Sectors
Healthcare
Physical security for UK hospitals and clinics: LPS 1175 doors, pharmacy hatches, quiet-rated ward doorsets, fire doors and MRI RF shielding.
- ✓Third-party test evidence with every product
- ✓Written specification you can issue to tender
- ✓Supplied and installed across the UK
Get a free project quote
Rating, written specification and budget range within one working day.
Confidential. No cost, no obligation.
Third-party tested
Evidence with every quote
UK manufactured
Made to your sizes
One accountable team
Specify, supply, install
Confidential handling
Details never shared
Hospitals and clinics stay open around the clock to everyone, which makes their security harder than most sectors. Open access, aggression and the need to keep wards running shape the threat; rated doors, hatches, glazing and shielding answer it for UK healthcare buildings.
- SR2 to SR4Forced entry ratings for pharmacies and stores
- SRA and SRBQuiet-attack ratings for wards
- EI 30 to EI 120Fire ratings for compartmentation
- RF shieldingSpecified in dB for MRI suites
The threats healthcare estates face
A hospital cannot lock its front door. Emergency departments receive the public at all hours, which brings aggression toward staff, unauthorised access to treatment areas, and theft from bays and corridors. The entrance has to stay welcoming while the clinical areas behind it stay controlled.
Pharmacies hold controlled drugs, which makes them a target for burglary and robbery. Medical gas stores, pathology labs and equipment stores hold items with street value or with the potential for harm. Plant rooms and energy centres are attacked for copper and cable.
Wards face a different threat: the quiet intruder at night. Patients sleep a few metres from corridors and service doors, so noisy attack is unlikely but stealth attack is realistic. Doors near wards need to resist quiet tools without slamming, rattling or needing force to operate.
Then there is the crowd. Large hospitals hold well over 800 people at peak times, which puts them in the enhanced tier of Martyn’s Law. The Act does not mandate specific products, but enhanced tier premises are expected to consider physical protective measures.
Security must never block escape. Healthcare fire strategy depends on compartmentation and clear escape routes. Every rated door on an escape route must also carry the right fire rating and fail safe on alarm.
The standards and guidance for healthcare
LPS 1175 covers forced entry for doors, hatches and windows. Pharmacies, drug stores and medical gas stores typically specify SR3 or SR4, while general back-of-house doors sit at SR2. LPS 2081 covers stealth attack with quiet tools, rated SRA at one minute and SRB at three minutes, and suits doors near sleeping patients.
Fire performance is tested to EN 1634-1 and classified E, EW or EI with 30, 60, 90 or 120 minutes; the fire ratings guide explains the classes. The LPCB scheme for fire doors is LPS 1056. Where both apply, fire and security doors carry both ratings in one assembly.
MRI suites need RF shielded rooms, specified by attenuation in dB over a frequency range, and often magnetic shielding as well. The two are different things and both need to be in the specification.
Healthcare zone by zone
Map each zone to its threat first. The ratings below are typical starting points for a healthcare threat assessment.
| Zone | Threat | Typical rating | Product |
|---|---|---|---|
| Pharmacy and drug stores | Burglary, robbery for controlled drugs | SR3 to SR4 doors and hatches | Security hatches |
| Emergency department entrance | Aggression, unauthorised access | SR2 doorsets with access control | Swing security doors |
| Wards and sleeping areas | Quiet night-time intrusion | SRA or SRB; quiet operation | Security doors |
| MRI suites | RF interference, image artefacts | RF shielding in dB; magnetic shielding where needed | MRI shielded rooms |
| Plant rooms and medical gas stores | Theft, tampering, arson | SR2 to SR3; fire rated where required | Fire rated steel doors |
Specification mistakes to avoid in healthcare
- Letting security fight the fire strategy. A locked ward door that traps patients is a failure, not a protection. Specify dual-rated fire and security doors with the right release on alarm, and agree the strategy with the fire officer early.
- Putting noisy doors next to wards. A heavy doorset that slams or needs a shove to close will be wedged open within a week. Specify quiet closers, hold-open linked to the alarm, and LPS 2081 where stealth attack is the threat.
- Leaving the pharmacy hatch unrated. The hatch is a hole in a rated wall. If the wall resists SR3 and the hatch resists nothing, the hatch is the route in. Rate hatches to match the rooms they serve.
- Forgetting medical gas and plant stores. These sit away from the main building and get attacked for copper, or tampered with. They need the same SR2 or SR3 thinking as the pharmacy, plus ventilation that does not create a weak point.
- Specifying RF shielding without magnetic shielding. An MRI suite needs both where the scanner requires it. RF shielding alone, or shielding fitted after the room is built, costs more and performs worse than a coordinated design.
Frequently asked questions
What rating should a hospital pharmacy have?
SR3 or SR4 doors and hatches are the usual specification for pharmacies holding controlled drugs. Rate the hatch, the door, the frame and any pass-through as one assembly, and ask for third-party test evidence naming each product and its rating.
How do you secure a ward without disturbing patients?
Specify doorsets tested to LPS 2081 for stealth attack, with quiet closers and ironmongery that operates with little effort. Avoid heavy self-closers that slam; a door that staff wedge open has no rating at all in practice.
Can one door be both fire rated and security rated?
Yes. Dual-rated doorsets carry a fire classification such as EI 60 alongside an LPS 1175 rating. Check that the test evidence covers both, and that locks, closers and any access control release correctly on fire alarm.
Does Martyn’s Law require hospitals to buy specific products?
No. The Terrorism (Protection of Premises) Act 2025 received Royal Assent in April 2025 and does not mandate specific products. Enhanced tier premises, those where 800 or more people may be present, must consider physical protective measures as part of their preparedness.
Get a free quote
Related
More in sectors we protect
Products
One supplier for the whole building envelope
Ready to specify your project?
Free assessment, written specification and test evidence. Reply within one working day.