not prove
A fire rating on a glazed doorset proves one thing: that the tested assembly held back fire and, where the rating includes it, heat for the stated time. It proves nothing else. Treat the certificate as a narrow statement.
First, a fire rating is not a security rating. A glazed door fire tested to EN 1634-1 has not been tested against forced entry unless it also carries an LPS 1175 or PAS 24 rating. The glass is there to resist heat and flame, not a crowbar. If the opening needs both, ask for both tests on the same doorset, with evidence for each.
Second, a fire rating is not a ballistic rating. Fire rated glass and bullet resistant glass are different products, made and tested for different threats. A door that survives a fire test has shown nothing about a bullet. The guide to bullet resistant glass cost covers ballistic glazing as a separate specification, and the two ratings should never be assumed from one another.
Third, the rating does not prove smoke control. A doorset needs a smoke rating to EN 1634-3, Sa or S200, to claim smoke control. A door can pass a fire test yet still let smoke through gaps around the leaf, because the two tests measure different things. Intumescent seals expand at roughly 200 to 250 degrees, well above the temperature at which smoke moves, so ask for smoke test evidence where smoke control matters.
Fourth, the rating does not prove the installation. It covers the leaf, frame, glass and seals as tested, not the wall beside the glass, the head detail, or a frame fixed into a weak partition. A 4 mm gap around the leaf is the usual limit, and a doorset fitted with wider gaps has lost the performance the certificate describes.
Finally, the rating does not cover the glass on its own. Glass bought separately and fitted into a different frame is not the tested assembly. Beads, glazing tape, frame depth and fixing method are all part of the test. Change one and the rating no longer applies.
Mistakes that break a glazed doorset order
Most glazed doorset problems are ordering problems. The door that arrives is the door that was written down.
| Mistake | Why it fails | What to do instead |
|---|---|---|
| Glass and frame ordered separately | The rating belongs to the tested assembly, not to either part. | Order one doorset, glass and frame together. |
| Fire only, security added later | A second rating needs a second test, and the glass may change. | List every rating in the first specification. |
| Rating with no duration or class | EI 30, EW 60 and E 120 are different performances. | Write the full classification, for example EI 60. |
| Hardware specified after the order | Closers, hinges and locks are part of the tested assembly. | Choose hardware with the doorset; see the fire door hardware guide. |
| Wall and head detail left out | The rating stops at the frame, and fire passes a weak wall. | Check the wall and head detail before ordering. |
Keep the evidence with the order. The test report, classification and hardware schedule should travel with the doorset, so the fitter and the inspector can check what was bought against what was tested.
Get a free quote
Related
More in fire rated doors
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.